If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-073-20434 | | Well ID: 37-073-20434 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.078819, -80.443656 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: PULASKI VERNO SOUTH 4H | | Farm/Lease Name: PULASKI VERNO SOUTH 4H | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
| Permit Date: 2014-03-17 | | Permit Date: 2014-03-17 | ||
+ | |- | ||
+ | | Well Type: COMB. OIL&GAS | ||
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
|- | |- | ||
| Configuration: Horizontal Well | | Configuration: Horizontal Well | ||
+ | |- | ||
+ | | Conservation: Yes | ||
|- | |- | ||
| Latitude: 41.078819 | | Latitude: 41.078819 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2014-03-17 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2014-05-10 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2014-07-24 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2014-07-31 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2015-01-02 | ||
+ | | DEVIATED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
== Fracking Activities == | == Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 62: | Line 92: | ||
| 2014-08-08 | | 2014-08-08 | ||
| 2014-08-19 | | 2014-08-19 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 7,813 |
− | | style="text-align: right;" | 12,640,200 | + | | style="text-align: right;" | 12,640,200 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 198: | Line 228: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-06-19 }}</ref> | | accessdate = 2019-06-19 }}</ref> | ||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 256: | Line 297: | ||
| 2019 | | 2019 | ||
| [[HILCORP ENERGY CO]] | | [[HILCORP ENERGY CO]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 388,990.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 360 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 281: | Line 322: | ||
| 2016 | | 2016 | ||
| [[HILCORP ENERGY CO]] | | [[HILCORP ENERGY CO]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 236.00 Bbl | | style="text-align: right;" | 236.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 288: | Line 329: | ||
| 2016 | | 2016 | ||
| [[HILCORP ENERGY CO]] | | [[HILCORP ENERGY CO]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 2,564.00 Bbl | | style="text-align: right;" | 2,564.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 295: | Line 336: | ||
| 2017 | | 2017 | ||
| [[HILCORP ENERGY CO]] | | [[HILCORP ENERGY CO]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 354.50 Bbl | | style="text-align: right;" | 354.50 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 302: | Line 343: | ||
| 2017 | | 2017 | ||
| [[HILCORP ENERGY CO]] | | [[HILCORP ENERGY CO]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 4,510.00 Bbl | | style="text-align: right;" | 4,510.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 309: | Line 350: | ||
| 2018 | | 2018 | ||
| [[HILCORP ENERGY CO]] | | [[HILCORP ENERGY CO]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 4,521.15 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| 34-099-23158 | | 34-099-23158 | ||
Line 316: | Line 357: | ||
| 2018 | | 2018 | ||
| [[HILCORP ENERGY CO]] | | [[HILCORP ENERGY CO]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 10,665.38 Bbl | | style="text-align: right;" | 10,665.38 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 323: | Line 364: | ||
| 2019 | | 2019 | ||
| [[HILCORP ENERGY CO]] | | [[HILCORP ENERGY CO]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 10,524.27 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| 34-099-23158 | | 34-099-23158 |
Well ID: 37-073-20434 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.078819,"lon":-80.443656,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lawrence | |
Municipality: Pulaski Township | |
Operator Name: HILCORP ENERGY CO | |
Well Pad ID: 150954 | |
Farm/Lease Name: PULASKI VERNO SOUTH 4H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-03-17 | |
Well Type: COMB. OIL&GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 41.078819 | |
Longitude: -80.443656 |
Date | Event |
---|---|
2014-03-17 | New Permit Application |
2014-05-10 | Performed Spud Operation |
2014-07-24 | Drilling Completion |
2014-07-31 | Perforation |
2015-01-02 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-08-08 | 2014-08-19 | 7,813 | 12,640,200 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Hilcorp | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.0464 | 105,483,000.0 |
Hydrochloric Acid (7.5%) | Axiall | Acidizing | Hydrogen Chloride | 7647-01-0 | 7.5 | 0.11047 | 135423 | |
EC6116A | Nalco | Biocide | Dibromoacetonitrile | 3252-43-5 | 5 | 0.0011354 | 1391.86 | |
Polyethylene Glycol | 25322-68-3 | 60 | 0.0136247 | 16702.4 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00681237 | 8351.17 | ||||
Scale Hib A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.003244 | 3976.76 | |
Sand (Proppant) | Sargent | Proppant | Silica | 14808-60-7 | 99.9 | 12.3421 | 15,130,000.0 | |
Unihib G | GeoSafe | Acid Inhibitor | Thiourea | 62-56-6 | 1 | 0.00000481 | 5.898 | |
Formaldehyde | 50-00-0 | 1 | 0.00000481 | 5.898 | ||||
Acetophenone | 98-86-2 | 1 | 0.00000481 | 5.898 | ||||
Short chained glycol ether | 112-34-5 | 60 | 0.000288686 | 353.895 | ||||
Methanol | 67-56-1 | 5 | 0.00002406 | 29.491 | ||||
Ethoxylated alcohol | 68002-97-1 | 35 | 0.0001684 | 206.439 | ||||
Unislick ST50 | CESI | Friction Reducer | Petroleum Distillates, Hydrotreated Light | 64742-47-8 | 30 | 0.0276826 | 33935.6 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | HILCORP ENERGY CO | 591,769.00 | 123 | 0.00 | 0 | 792.00 | 123 |
2015 | HILCORP ENERGY CO | 1,095,598.00 | 361 | 0.00 | 0 | 12.00 | 59 |
2016 | HILCORP ENERGY CO | 797,238.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2017 | HILCORP ENERGY CO | 707,593.00 | 349 | 0.00 | 0 | 0.00 | 0 |
2018 | HILCORP ENERGY CO | 507,970.00 | 359 | 0.00 | 0 | 0.00 | 0 |
2019 | HILCORP ENERGY CO | 388,990.00 | 360 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | HILCORP ENERGY CO | Produced Fluid | 236.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2016 | HILCORP ENERGY CO | Produced Fluid | 2,564.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2017 | HILCORP ENERGY CO | Produced Fluid | 354.50 Bbl | INJECTION DISPOSAL WELL | 34-133-22523 |
2017 | HILCORP ENERGY CO | Produced Fluid | 4,510.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | HILCORP ENERGY CO | Produced Fluid | 4,521.15 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | HILCORP ENERGY CO | Produced Fluid | 10,665.38 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | HILCORP ENERGY CO | Produced Fluid | 10,524.27 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2271469 | Primary Facility | 2014-05-12 | Drilling/Alteration | No Violations Noted | |
2288555 | Primary Facility | 2014-07-22 | Drilling/Alteration | No Violations Noted | |
2293724 | Primary Facility | 2014-08-08 | Drilling/Alteration | No Violations Noted | |
2692776 | Primary Facility | 2018-02-09 | Routine/Partial Inspection | No Violations Noted | One gas separator unit on site shared between 4H & 1H wells. Cellars appear to have been pumped out recently. Empty metal drum labeled oil stick mix sitting on grating over cellar of 1H. |
For data sources see[8]