m |
m |
||
(4 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-129-28725 | | Well ID: 37-129-28725 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.365379, -79.480605 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Pennsylvania |
|- | |- | ||
− | | Operator Name: [[ | + | | County: [[Westmoreland_County,_Pennsylvania|Westmoreland]] |
+ | |- | ||
+ | | Municipality: [[Salem Township,_Westmoreland_County,_Pennsylvania|Salem Township]] | ||
+ | |- | ||
+ | | Operator Name: [[PENN VIEW EXPLORATION CORP]] | ||
|- | |- | ||
| Well Pad ID: [[148378]] | | Well Pad ID: [[148378]] | ||
Line 15: | Line 19: | ||
| Farm/Lease Name: FRYE UNIT 13H | | Farm/Lease Name: FRYE UNIT 13H | ||
|- | |- | ||
− | | | + | | License Status: |
+ | |- | ||
+ | | Spud Date: | ||
+ | |- | ||
+ | | Permit Date: 2012-01-11 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
+ | |- | ||
+ | | Unconventional Well: Y | ||
+ | |- | ||
+ | | Configuration: Horizontal Well | ||
+ | |- | ||
+ | | Conservation: Yes | ||
+ | |- | ||
+ | | Latitude: 40.365379 | ||
+ | |- | ||
+ | | Longitude: -79.480605 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2012-01-11 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2012-01-19 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2012-05-18 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2012-11-25 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-03-24 | ||
+ | | DEVIATED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | == Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | | 1 | ||
+ | | 2012-11-14 | ||
+ | | 2012-11-14 | ||
+ | | style="text-align: right;" | 6,808 | ||
+ | | style="text-align: right;" | 5,539,606 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |} | ||
+ | ==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="13"| 1 | ||
+ | | rowspan="1"| EC6486A | ||
+ | | rowspan="1"| Nalco | ||
+ | | rowspan="1"| Scale Inhibitor | ||
+ | | Ethylene glycol | ||
+ | | 107-21-1 | ||
+ | | style="text-align: right;" | 30.00 | ||
+ | | style="text-align: right;" | 0.00710000 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="3"| Biocide EC 6116A | ||
+ | | rowspan="3"| Nalco | ||
+ | | rowspan="3"| Biocide | ||
+ | | Dibromoacetonitrile | ||
+ | | 3252-43-5 | ||
+ | | style="text-align: right;" | 5.00 | ||
+ | | style="text-align: right;" | 0.00117000 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | | 2,2-Dibromo-3-nitrilopropionamide | ||
+ | | 10222-01-2 | ||
+ | | style="text-align: right;" | 30.00 | ||
+ | | style="text-align: right;" | 0.00702000 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | | Polyethylene glycol | ||
+ | | 25322-68-3 | ||
+ | | style="text-align: right;" | 60.00 | ||
+ | | style="text-align: right;" | 0.01 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="1"| EC6673W | ||
+ | | rowspan="1"| Nalco | ||
+ | | rowspan="1"| Iron Control | ||
+ | | Ethylene glycol | ||
+ | | 107-21-1 | ||
+ | | style="text-align: right;" | 30.00 | ||
+ | | style="text-align: right;" | 0.00688000 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="1"| 7.5 Hcl Acid | ||
+ | | rowspan="1"| | ||
+ | | rowspan="1"| Used to open perfs | ||
+ | | Hydrochloric acid | ||
+ | | 7647-01-0 | ||
+ | | style="text-align: right;" | 7.50 | ||
+ | | style="text-align: right;" | 0.27 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="1"| Proppant (lbs) | ||
+ | | rowspan="1"| | ||
+ | | rowspan="1"| Proppant | ||
+ | | | ||
+ | | | ||
+ | | style="text-align: right;" | 9.54 | ||
+ | | style="text-align: right;" | 10.64 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="1"| WG-36 GELLING AGENT | ||
+ | | rowspan="1"| Halliburton Energy Services | ||
+ | | rowspan="1"| Water Viscosifier | ||
+ | | Guar gum | ||
+ | | 9000-30-0 | ||
+ | | style="text-align: right;" | 100.00 | ||
+ | | style="text-align: right;" | 0.00234000 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="1"| ASP 900 | ||
+ | | rowspan="1"| Nalco | ||
+ | | rowspan="1"| Friction Reducer | ||
+ | | Ammonium sulfate | ||
+ | | 7783-20-2 | ||
+ | | style="text-align: right;" | 30.00 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="1"| Clean Volume (gals) | ||
+ | | rowspan="1"| | ||
+ | | rowspan="1"| Carrier/Base Fluid | ||
+ | | | ||
+ | | | ||
+ | | style="text-align: right;" | 90.46 | ||
+ | | style="text-align: right;" | 100.00 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="2"| GBW-30 BREAKER | ||
+ | | rowspan="2"| Halliburton Energy Services | ||
