If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-131-20215 | | Well ID: 37-131-20215 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.597499, -76.038123 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: MANNING UNIT REIMILLER 1 MANNING 1H | | Farm/Lease Name: MANNING UNIT REIMILLER 1 MANNING 1H | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: 2012-02 | + | | Spud Date: 2012-12-02 |
|- | |- | ||
| Permit Date: 2011-09-16 | | Permit Date: 2011-09-16 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
|- | |- | ||
| Configuration: Horizontal Well | | Configuration: Horizontal Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 41.597499 | | Latitude: 41.597499 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2011-09-16 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2012-02-27 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2012-12-23 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2013-05-27 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2013-06-19 | ||
+ | | Performed Stimulation | ||
+ | |- | ||
+ | | 2014-01-30 | ||
+ | | DEVIATED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
== Fracking Activities == | == Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 62: | Line 95: | ||
| 2013-06-19 | | 2013-06-19 | ||
| 2013-07-19 | | 2013-07-19 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 7,488 |
− | | style="text-align: right;" | 8,270,680 | + | | style="text-align: right;" | 8,270,680 |
| style="text-align: right;" | | | style="text-align: right;" | | ||
|- | |- | ||
Line 192: | Line 225: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-06-19 }}</ref> | | accessdate = 2019-06-19 }}</ref> | ||
+ | == Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | | 2013-06-19 | ||
+ | | style="text-align: right;" | | ||
+ | |||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Completion Reports - Stimulations | ||
+ | | publisher = Pennsylvania Department of Conservation and Natural Resources | ||
+ | | date = 2020-03-02 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-03-02 }}</ref> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 277: | Line 333: | ||
| 2019 | | 2019 | ||
| [[BKV OPR LLC]] | | [[BKV OPR LLC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 928,433.48 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 348 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 302: | Line 358: | ||
| 2012 | | 2012 | ||
| [[CITRUS ENERGY CORP]] | | [[CITRUS ENERGY CORP]] | ||
− | | Drill Cuttings | + | | Drill Cuttings |
| style="text-align: right;" | 1,173.00 Tons | | style="text-align: right;" | 1,173.00 Tons | ||
| LANDFILL | | LANDFILL | ||
Line 309: | Line 365: | ||
| 2013 | | 2013 | ||
| [[CITRUS ENERGY CORP]] | | [[CITRUS ENERGY CORP]] | ||
− | + | | Fracing Fluid Waste | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | Fracing Fluid Waste | ||
| style="text-align: right;" | 2,289.00 Bbl | | style="text-align: right;" | 2,289.00 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | | + | | 2013 |
| [[CITRUS ENERGY CORP]] | | [[CITRUS ENERGY CORP]] | ||
− | | | + | | Drill Cuttings |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 477.00 Tons |
− | | | + | | LANDFILL |
− | | | + | | THR029 |
|- | |- | ||
| 2014 | | 2014 | ||
| [[WARREN E & P INC]] | | [[WARREN E & P INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 290.52 Bbl | | style="text-align: right;" | 290.52 Bbl | ||
| STORAGE PENDING DISPOSAL OR REUSE | | STORAGE PENDING DISPOSAL OR REUSE | ||
Line 337: | Line 386: | ||
| 2014 | | 2014 | ||
| [[WARREN E & P INC]] | | [[WARREN E & P INC]] | ||
− | | Fracturing Fluid Waste | + | | Fracturing Fluid Waste |
| style="text-align: right;" | 7.80 Tons | | style="text-align: right;" | 7.80 Tons | ||
| LANDFILL | | LANDFILL | ||
| THR029 | | THR029 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[CITRUS ENERGY CORP]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,533.00 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
|- | |- | ||
| 2014 | | 2014 | ||
| [[WARREN E & P INC]] | | [[WARREN E & P INC]] | ||
− | | Drill Cuttings | + | | Drill Cuttings |
