X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-081-20597"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-081-20597
 
| Well ID: 37-081-20597
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.242325, -76.543728 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.242325, -76.543728 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: RENN UNIT A 2H
 
| Farm/Lease Name: RENN UNIT A 2H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2012-03-12
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2011-06-03
 
| Permit Date: 2011-06-03
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.242325
 
| Latitude: 41.242325
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-06-03
 +
| New Permit Application
 +
|-
 +
| 2012-03-12
 +
| Performed Spud Operation
 +
|-
 +
| 2012-07-02
 +
| Drilling Completion
 +
|-
 +
| 2012-08-06
 +
| Perforation
 +
|-
 +
| 2014-02-20
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 62: Line 92:
 
| 2012-08-14
 
| 2012-08-14
 
| 2012-08-14
 
| 2012-08-14
| style="text-align: right;" | 6808.00
+
| style="text-align: right;" | 6,808
| style="text-align: right;" | 3,798,124.0
+
| style="text-align: right;" | 3,798,124
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
|-
 
|-
Line 238: Line 268:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 323: Line 364:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| style="text-align: right;" | 24,407.20
+
| style="text-align: right;" | 114,792.66
| style="text-align: right;" | 74
+
| style="text-align: right;" | 347
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 348: Line 389:
 
| 2012
 
| 2012
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 557.00 Bbl
+
| style="text-align: right;" | 197.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 +
|-
 +
| 2012
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 465.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR123
+
| WMGR119
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Fracing Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 1,971.00 Bbl
+
| style="text-align: right;" | 51.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| INJECTION DISPOSAL WELL
| WMGR123
+
| 34-133-20114
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Drill Cuttings (in Tons)
+
| Produced Fluid
| style="text-align: right;" | 987.48 Tons
+
| style="text-align: right;" | 557.00 Bbl
| LANDFILL
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 301626
+
| WMGR123
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Fracing Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 322.00 Bbl
+
| style="text-align: right;" | 1,014.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-21076
+
| 34-133-24096
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 64.00 Bbl
 
| style="text-align: right;" | 64.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 383: Line 431:
 
| 2012
 
| 2012
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 465.00 Bbl
+
| style="text-align: right;" | 322.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR119
 
|-
 
| 2012
 
| [[XTO ENERGY INC]]
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 51.00 Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-20114
+
| 34-133-21076
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Fracing Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 1,014.00 Bbl
+
| style="text-align: right;" | 1,971.00 Bbl
| INJECTION DISPOSAL WELL
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 34-133-24096
+
| WMGR123
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Drill Cuttings
| style="text-align: right;" | 197.00 Bbl
+
| style="text-align: right;" | 987.48 Tons
| INJECTION DISPOSAL WELL
+
| LANDFILL
| 34-133-24096
+
| 301626
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 303.00 Bbl
+
| style="text-align: right;" | 452.00 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| INJECTION DISPOSAL WELL
| WMGR123
+
| 34-133-20114
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 1,149.00 Bbl
 
| style="text-align: right;" | 1,149.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 425: Line 466:
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 855.00 Bbl
 
| style="text-align: right;" | 855.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
Line 432: Line 473:
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 303.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123
 +
|-
 +
| 2013
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 103.00 Bbl
 
| style="text-align: right;" | 103.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
Line 439: Line 487:
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 821.00 Bbl
 
| style="text-align: right;" | 821.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 446: Line 494:
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 452.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-20114
 
|-
 
| 2013
 
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels)
 
 
| style="text-align: right;" | 87.00 Bbl
 
| style="text-align: right;" | 87.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 460: Line 501:
 
| 2014
 
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 623.80 Bbl
+
| style="text-align: right;" | 1,698.65 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR123
+
| WMGR119
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 298.43 Bbl
 
| style="text-align: right;" | 298.43 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
Line 474: Line 515:
 
| 2014
 
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 1,698.65 Bbl
+
| style="text-align: right;" | 623.80 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR119
+
| WMGR123
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 110.00 Bbl
 
| style="text-align: right;" | 110.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 488: Line 529:
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 109.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 514.38 Bbl
 
| style="text-align: right;" | 514.38 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
Line 495: Line 543:
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 692.76 Bbl
 
| style="text-align: right;" | 692.76 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC010
 
| WMGR123NC010
|-
 
| 2015
 
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 109.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-21076
 