+ | | rowspan="2"| Gel Breaker | ||
+ | | Carbohydrates | ||
+ | | | ||
+ | | style="text-align: right;" | 95.00 | ||
+ | | style="text-align: right;" | 0.00058000 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | | Hemicellulase enzyme | ||
+ | | 9012-54-8 | ||
+ | | style="text-align: right;" | 15.00 | ||
+ | | style="text-align: right;" | 0.00009000 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="1"| FR-66 Friction Reducer | ||
+ | | rowspan="1"| Halliburton Energy Services | ||
+ | | rowspan="1"| Friction Reducer | ||
+ | | Distillates, petroleum, hydrotreated light | ||
+ | | 64742-47-8 | ||
+ | | style="text-align: right;" | 30.00 | ||
+ | | style="text-align: right;" | 0.03 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =FracFocus Fracking Chemicals Database | ||
+ | | date = 2019-04-02 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-06-19 }}</ref> | ||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator Name | ||
+ | !scope="col" | Gas Quantity (mcf) | ||
+ | !scope="col" | Gas Production Days | ||
+ | !scope="col" | Oil Quantity (bbl) | ||
+ | !scope="col" | Oil Production Days | ||
+ | !scope="col" | Water Quantity (bbl) | ||
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 602,865.00 | ||
+ | | style="text-align: right;" | 334 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 578,059.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 398,132.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 293,275.00 | ||
+ | | style="text-align: right;" | 366 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 238,509.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 104,567.00 | ||
+ | | style="text-align: right;" | 212 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[PENN VIEW EXPLORATION CORP]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
+ | !scope="col" | Waste Type | ||
+ | !scope="col" | Quantity | ||
+ | !scope="col" | Disposal Method | ||
+ | !scope="col" | Waste Facility ID | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Drill Cuttings | ||
+ | | style="text-align: right;" | 3.41 Tons | ||
+ | | LANDFILL | ||
+ | | 100434 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 3,173.30 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW001 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Fracturing Fluid Waste | ||
+ | | style="text-align: right;" | 72.42 Tons | ||
+ | | LANDFILL | ||
+ | | 073 114 654 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 4,544.00 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 7,494.90 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW001 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 170.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW001 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 556.00 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW001 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 36,132.20 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Fracturing Fluid Waste | ||
+ | | style="text-align: right;" | 6.47 Tons | ||
+ | | STORAGE PENDING DISPOSAL OR REUSE | ||
+ | | MID074259565 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,578.00 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2015 |
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 834.99 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2016 |
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 260.35 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 353.34 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2017 |
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,540.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW001 | ||
|- | |- | ||
− | | | + | | 2017 |
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 110.01 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
|- | |- | ||
− | | | + | | 2017 |
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 36.67 Bbl | ||
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2017 |
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 208.33 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2018 |
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 112.33 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2018 |
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 36.67 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[PENN VIEW EXPLORATION CORP]] | ||
+ | | Waste comment only | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[PENN VIEW EXPLORATION CORP]] | ||