| style="text-align: right;" | 9.20 Tons | | style="text-align: right;" | 9.20 Tons | ||
| LANDFILL | | LANDFILL | ||
Line 351: | Line 407: | ||
| 2015 | | 2015 | ||
| [[WARREN E & P INC]] | | [[WARREN E & P INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 365.51 Bbl | | style="text-align: right;" | 365.51 Bbl | ||
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
Line 358: | Line 414: | ||
| 2015 | | 2015 | ||
| [[WARREN E & P INC]] | | [[WARREN E & P INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 476.30 Bbl | | style="text-align: right;" | 476.30 Bbl | ||
| STORAGE PENDING DISPOSAL OR REUSE | | STORAGE PENDING DISPOSAL OR REUSE | ||
Line 365: | Line 421: | ||
| 2016 | | 2016 | ||
| [[WARREN E & P INC]] | | [[WARREN E & P INC]] | ||
− | | Other Oil & Gas Wastes | + | | Other Oil & Gas Wastes |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 21.48 Bbl |
− | | | + | | RESIDUAL WASTE PROCESSING FACILITY |
− | | | + | | WMGR123NC018 |
|- | |- | ||
| 2016 | | 2016 | ||
| [[WARREN E & P INC]] | | [[WARREN E & P INC]] | ||
− | | Other Oil & Gas Wastes | + | | Other Oil & Gas Wastes |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 104.58 Bbl |
− | | | + | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) |
− | | | + | | WMGR123NC018 |
|- | |- | ||
| 2016 | | 2016 | ||
| [[WARREN E & P INC]] | | [[WARREN E & P INC]] | ||
− | | | + | | Synthetic Liner Materials |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.50 Tons |
− | | | + | | LANDFILL |
− | | | + | | THR029 |
|- | |- | ||
| 2016 | | 2016 | ||
| [[WARREN E & P INC]] | | [[WARREN E & P INC]] | ||
− | | Other Oil & Gas Wastes | + | | Other Oil & Gas Wastes |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 33.77 Bbl |
− | | | + | | STORAGE PENDING DISPOSAL OR REUSE |
− | | | + | | |
|- | |- | ||
| 2016 | | 2016 | ||
| [[WARREN E & P INC]] | | [[WARREN E & P INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 213.71 Bbl | | style="text-align: right;" | 213.71 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
Line 400: | Line 456: | ||
| 2016 | | 2016 | ||
| [[WARREN E & P INC]] | | [[WARREN E & P INC]] | ||
− | + | | Produced Fluid | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | Produced Fluid | ||
| style="text-align: right;" | 229.14 Bbl | | style="text-align: right;" | 229.14 Bbl | ||
| STORAGE PENDING DISPOSAL OR REUSE | | STORAGE PENDING DISPOSAL OR REUSE | ||
Line 414: | Line 463: | ||
| 2016 | | 2016 | ||
| [[WARREN E & P INC]] | | [[WARREN E & P INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 230.79 Bbl | | style="text-align: right;" | 230.79 Bbl | ||
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
| WMGR123NC018 | | WMGR123NC018 | ||
|- | |- | ||
− | | | + | | 2016 |
| [[WARREN E & P INC]] | | [[WARREN E & P INC]] | ||
− | | | + | | Other Oil & Gas Wastes |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1.10 Tons |
− | | | + | | LANDFILL |
− | | | + | | THR029 |
|- | |- | ||
| 2017 | | 2017 | ||
| [[WARREN E & P INC]] | | [[WARREN E & P INC]] | ||
− | | Other Oil & Gas Wastes | + | | Other Oil & Gas Wastes |
| style="text-align: right;" | 62.50 Bbl | | style="text-align: right;" | 62.50 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
Line 435: | Line 484: | ||
| 2017 | | 2017 | ||
| [[WARREN E & P INC]] | | [[WARREN E & P INC]] | ||
− | | Other Oil & Gas Wastes | + | | Other Oil & Gas Wastes |
| style="text-align: right;" | 11.67 Bbl | | style="text-align: right;" | 11.67 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
Line 442: | Line 491: | ||
| 2017 | | 2017 | ||
| [[WARREN E & P INC]] | | [[WARREN E & P INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 529.39 Bbl | | style="text-align: right;" | 529.39 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
Line 449: | Line 498: | ||
| 2017 | | 2017 | ||
| [[WARREN E & P INC]] | | [[WARREN E & P INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 36.67 Bbl | | style="text-align: right;" | 36.67 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR119 | | WMGR119 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[WARREN E & P INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 283.66 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