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 553.47 Bbl
 
| style="text-align: right;" | 553.47 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 516: Line 557:
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 338.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
|-
 
| 2016
 
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
 
| style="text-align: right;" | 206.34 Bbl
 
| style="text-align: right;" | 206.34 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2017
+
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 436.03 Bbl
+
| style="text-align: right;" | 338.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| INJECTION DISPOSAL WELL
| WMGR123
+
| 34-133-24096
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 335.85 Bbl
 
| style="text-align: right;" | 335.85 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 544: Line 578:
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Other Oil & Gas Wastes
| style="text-align: right;" | 114.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
|-
 
| 2017
 
| [[XTO ENERGY INC]]
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
 
| style="text-align: right;" | 106.19 Bbl
 
| style="text-align: right;" | 106.19 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2018
+
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 154.11 Bbl
+
| style="text-align: right;" | 436.03 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2018
+
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 113.00 Bbl
+
| style="text-align: right;" | 114.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
| WMGR123NW005
Line 572: Line 599:
 
| 2018
 
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 97.80 Bbl
 
| style="text-align: right;" | 97.80 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 579: Line 606:
 
| 2018
 
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 78.00 Bbl
 
| style="text-align: right;" | 78.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 586: Line 613:
 
| 2018
 
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 +
| style="text-align: right;" | 80.50 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 252.99 Bbl
 
| style="text-align: right;" | 252.99 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 593: Line 627:
 
| 2018
 
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 80.50 Bbl
+
| style="text-align: right;" | 154.11 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 113.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 320.60 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-24096
+
| 34-133-24189
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 77.00 Bbl
 
| style="text-align: right;" | 77.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 607: Line 655:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 8.00 Bbl
+
| style="text-align: right;" | 78.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 59.50 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 84.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-24189
+
| 34-133-20114
 
|-
 
|-
 
|}
 
|}

Latest revision as of 00:20, 17 May 2020

Well Details

Well ID: 37-081-20597
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Jordan Township
Operator Name: XTO ENERGY INC
Well Pad ID: 149174
Farm/Lease Name: RENN UNIT A 2H
License Status:
Spud Date:
Permit Date: 2011-06-03
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.242325
Longitude: -76.543728

For data sources see[1][2][3]

Well History

Date Event
2011-06-03 New Permit Application
2012-03-12 Performed Spud Operation
2012-07-02 Drilling Completion
2012-08-06 Perforation
2014-02-20 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-08-14 2012-08-14 6,808 3,798,124

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Water 7732-18-5 100.00 87.28
Biocide - MC 8650 Multi-Chem Group Biocide Glutaraldehyde 111-30-8 60.00 0.00450000
Whole Product
Other -(non hazardous) 40.00 0.00300000
Sand Proppant Quartz 14808-60-7 100.00 12.16
Acid Corrosion Inhibitor - EcoAcid CI Geosafe Chemicals Corrosion Inhibitor Other -(non hazardous) 50.00 0.00019000
Whole Product
Diethylene glycol monobutyl ether 112-34-5 50.00 0.00019000
Biocide - MC 8520 Multi-Chem Group Biocide Whole Product
3,4,4-Trimethyloxazolidine 75673-43-7 4.50 0.00062000
4,4-Dimethyloxazolidine 51200-87-4 95.00 0.01
2-Amino-2-methylpropan-1-ol 124-68-5 0.50 0.00007000
Acid - 7.5 HCl Acid PPG Industries Acid Hydrochloric acid 7647-01-0 7.50 0.03
Whole Product
Other -(non hazardous) 92.50 0.42
Friction Reducer - MC MX-14-5 Multi-Chem Group Friction Reducer Other -(non hazardous) 70.00 0.03
Whole Product
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
Scale Inhibitor - MC-MX-588-2 Multi-Chem Group Scale Inhibitor Other -(non hazardous) 100.00 0.02
Whole Product