+ | | Waste comment only | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | NO VALUE REPORTED | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Waste Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
+ | !scope="col" | Inspection Comments | ||
|- | |- | ||
| 2036198 | | 2036198 | ||
+ | | Primary Facility | ||
| 2012-01-23 | | 2012-01-23 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Well had been spudded, drilling was not ongoing at the time of the inspection. Well pad construction ahd been completed, well stimulation impoundment construction was still underway. All access road and site erosion controls had been implemented as outlined in the ESCGP. There was no evidence of accelerated erosion or sedimentation in relation to the access road or well-site. The operator should monitor the site and access road eorsion controls and maintain them as neccesary. | | Well had been spudded, drilling was not ongoing at the time of the inspection. Well pad construction ahd been completed, well stimulation impoundment construction was still underway. All access road and site erosion controls had been implemented as outlined in the ESCGP. There was no evidence of accelerated erosion or sedimentation in relation to the access road or well-site. The operator should monitor the site and access road eorsion controls and maintain them as neccesary. | ||
− | |||
− | |||
|- | |- | ||
| 2039240 | | 2039240 | ||
+ | | Primary Facility | ||
| 2012-01-31 | | 2012-01-31 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
− | | Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained. Inspection conducted w/OGI J. Branan. | + | | Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained. Inspection conducted w/OGI J. Branan. |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2045690 | | 2045690 | ||
+ | | Primary Facility | ||
| 2012-02-22 | | 2012-02-22 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained. | | Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained. | ||
− | |||
− | |||
|- | |- | ||
| 2048769 | | 2048769 | ||
+ | | Primary Facility | ||
| 2012-03-06 | | 2012-03-06 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| Highlands Rig#2 Speedstar cleaning hole (damp) at 1424' at time of inspection. Pit lined and freeboard maintained. | | Highlands Rig#2 Speedstar cleaning hole (damp) at 1424' at time of inspection. Pit lined and freeboard maintained. | ||
− | |||
− | |||
|- | |- | ||
| 2056001 | | 2056001 | ||
+ | | Primary Facility | ||
| 2012-03-30 | | 2012-03-30 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Well topholed and ready for Patterson rig; On pad with Fry 14h and 15H; Location good; E&S good | | Well topholed and ready for Patterson rig; On pad with Fry 14h and 15H; Location good; E&S good | ||
− | |||
− | |||
|- | |- | ||
| 2066497 | | 2066497 | ||
+ | | Primary Facility | ||
| 2012-05-10 | | 2012-05-10 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| Patterson-UTI Rig#255 nippling up BOP at time of inspection. Closed loop system being utilized. Pit lined and freeboard maintained. | | Patterson-UTI Rig#255 nippling up BOP at time of inspection. Closed loop system being utilized. Pit lined and freeboard maintained. | ||
− | |||
− | |||
|- | |- | ||
| 2069689 | | 2069689 | ||
+ | | Primary Facility | ||
| 2012-05-21 | | 2012-05-21 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| TD of hole: 11360; Ran 11320' 5 !/2"csg; Cement w/67bbls; 285 sks Varicem cement; 14.2ppg;Yield=1.32ft3/sk; 5.84 galsk; followed by Gasstop 208 bbls; 885sks; 14.2;1.32yield; 5.85ft3/sk; Tail in with Fraccem; 110bbls; 280 sks; 15.2ppg; 2.2Yield; 9.13ft3/sk;'; cement returns; Patterson rig 255 moving off location; | | TD of hole: 11360; Ran 11320' 5 !/2"csg; Cement w/67bbls; 285 sks Varicem cement; 14.2ppg;Yield=1.32ft3/sk; 5.84 galsk; followed by Gasstop 208 bbls; 885sks; 14.2;1.32yield; 5.85ft3/sk; Tail in with Fraccem; 110bbls; 280 sks; 15.2ppg; 2.2Yield; 9.13ft3/sk;'; cement returns; Patterson rig 255 moving off location; | ||
− | |||
− | |||
|- | |- | ||
| 2116918 | | 2116918 | ||
+ | | Primary Facility | ||
| 2012-11-20 | | 2012-11-20 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Site stable no violations | | Site stable no violations | ||
− | |||
− | |||
|- | |- | ||
| 2118993 | | 2118993 | ||
+ | | Primary Facility | ||
| 2012-11-28 | | 2012-11-28 | ||
+ | | Incident- Response to Accident or Event | ||
| Violation(s) Noted | | Violation(s) Noted | ||
| Violations noted | | Violations noted | ||
