If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-131-20350 | | Well ID: 37-131-20350 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.6332, -75.915694 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: HARVEY UNIT 3H | | Farm/Lease Name: HARVEY UNIT 3H | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: 2013-11- | + | | Spud Date: 2013-11-01 |
|- | |- | ||
| Permit Date: 2013-09-05 | | Permit Date: 2013-09-05 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
|- | |- | ||
| Configuration: Horizontal Well | | Configuration: Horizontal Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 41.6332 | | Latitude: 41.6332 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2013-09-05 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2013-11-02 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2013-11-22 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2014-03-14 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2014-06-08 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-07-04 | ||
+ | | Performed Stimulation | ||
+ | |- | ||
+ | | 2015-02-03 | ||
+ | | DEVIATED | ||
+ | |- | ||
+ | | 2015-04-16 | ||
+ | | NEWLY DRILLED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
== Fracking Activities == | == Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 62: | Line 101: | ||
| 2014-07-04 | | 2014-07-04 | ||
| 2014-07-13 | | 2014-07-13 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 7,764 |
− | | style="text-align: right;" | 9,285,860 | + | | style="text-align: right;" | 9,285,860 |
| style="text-align: right;" | | | style="text-align: right;" | | ||
|- | |- | ||
Line 142: | Line 181: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-06-19 }}</ref> | | accessdate = 2019-06-19 }}</ref> | ||
+ | == Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | | 2014-07-04 | ||
+ | | style="text-align: right;" | | ||
+ | |||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Completion Reports - Stimulations | ||
+ | | publisher = Pennsylvania Department of Conservation and Natural Resources | ||
+ | | date = 2020-03-02 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-03-02 }}</ref> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 209: | Line 271: | ||
| 2019 | | 2019 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 677,501.99 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 346 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 234: | Line 296: | ||
| 2013 | | 2013 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | Drill Cuttings | + | | Drilling Fluid Waste |
+ | | style="text-align: right;" | 2,530.00 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR119 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[CHIEF OIL & GAS LLC]] | ||
+ | | Drill Cuttings | ||
| style="text-align: right;" | 14.79 Tons | | style="text-align: right;" | 14.79 Tons | ||
| LANDFILL | | LANDFILL | ||
| 100933 | | 100933 | ||
|- | |- | ||
− | | | + | | 2014 |
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | Drilling Fluid Waste | + | | Drilling Fluid Waste |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 428.26 Bbl |
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
− | | | + | | WMGR123SW018 |
|- | |- | ||
| 2014 | | 2014 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | Drill Cuttings | + | | Drill Cuttings |
| style="text-align: right;" | 498.64 Tons | | style="text-align: right;" | 498.64 Tons | ||
| LANDFILL | | LANDFILL | ||
Line 255: | Line 324: | ||
| 2014 | | 2014 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | Fracing Fluid Waste | + | | Fracing Fluid Waste |
− | + | | style="text-align: right;" | 3,335.50 Bbl | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | style="text-align: right;" | 3, | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
Line 269: | Line 331: | ||
| 2014 | | 2014 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | | + | | Fracing Fluid Waste |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 340.00 Bbl |
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
− | | | + | | WMGR123 |
|- | |- | ||
| 2014 | | 2014 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | | + | | Produced Fluid |
− | | style="text-align: right;" | 3, | + | | style="text-align: right;" | 3,138.69 Bbl |
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
Line 283: | Line 345: | ||
| 2015 | | 2015 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 1,220.10 Bbl | | style="text-align: right;" | 1,220.10 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
Line 290: | Line 352: | ||
| 2016 | | 2016 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 456.33 Bbl | | style="text-align: right;" | 456.33 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
Line 297: | Line 359: | ||
| 2017 | | 2017 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
+ | | style="text-align: right;" | 20.46 Bbl | ||
+ | | STORAGE PENDING DISPOSAL OR REUSE | ||
+ | | | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[CHIEF OIL & GAS LLC]] | ||
+ | | Produced Fluid | ||
| style="text-align: right;" | 238.92 Bbl | | style="text-align: right;" | 238.92 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
Line 304: | Line 373: | ||
| 2018 | | 2018 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 354.74 Bbl | | style="text-align: right;" | 354.74 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
Line 311: | Line 380: | ||
| 2019 | | 2019 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 125.86 Bbl |
