X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28609"

(Created page with "== Well Details == {{129-28609-Details}} __TOC__ == Well Inspection Data == {{129-28609-inspection}} == Production Data == {{129-28609-production}} == Waste Data == {{129-2860...")
 
m
 
(17 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{{129-28609-Details}}
+
{| class="wikitable welldetails" width="95%"
__TOC__
+
| Well ID: 37-129-28609
== Well Inspection Data ==
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.134661, -79.364092 | width=100% | height=100% }}
{{129-28609-inspection}}
+
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Westmoreland_County,_Pennsylvania|Westmoreland]]
 +
|-
 +
| Municipality: [[Donegal Township,_Westmoreland_County,_Pennsylvania|Donegal Township]]
 +
|-
 +
| Operator Name: [[XPR RESOURCES LLC]]
 +
|-
 +
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: KALP 1-5H
 +
|-
 +
| License Status:
 +
|-
 +
| Spud Date:
 +
|-
 +
| Permit Date: 2011-06-06
 +
|-
 +
| Well Type: GAS
 +
|-
 +
| Unconventional Well: Y
 +
|-
 +
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: Yes
 +
|-
 +
| Latitude: 40.134661
 +
|-
 +
| Longitude: -79.364092
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-06-06
 +
| New Permit Application
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 
== Production Data ==
 
== Production Data ==
{{129-28609-production}}
+
{| class="wikitable sortable" width="95%"
== Waste Data ==
+
!scope="col" | Period
{{129-28609-waste}}
+
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2011
 +
| [[XPR RESOURCES LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[XPR RESOURCES LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
|}-->
 +
 
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 1994363
 +
| Primary Facility
 +
| 2011-06-21
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Site visit was part of routine inspection.  Road, pad and pits were under construction.
 +
|-
 +
| 1994405
 +
| Primary Facility
 +
| 2011-06-29
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Site visit was conducted to address landowners concerns.  The Kalps, ARM and HRI were represented along with the DEP.
 +
|-
 +
| 2000746
 +
| Primary Facility
 +
| 2011-07-25
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Site visit was part of routine inspection.  Mr. Kalp came on site during inspection.  No one else was on site.
 +
|-
 +
| 2012817
 +
| Primary Facility
 +
| 2011-10-21
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Site visit was part of routine inspection.  Patterson-UTI Rig #480 was on site.  Spoke with Joe Ray Company Man on site.
 +
|-
 +
| 2026777
 +
| Primary Facility
 +
| 2011-12-05
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| WELL PERMITED BUT NOT DRILLED.  E&S AND PITS, GOOD
 +
|-
 +
| 2034564
 +
| Primary Facility
 +
| 2012-01-11
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Site visit was part of routine inspectiion.
 +
|-
 +
| 2438918
 +
| Primary Facility
 +
| 2015-12-15
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| WPX started the process of plugging Kalp 1-9H well on December 14, 2015. WPX pumped 30 bbl. of down tubing and 70 bbl. down casing to kill well.  Removed production tree and set BOP.  CIBP was set at 7500 feet.  On December 15, 2015, WPX ran wireline to determine free casing location at 1250 feet.  Pulled casing to first collar and removed casing of 27 joints.
 +
|-
 +
| 2438937
 +
| Primary Facility
 +
| 2015-12-17
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| WPX continued the process of plugging Kalp 1-9H well on December 16, 2015. WPX set 2 3/8” tubing to the CIBP at 7500 feet. C&J cementers cemented 7500 to 1050 feet with 1000 foot interval plugs using 1545 bbl comprised of 690 sacks of 15.2 # class A cement (1.25 yield and 5.3 GPS).  On December 17, 2015, TIH tag cement at 580 feet C&J cementer cemented 580 feet to surface using 42.5 bbl. with 190 sacks of Class A cement.
 +
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 12:26, 16 May 2020

Well Details

Well ID: 37-129-28609
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Donegal Township
Operator Name: XPR RESOURCES LLC
Well Pad ID:
Farm/Lease Name: KALP 1-5H
License Status:
Spud Date:
Permit Date: 2011-06-06
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.134661
Longitude: -79.364092

For data sources see[1][2][3]

Well History

Date Event
2011-06-06 New Permit Application

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2012 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1994363 Primary Facility 2011-06-21 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection. Road, pad and pits were under construction.
1994405 Primary Facility 2011-06-29 Routine/Complete Inspection No Violations Noted Site visit was conducted to address landowners concerns. The Kalps, ARM and HRI were represented along with the DEP.
2000746 Primary Facility 2011-07-25 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection. Mr. Kalp came on site during inspection. No one else was on site.
2012817 Primary Facility 2011-10-21 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection. Patterson-UTI Rig #480 was on site. Spoke with Joe Ray Company Man on site.
2026777 Primary Facility 2011-12-05 Drilling/Alteration No Violations Noted WELL PERMITED BUT NOT DRILLED. E&S AND PITS, GOOD
2034564 Primary Facility 2012-01-11 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspectiion.
2438918 Primary Facility 2015-12-15 Plugging(Includes Plugged/Mined Through) No Violations Noted WPX started the process of plugging Kalp 1-9H well on December 14, 2015. WPX pumped 30 bbl. of down tubing and 70 bbl. down casing to kill well. Removed production tree and set BOP. CIBP was set at 7500 feet. On December 15, 2015, WPX ran wireline to determine free casing location at 1250 feet. Pulled casing to first collar and removed casing of 27 joints.
2438937 Primary Facility 2015-12-17 Plugging(Includes Plugged/Mined Through) No Violations Noted WPX continued the process of plugging Kalp 1-9H well on December 16, 2015. WPX set 2 3/8” tubing to the CIBP at 7500 feet. C&J cementers cemented 7500 to 1050 feet with 1000 foot interval plugs using 1545 bbl comprised of 690 sacks of 15.2 # class A cement (1.25 yield and 5.3 GPS). On December 17, 2015, TIH tag cement at 580 feet C&J cementer cemented 580 feet to surface using 42.5 bbl. with 190 sacks of Class A cement.

For data sources see[6]

References