− | |||
− | |||
|- | |- | ||
| 2129637 | | 2129637 | ||
+ | | Primary Facility | ||
| 2013-01-10 | | 2013-01-10 | ||
+ | | Compliance Evaluation | ||
| No Violations Noted | | No Violations Noted | ||
| Compliance inspection the result of violations written on 11/29/2012. At the time of inspection the soil and rock affected by the brine spill on 11/28 appears to have been removed. At the time of inspection the well appears to be drilled and is actively being equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. | | Compliance inspection the result of violations written on 11/29/2012. At the time of inspection the soil and rock affected by the brine spill on 11/28 appears to have been removed. At the time of inspection the well appears to be drilled and is actively being equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. | ||
− | | | + | |- |
+ | | 2180092 | ||
+ | | Primary Facility | ||
+ | | 2013-07-02 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the well appears to be drilled and is actively being equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. | ||
+ | |- | ||
+ | | 2195289 | ||
+ | | Primary Facility | ||
+ | | 2013-08-14 | ||
+ | | Administrative/File Review | ||
+ | | Viol(s) Noted & Immediately Corrected | ||
+ | | Administrative review the result of a restoration extension request submitted to the Department on June 5 2013. During the restoration review process the Department notes that the Operator was approximately 4 months past the restoration date, when the restoration extension was filed with the Department. According to the well record submitted to the Department by the Operator the well was drilled to total depth on 5/18/2012 making the restoration date 2/18/2013, the subsequent violation is for the failure to restore the site within 9 months or file for a site restoration extension within the same time frame. | ||
+ | |- | ||
+ | | 2251079 | ||
+ | | Primary Facility | ||
+ | | 2014-03-06 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. The Department notes that the site has been regraded, and mulched, however no growth observed. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events. | ||
+ | |- | ||
+ | | 2278646 | ||
+ | | Primary Facility | ||
+ | | 2014-06-16 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. The Department notes that the site has been regraded, and mulched, with good growth. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events. | ||
+ | |- | ||
+ | | 2366785 | ||
+ | | Primary Facility | ||
+ | | 2015-04-28 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Well operating and properly identified. | ||
+ | |- | ||
+ | | 2367099 | ||
+ | | Primary Facility | ||
+ | | 2015-05-05 | ||
+ | | Site Restoration | ||
+ | | No Violations Noted | ||
+ | | Site inspection in response to a "Well Site Restoration Report" filed with the Department on 11/26/2014. At the time of inspection the well was drilled and equipped for production. Well apparatus and brine tank appeared to be in sound condition. All earth disturbance activities associated with the site appear to be complete, stabilized and have sufficient growth. PCSM BMPs are installed and appear to be functioning properly. | ||
+ | |- | ||
+ | | 2468850 | ||
+ | | Primary Facility | ||
+ | | 2016-03-28 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | 3 wells drilled and appear to be equipped for production. 3 tanks onsite. ID sign and e&s ok. | ||
+ | |- | ||
+ | | 2468851 | ||
+ | | Primary Facility | ||
+ | | 2016-03-28 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | 3 wells drilled and appear to be equipped for production. 3 tanks onsite. ID sign and e&s ok. | ||
+ | |- | ||
+ | | 2518641 | ||
+ | | Primary Facility | ||
+ | | 2016-09-12 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Well tagged-in production. Well head casing-production set equipment-tank battery/containment looked ok. | ||
+ | |- | ||
+ | | 2589323 | ||
+ | | Primary Facility | ||
+ | | 2017-05-02 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues. | ||
+ | |- | ||
+ | | 2706117 | ||
+ | | Primary Facility | ||
+ | | 2018-03-15 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection well equipped for production. Three brine tanks within secondary containment and appears structurally sound. No E&S issues. | ||
+ | |- | ||
+ | | 2841196 | ||
+ | | Primary Facility | ||