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | |
Well ID: 37-131-20350 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.6332,"lon":-75.915694,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Lemon Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 147310 | |
Farm/Lease Name: HARVEY UNIT 3H | |
License Status: | |
Spud Date: 2013-11-01 | |
Permit Date: 2013-09-05 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.6332 | |
Longitude: -75.915694 |
Date | Event |
---|---|
2013-09-05 | New Permit Application |
2013-11-02 | Performed Spud Operation |
2013-11-22 | Drilling Completion |
2014-03-14 | Drilling Completion |
2014-06-08 | Perforation |
2014-07-04 | Performed Stimulation |
2015-02-03 | DEVIATED |
2015-04-16 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-07-04 | 2014-07-13 | 7,764 | 9,285,860 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | MCB-8614 | MULTI-CHEM | BIOCIDE | GLUTARALDEHYDE | 111-30-8 | 30 | 0.02 | 0 |
ALKYL (C12-16) DIMETHYLBENZXYLAMMONIUM CHLORIDE | 68424-85-1 | 5 | 0.003 | 0 | ||||
Hydrochloric Acid 10-30% | Halliburton | Acid | Hydrochloric Acid | 7647-01-0 | 30 | 0.1 | 0 | |
MCS-2510T | MULTI-CHEM | Scale Inhibitor | ETHYLENE GLYCOL | 107-21-1 | 60 | 0.01 | 0 | |
Water | Provided by Customer | Base Fluid | Fresh Water | 0000-00-0 | 100 | 99.9 | 0 | |
FR-66 | Halliburton | Friction Reducer | Hydrotreated Light Petroleum Distillate | 64742-47-8 | 30 | 0.02 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-07-04 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHIEF OIL & GAS LLC | 685,872.00 | 71 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 2,992,106.25 | 363 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 1,677,360.12 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 889,485.34 | 358 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 843,563.91 | 361 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 677,501.99 | 346 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 2,530.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | CHIEF OIL & GAS LLC | Drill Cuttings | 14.79 Tons | LANDFILL | 100933 |
2014 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 428.26 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW018 |
2014 | CHIEF OIL & GAS LLC | Drill Cuttings | 498.64 Tons | LANDFILL | 100933 |
2014 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 3,335.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 340.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | CHIEF OIL & GAS LLC | Produced Fluid | 3,138.69 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Produced Fluid | 1,220.10 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 456.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 20.46 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 238.92 Bbl | REUSE (AT WELL PAD) | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 354.74 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 125.86 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2221066 | Primary Facility | 2013-11-08 | Drilling/Alteration | No Violations Noted | Northeast rig 11, Comp Man - Ken Silvis Not drilling yet, prob start this afternoon/evening. Continue with work on berms and clearly label all tanks. |
2252317 | Primary Facility | 2014-03-06 | Drilling/Alteration | No Violations Noted | Orion 15, Comp Man - Steve Arrington |
2253623 | Primary Facility | 2014-03-13 | Drilling/Alteration | No Violations Noted | Orion 15, Comp Man - Joe Trevino |
2373135 | Primary Facility | 2015-05-26 | Routine/Partial Inspection | No Violations Noted | |
2380153 | Primary Facility | 2015-04-22 | Routine/Complete Inspection | No Violations Noted | Well in prodcution, gauge reading 1200psi. Cellar filled with water, however no visible bubbling. 6 treaters, 6 tanks on location. |
2597730 | Primary Facility | 2017-05-12 | Routine/Complete Inspection | No Violations Noted | There was no activity at the site during the inspection. I have no comments on the conditions at the site. No violations were noted. |
2597776 | Primary Facility | 2017-05-12 | Routine/Complete Inspection | No Violations Noted | There was no activity occurring at the site during the inspection. I have no comments for the conditions at the site. No violations were notec. |
2751921 | Primary Facility | 2018-07-13 | Routine/Complete Inspection | No Violations Noted | JP Reilly Construction personnel were conducting earth disturbance activity related to the installation of the PCSM. There were no violations noted. If you have any questions, please contact me. |
2830887 | Primary Facility | 2019-01-18 | Routine/Complete Inspection | No Violations Noted | I arrived on site to conduct a routine complete investigation in response to a site restoration extension request received from the Operator. The purpose of this inspection was to ensure the two sediment traps onsite had been converted into infiltration berms and an additional infiltration berm installed along the access road.
After performing an administrative review of the plan and a site inspection, I agree that the aforementioned conditions have been fulfilled. During the inspection, I noticed several of the tops on the annular vent tanks had cracked. Operator, please inspect the area and repair any deficiencies observed. No violations were noted. Please feel free to contact me with any questions. |
For data sources see[9]