|- | |- | ||
| 2018 | | 2018 | ||
| [[BKV OPR LLC]] | | [[BKV OPR LLC]] | ||
− | | Produced Fluid ( | + | | Synthetic Liner Materials |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1.31 Tons |
+ | | LANDFILL | ||
+ | | 101247 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[WARREN E & P INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 149.07 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[WARREN E & P INC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 44.16 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
− | | | + | | WMGR123NC018 |
|- | |- | ||
| 2018 | | 2018 | ||
| [[BKV OPR LLC]] | | [[BKV OPR LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 20.00 Bbl | | style="text-align: right;" | 20.00 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
Line 470: | Line 540: | ||
| 2018 | | 2018 | ||
| [[WARREN E & P INC]] | | [[WARREN E & P INC]] | ||
− | | | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 985.46 Bbl |
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123NC018 | | WMGR123NC018 | ||
Line 477: | Line 547: | ||
| 2018 | | 2018 | ||
| [[BKV OPR LLC]] | | [[BKV OPR LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 70.00 Bbl |
− | | | + | | RESIDUAL WASTE PROCESSING FACILITY |
− | | | + | | WMGR123NE003 |
|- | |- | ||
− | | | + | | 2019 |
| [[BKV OPR LLC]] | | [[BKV OPR LLC]] | ||
− | | | + | | Waste Water Treatment Sludge |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2.76 Tons |
− | | RESIDUAL WASTE | + | | RESIDUAL WASTE TRANSFER FACILITY |
− | | | + | | 101714 |
|- | |- | ||
− | | | + | | 2019 |
| [[BKV OPR LLC]] | | [[BKV OPR LLC]] | ||
− | | Synthetic Liner Materials | + | | Synthetic Liner Materials |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 11.17 Tons |
− | | | + | | RESIDUAL WASTE TRANSFER FACILITY |
− | | | + | | 101714 |
|- | |- | ||
| 2019 | | 2019 | ||
| [[BKV OPR LLC]] | | [[BKV OPR LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,626.15 Bbl |
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123NC018 | | WMGR123NC018 | ||
Line 505: | Line 575: | ||
| 2019 | | 2019 | ||
| [[BKV OPR LLC]] | | [[BKV OPR LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 36.67 Bbl | | style="text-align: right;" | 36.67 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
Line 512: | Line 582: | ||
| 2019 | | 2019 | ||
| [[BKV OPR LLC]] | | [[BKV OPR LLC]] | ||
− | | Produced Fluid | + | | Synthetic Liner Materials |
+ | | style="text-align: right;" | 0.34 Tons | ||
+ | | LANDFILL | ||
+ | | 100933 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[BKV OPR LLC]] | ||
+ | | Produced Fluid | ||
| style="text-align: right;" | 71.67 Bbl | | style="text-align: right;" | 71.67 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY |
Well ID: 37-131-20215 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.597499,"lon":-76.038123,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Meshoppen Township | |
Operator Name: BKV OPR LLC | |
Well Pad ID: 149172 | |
Farm/Lease Name: MANNING UNIT REIMILLER 1 MANNING 1H | |
License Status: | |
Spud Date: 2012-12-02 | |
Permit Date: 2011-09-16 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.597499 | |
Longitude: -76.038123 |
Date | Event |
---|---|
2011-09-16 | New Permit Application |
2012-02-27 | Performed Spud Operation |
2012-12-23 | Drilling Completion |
2013-05-27 | Perforation |
2013-06-19 | Performed Stimulation |
2014-01-30 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-06-19 | 2013-07-19 | 7,488 | 8,270,680 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HCL | FTS | Acid | Hydrochloric acid | 7647-01-0 | 37 | 0.339401 | 0 |
ICI-3240 | FTS | Bacteriacide | Dazomet | 533-74-4 | 24 | 0.009949 | 0 | |
Sodium Hydroxide | 1310-73-2 | 4 | 0.001658 | 0 | ||||
CS 500SI | FTS | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 10 | 0.001666 | 0 | |
Water | FTS | carrier | H2O | 7732-18-5 | 100 | 86.212 | 0 | |
ShaleSurf 1000 | FTS | Surfactant | 2-Propanol | 67-63-0 | 10 | 0.008288 | 0 | |
Ethoxylated alcohol | Proprietary | 20 | 0.016576 | 0 | ||||