+ | | 2019-02-19 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | This well is tagged and temporarily shut in. The well head casing looks good and has a lock out tag out lock with a cable installed on the master production casing valve. The piping, production set equipment, contain,ent dike and tank battery look good. | ||
+ | |||
+ | NOTE: The well tag API well permit number is not legible enough to read and I am requesting that the operator install a more legible tag on this well. See attached photo. | ||
|- | |- | ||
|} | |} | ||
− | == | + | ==== Violations Commited ==== |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Violation ID |
− | !scope="col" | | + | !scope="col" | Violation Date |
− | !scope="col" | | + | !scope="col" | Date Resolved |
− | !scope="col" | | + | !scope="col" | Violation Code |
− | !scope="col" | | + | !scope="col" | Violation Type |
− | !scope="col" | | + | !scope="col" | Violation Comments |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2118993 | ||
+ | | 654625 | ||
+ | | 11/28/2012 | ||
+ | | 2012-11-28 | ||
+ | | 78.56(3) - Impoundment not structurally sound, impermeable, 3rd party protected. | ||
+ | | Administrative | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2195289 |
− | | | + | | 675160 |
− | | | + | | 08/14/2013 |
− | + | | 2013-08-14 | |
− | | | + | | 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production. |
− | | | + | | Administrative |
− | | | + | | 3216c |
|- | |- | ||
|} | |} | ||
− | == | + | ==== Penalties Applied ==== |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Violation ID |
− | !scope="col" | | + | !scope="col" | Penalty ID |
− | !scope="col" | | + | !scope="col" | Penalty Code |
− | !scope="col" | | + | !scope="col" | Penalty Status |
− | !scope="col" | | + | !scope="col" | Penalty Date |
− | !scope="col" | | + | !scope="col" | Enforcement Date |
− | !scope="col" | | + | !scope="col" | Penalty Amount |
− | !scope="col" | | + | !scope="col" | Amount Collected |
− | + | |- | |
+ | | 654625 | ||
+ | | 295110 | ||
+ | | NOV - Notice of Violation | ||
+ | | Comply/Closed | ||
+ | | | ||
+ | | 2013-01-10 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | | ||
|- | |- | ||
− | | | + | | 654625 |
− | | | + | | 305560 |
− | | style="text-align:right;" | | + | | CACP - Consent Assessment of Civil Penalty |
− | | | + | | Comply/Closed |
− | | | + | | 2013-12-10 |
− | | | + | | 2013-12-10 |
− | | | + | | style="text-align: right;" | $4,500.00 |
− | | | + | | style="text-align: right;" | $4,500.00 |
− | | | + | |- |
+ | | 675160 | ||
+ | | 300894 | ||
+ | | NOV - Notice of Violation | ||
+ | | Comply/Closed | ||
+ | | | ||
+ | | 2013-10-11 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | | 675160 | ||
+ | | 309500 | ||
+ | | CACP - Consent Assessment of Civil Penalty | ||
+ | | Comply/Closed | ||
+ | | 2014-04-07 | ||
+ | | 2014-04-07 | ||
+ | | style="text-align: right;" | $2,000.00 | ||
+ | | style="text-align: right;" | $2,000.00 | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Compliance Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Pennsylvania Wells]] |
+ | [[Category:FracFocus]] |
Well ID: 37-129-28725 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.365379,"lon":-79.480605,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Salem Township | |
Operator Name: PENN VIEW EXPLORATION CORP | |
Well Pad ID: 148378 | |
Farm/Lease Name: FRYE UNIT 13H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-01-11 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.365379 | |
Longitude: -79.480605 |
Date | Event |
---|---|
2012-01-11 | New Permit Application |
2012-01-19 | Performed Spud Operation |
2012-05-18 | Drilling Completion |
2012-11-25 | Perforation |
2014-03-24 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-11-14 | 2012-11-14 | 6,808 | 5,539,606 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | EC6486A | Nalco | Scale Inhibitor | Ethylene glycol | 107-21-1 | 30.00 | 0.00710000 | |
Biocide EC 6116A | Nalco | Biocide | Dibromoacetonitrile | 3252-43-5 | 5.00 | 0.00117000 | ||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.00 | 0.00702000 | |||||
Polyethylene glycol | 25322-68-3 | 60.00 | 0.01 | |||||
EC6673W | Nalco | Iron Control | Ethylene glycol | 107-21-1 | 30.00 | 0.00688000 | ||
7.5 Hcl Acid | Used to open perfs | Hydrochloric acid | 7647-01-0 | 7.50 | 0.27 | |||
Proppant (lbs) | Proppant | 9.54 | 10.64 | |||||
WG-36 GELLING AGENT | Halliburton Energy Services | Water Viscosifier | Guar gum | 9000-30-0 | 100.00 | 0.00234000 | ||
ASP 900 | Nalco | Friction Reducer | Ammonium sulfate | 7783-20-2 | 30.00 | |||