2-Butoxyethanol | 111-76-2 | 10 | 0.008288 | 0 | ||||
Cyclohexene | 5989-27-5 | 10 | 0.008288 | 0 | ||||
Methanol | 67-56-1 | 10 | 0.008288 | 0 | ||||
FRW-600 | FTS | Friction Reducer | Ammonium acetate | 631-61-8 | 6 | 0.002118 | 0 | |
Hydrotreated Light Distillate | 64742-47-8 | 30 | 0.010592 | 0 | ||||
Sand | FTS | Proppant | Silica | 14808-60-7 | 99.9 | 13.597 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-06-19 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CITRUS ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CITRUS ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CITRUS ENERGY CORP | 934,928.00 | 73 | 0.00 | 0 | 0.00 | 0 |
2014 | WARREN E & P INC | 2,806,740.86 | 360 | 0.00 | 0 | 0.00 | 0 |
2015 | WARREN E & P INC | 1,654,348.53 | 339 | 0.00 | 0 | 0.00 | 0 |
2016 | WARREN E & P INC | 1,166,623.73 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | WARREN E & P INC | 1,239,243.77 | 363 | 0.00 | 0 | 0.00 | 0 |
2018 | BKV OPR LLC | 1,076,790.26 | 363 | 0.00 | 0 | 0.00 | 0 |
2019 | BKV OPR LLC | 928,433.48 | 348 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CITRUS ENERGY CORP | Drill Cuttings | 1,173.00 Tons | LANDFILL | THR029 |
2013 | CITRUS ENERGY CORP | Fracing Fluid Waste | 2,289.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CITRUS ENERGY CORP | Drill Cuttings | 477.00 Tons | LANDFILL | THR029 |
2014 | WARREN E & P INC | Produced Fluid | 290.52 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2014 | WARREN E & P INC | Fracturing Fluid Waste | 7.80 Tons | LANDFILL | THR029 |
2014 | CITRUS ENERGY CORP | Produced Fluid | 1,533.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | WARREN E & P INC | Drill Cuttings | 9.20 Tons | LANDFILL | THR029 |
2015 | WARREN E & P INC | Produced Fluid | 365.51 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | WARREN E & P INC | Produced Fluid | 476.30 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 21.48 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 104.58 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | WARREN E & P INC | Synthetic Liner Materials | 0.50 Tons | LANDFILL | THR029 |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 33.77 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | WARREN E & P INC | Produced Fluid | 213.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | WARREN E & P INC | Produced Fluid | 229.14 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | WARREN E & P INC | Produced Fluid | 230.79 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 1.10 Tons | LANDFILL | THR029 |
2017 | WARREN E & P INC | Other Oil & Gas Wastes | 62.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | WARREN E & P INC | Other Oil & Gas Wastes | 11.67 Bbl | REUSE (AT WELL PAD) | |
2017 | WARREN E & P INC | Produced Fluid | 529.39 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | WARREN E & P INC | Produced Fluid | 36.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2017 | WARREN E & P INC | Produced Fluid | 283.66 Bbl | REUSE (AT WELL PAD) | |
2018 | BKV OPR LLC | Synthetic Liner Materials | 1.31 Tons | LANDFILL | 101247 |
2018 | WARREN E & P INC | Produced Fluid | 149.07 Bbl | REUSE (AT WELL PAD) | |
2018 | WARREN E & P INC | Other Oil & Gas Wastes | 44.16 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | BKV OPR LLC | Produced Fluid | 20.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2018 | WARREN E & P INC | Produced Fluid | 985.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | BKV OPR LLC | Produced Fluid | 70.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2019 | BKV OPR LLC | Waste Water Treatment Sludge | 2.76 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101714 |
2019 | BKV OPR LLC | Synthetic Liner Materials | 11.17 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101714 |
2019 | BKV OPR LLC | Produced Fluid | 1,626.15 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | BKV OPR LLC | Produced Fluid | 36.67 Bbl | REUSE (AT WELL PAD) | |
2019 | BKV OPR LLC | Synthetic Liner Materials | 0.34 Tons | LANDFILL | 100933 |