Clean Volume (gals) | Carrier/Base Fluid | 90.46 | 100.00 | |||||
GBW-30 BREAKER | Halliburton Energy Services | Gel Breaker | Carbohydrates | 95.00 | 0.00058000 | |||
Hemicellulase enzyme | 9012-54-8 | 15.00 | 0.00009000 | |||||
FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.03 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 602,865.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 578,059.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 398,132.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 293,275.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 238,509.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 104,567.00 | 212 | 0.00 | 0 | 0.00 | 0 |
2019 | PENN VIEW EXPLORATION CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | Drill Cuttings | 3.41 Tons | LANDFILL | 100434 |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 3,173.30 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 72.42 Tons | LANDFILL | 073 114 654 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 4,544.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 7,494.90 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 170.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 556.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 36,132.20 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 6.47 Tons | STORAGE PENDING DISPOSAL OR REUSE | MID074259565 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,578.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 834.99 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 260.35 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 353.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,540.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 110.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 36.67 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 208.33 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 112.33 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 36.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | PENN VIEW EXPLORATION CORP | Waste comment only | 0.00 | ||
2019 | PENN VIEW EXPLORATION CORP | Waste comment only | 0.00 | NO VALUE REPORTED |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2036198 | Primary Facility | 2012-01-23 | Routine/Complete Inspection | No Violations Noted | Well had been spudded, drilling was not ongoing at the time of the inspection. Well pad construction ahd been completed, well stimulation impoundment construction was still underway. All access road and site erosion controls had been implemented as outlined in the ESCGP. There was no evidence of accelerated erosion or sedimentation in relation to the access road or well-site. The operator should monitor the site and access road eorsion controls and maintain them as neccesary. |
2039240 | Primary Facility | 2012-01-31 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained. Inspection conducted w/OGI J. Branan. |
2045690 | Primary Facility | 2012-02-22 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained. |
2048769 | Primary Facility | 2012-03-06 | Drilling/Alteration | No Violations Noted | Highlands Rig#2 Speedstar cleaning hole (damp) at 1424' at time of inspection. Pit lined and freeboard maintained. |
2056001 | Primary Facility | 2012-03-30 | Routine/Complete Inspection | No Violations Noted | Well topholed and ready for Patterson rig; On pad with Fry 14h and 15H; Location good; E&S good |
2066497 | Primary Facility | 2012-05-10 | Drilling/Alteration | No Violations Noted | Patterson-UTI Rig#255 nippling up BOP at time of inspection. Closed loop system being utilized. Pit lined and freeboard maintained. |
2069689 | Primary Facility | 2012-05-21 | Routine/Complete Inspection | No Violations Noted | TD of hole: 11360; Ran 11320' 5 !/2"csg; Cement w/67bbls; 285 sks Varicem cement; 14.2ppg;Yield=1.32ft3/sk; 5.84 galsk; followed by Gasstop 208 bbls; 885sks; 14.2;1.32yield; 5.85ft3/sk; Tail in with Fraccem; 110bbls; 280 sks; 15.2ppg; 2.2Yield; 9.13ft3/sk;'; cement returns; Patterson rig 255 moving off location; |
2116918 | Primary Facility | 2012-11-20 | Routine/Complete Inspection | No Violations Noted | Site stable no violations |
2118993 | Primary Facility | 2012-11-28 | Incident- Response to Accident or Event | Violation(s) Noted | Violations noted |