2019 | BKV OPR LLC | Produced Fluid | 71.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2112200 | Primary Facility | 2012-10-24 | Routine/Complete Inspection | Pending | 20" cond has been set. No well tag. |
2121529 | Primary Facility | 2012-12-04 | Drilling/Alteration | No Violations Noted | Patterson 252, Comp. Man - Dale Barnett, @ 800' |
2123720 | Primary Facility | 2012-12-14 | Drilling/Alteration | No Violations Noted | Patterson 252, Comp. Man - Jacob Oettel, drilling @ 6526' |
2140048 | Primary Facility | 2013-02-13 | Routine/Complete Inspection | No Violations Noted | Well needs more permanent well tag. |
2332074 | Primary Facility | 2014-12-29 | Incident- Response to Accident or Event | No Violations Noted | Arrived at the site at 14:15 in response to an estimated (3.5) gallon spill of production fluid. Heather Burkhart and Kayla Saxon of Warren E&P accompanied me during the inspection. While at the site, Ms. Saxon explained that the spill occurred in the morning hours of 12/19/14 as a vacuum truck was in the process of backing up in preparation to offload production fluid from a frac tank in the tank battery. The truck driver noticed fluid spraying on the pad surface as he was backing up. The spill occurred as a result of a valve failing due to mechanical malfunction from the the scrubber to the muffler line on the truck. Residuals from the truck hose leaked onto the pad surface. The dimesions of the impacted area of the pad surface are (8.5-9.5) in length and (5) feet in width according to Ms. Saxon. Ms. Burkhart and Ms. Saxon informed me that the spill had been cleaned up and backfilled with fresh rock the day it occurred. There is no visual evidence of an impact to the pad surface where the release occurred. |
2332077 | Primary Facility | 2014-12-29 | Incident- Response to Accident or Event | No Violations Noted | Arrived at the site at 14:15 in response to an estimated (3.5) gallon spill of production fluid. Heather Burkhart and Kayla Saxon of Warren E&P accompanied me during the inspection. While at the site, Ms. Saxon explained that the spill occurred in the morning hours of 12/19/14 as a vacuum truck was in the process of backing up in preparation to offload production fluid from a frac tank in the tank battery. The truck driver noticed fluid spraying on the pad surface as he was backing up. The spill occurred as a result of a valve failing due to mechanical malfunction from the the scrubber to the muffler line on the truck. Residuals from the truck hose leaked onto the pad surface. The dimesions of the impacted area of the pad surface are (8.5-9.5) in length and (5) feet in width according to Ms. Saxon. Ms. Burkhart and Ms. Saxon informed me that the spill had been cleaned up and backfilled with fresh rock the day it occurred. There is no visual evidence of an impact to the pad surface where the release occurred. |
2430040 | Primary Facility | 2015-11-17 | Routine/Complete Inspection | No Violations Noted | A vacuum truck was in the process of unloading fluid from a frac tank on containment in the tank battery near the pad entrance. The fluid in this tank is either flowback or production fluid from the wells on the pad or a mixture of both. We used an Oakton MultiParameter PCSTester 35, Extech, ExStik2, and a Hanna Soil Test and Electrical Conductivity & Temperature meter to screen the water in the Production Fluid Storage Tanks and Gas Production Unit containment. Conductivity readings were in the range of (400-500) microSiemens/cm³ in water inside the production fluid tanks containment and (200-300) microSiemens/cm³ in water inside the GPU containment. The pH was around 8.4. |
2513481 | Primary Facility | 2016-08-23 | Routine/Complete Inspection | No Violations Noted | |
2605136 | Primary Facility | 2017-05-30 | Routine/Complete Inspection | No Violations Noted | I arrived at the location at 13:00. There was no activity or personnel at the site during the inspection. The weather conditions were cloudy skies with breezy conditions and temperatures in the low 60's. Rain had just ended. The Manning 1H, Reimiller 1H and Reynolds 1H wells are in production. I left the location at 13:45. |
For data sources see[9]