2129637 | Primary Facility | 2013-01-10 | Compliance Evaluation | No Violations Noted | Compliance inspection the result of violations written on 11/29/2012. At the time of inspection the soil and rock affected by the brine spill on 11/28 appears to have been removed. At the time of inspection the well appears to be drilled and is actively being equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. |
2180092 | Primary Facility | 2013-07-02 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appears to be drilled and is actively being equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. |
2195289 | Primary Facility | 2013-08-14 | Administrative/File Review | Viol(s) Noted & Immediately Corrected | Administrative review the result of a restoration extension request submitted to the Department on June 5 2013. During the restoration review process the Department notes that the Operator was approximately 4 months past the restoration date, when the restoration extension was filed with the Department. According to the well record submitted to the Department by the Operator the well was drilled to total depth on 5/18/2012 making the restoration date 2/18/2013, the subsequent violation is for the failure to restore the site within 9 months or file for a site restoration extension within the same time frame. |
2251079 | Primary Facility | 2014-03-06 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. The Department notes that the site has been regraded, and mulched, however no growth observed. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events. |
2278646 | Primary Facility | 2014-06-16 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. The Department notes that the site has been regraded, and mulched, with good growth. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events. |
2366785 | Primary Facility | 2015-04-28 | Routine/Complete Inspection | No Violations Noted | Well operating and properly identified. |
2367099 | Primary Facility | 2015-05-05 | Site Restoration | No Violations Noted | Site inspection in response to a "Well Site Restoration Report" filed with the Department on 11/26/2014. At the time of inspection the well was drilled and equipped for production. Well apparatus and brine tank appeared to be in sound condition. All earth disturbance activities associated with the site appear to be complete, stabilized and have sufficient growth. PCSM BMPs are installed and appear to be functioning properly. |
2468850 | Primary Facility | 2016-03-28 | Routine/Complete Inspection | No Violations Noted | 3 wells drilled and appear to be equipped for production. 3 tanks onsite. ID sign and e&s ok. |
2468851 | Primary Facility | 2016-03-28 | Routine/Complete Inspection | No Violations Noted | 3 wells drilled and appear to be equipped for production. 3 tanks onsite. ID sign and e&s ok. |
2518641 | Primary Facility | 2016-09-12 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set equipment-tank battery/containment looked ok. |
2589323 | Primary Facility | 2017-05-02 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues. |
2706117 | Primary Facility | 2018-03-15 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Three brine tanks within secondary containment and appears structurally sound. No E&S issues. |
2841196 | Primary Facility | 2019-02-19 | Routine/Complete Inspection | No Violations Noted | This well is tagged and temporarily shut in. The well head casing looks good and has a lock out tag out lock with a cable installed on the master production casing valve. The piping, production set equipment, contain,ent dike and tank battery look good.
NOTE: The well tag API well permit number is not legible enough to read and I am requesting that the operator install a more legible tag on this well. See attached photo. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2118993 | 654625 | 11/28/2012 | 2012-11-28 | 78.56(3) - Impoundment not structurally sound, impermeable, 3rd party protected. | Administrative | |
2195289 | 675160 | 08/14/2013 | 2013-08-14 | 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production. | Administrative | 3216c |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
654625 | 295110 | NOV - Notice of Violation | Comply/Closed | 2013-01-10 | |||
654625 | 305560 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2013-12-10 | 2013-12-10 | $4,500.00 | $4,500.00 |
675160 | 300894 | NOV - Notice of Violation | Comply/Closed | 2013-10-11 | |||
675160 | 309500 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2014-04-07 | 2014-04-07 | $2,000.00 | $2,000.00 |
For data sources see[8]