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2012 XTO ENERGY INC 58,073.00 98 0.00 0 0.00 0
2013 XTO ENERGY INC 232,829.00 364 0.00 0 0.00 0
2014 XTO ENERGY INC 199,647.00 364 0.00 0 0.00 0
2015 XTO ENERGY INC 152,874.00 324 0.00 0 0.00 0
2016 XTO ENERGY INC 140,907.00 333 0.00 0 0.00 0
2017 XTO ENERGY INC 130,214.00 337 0.00 0 0.00 0
2018 XTO ENERGY INC 125,295.74 347 0.00 0 0.00 0
2019 XTO ENERGY INC 114,792.66 347 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 XTO ENERGY INC Produced Fluid 197.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2012 XTO ENERGY INC Produced Fluid 465.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 XTO ENERGY INC Fracing Fluid Waste 51.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2012 XTO ENERGY INC Produced Fluid 557.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012 XTO ENERGY INC Fracing Fluid Waste 1,014.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2012 XTO ENERGY INC Produced Fluid 64.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2012 XTO ENERGY INC Fracing Fluid Waste 322.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2012 XTO ENERGY INC Fracing Fluid Waste 1,971.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012 XTO ENERGY INC Drill Cuttings 987.48 Tons LANDFILL 301626
2013 XTO ENERGY INC Produced Fluid 452.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2013 XTO ENERGY INC Produced Fluid 1,149.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2013 XTO ENERGY INC Produced Fluid 855.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013 XTO ENERGY INC Produced Fluid 303.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013 XTO ENERGY INC Produced Fluid 103.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2013 XTO ENERGY INC Produced Fluid 821.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2013 XTO ENERGY INC Produced Fluid 87.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 XTO ENERGY INC Produced Fluid 1,698.65 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 XTO ENERGY INC Produced Fluid 298.43 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014 XTO ENERGY INC Produced Fluid 623.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 XTO ENERGY INC Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 109.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Produced Fluid 514.38 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 XTO ENERGY INC Produced Fluid 692.76 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 XTO ENERGY INC Produced Fluid 553.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 XTO ENERGY INC Produced Fluid 206.34 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 XTO ENERGY INC Produced Fluid 338.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 335.85 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 XTO ENERGY INC Other Oil & Gas Wastes 106.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 XTO ENERGY INC Produced Fluid 436.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 XTO ENERGY INC Produced Fluid 114.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 XTO ENERGY INC Produced Fluid 97.80 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Produced Fluid 78.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2018 XTO ENERGY INC Produced Fluid 80.50 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 252.99 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 XTO ENERGY INC Produced Fluid 154.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 XTO ENERGY INC Produced Fluid 113.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 XTO ENERGY INC Produced Fluid 320.60 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 77.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 78.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 59.50 Bbl REUSE (AT WELL PAD)
2019 XTO ENERGY INC Produced Fluid 84.00 Bbl INJECTION DISPOSAL WELL 34-133-20114

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2054833 Primary Facility 2012-03-29 Routine/Complete Inspection No Violations Noted
2072017 Primary Facility 2012-05-31 Drilling/Alteration No Violations Noted
2072443 Primary Facility 2012-05-30 Routine/Complete Inspection No Violations Noted
2081366 Primary Facility 2012-07-05 Routine/Complete Inspection No Violations Noted
2084207 Primary Facility 2012-07-18 Drilling/Alteration No Violations Noted
2089909 Primary Facility 2012-08-07 Drilling/Alteration No Violations Noted
2090176 Primary Facility 2012-08-07 Routine/Complete Inspection No Violations Noted
2090277 Primary Facility 2012-08-07 Drilling/Alteration No Violations Noted
2090389 Primary Facility 2012-08-09 Drilling/Alteration No Violations Noted
2091666 Primary Facility 2012-08-13 Drilling/Alteration Violation(s) Noted
2094006 Primary Facility 2012-08-22 Drilling/Alteration Outstanding Violations - No Viols Req'd
2098791 Primary Facility 2012-09-05 Routine/Complete Inspection No Violations Noted
2123264 Primary Facility 2012-12-07 Routine/Complete Inspection No Violations Noted
2124767 Primary Facility 2012-12-18 Routine/Complete Inspection No Violations Noted
2149283 Primary Facility 2013-03-19 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2289042 Primary Facility 2014-07-14 Routine/Complete Inspection No Violations Noted he PCSM plan indicates stormwater rate/volume reduction based on infiltration into the pad (via pore space in the rock), infiltration into the swales and infiltration into the infiltration basin. Puddles were noted on the pad (indicating pore space was not maintained), sediment was noted in the nearly full infiltration basin, and an erosion channel has formed in the swale on the south side of the access road. In addition, the east side cut-slope has not achieved 70% vegetative cover. This site does not meet the PCSM criteria outlined in the approved plans and requires corrective action. Please correct the erosion channel on the south side of the well pad ASAP.
2302938 Primary Facility 2014-08-22 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2537443 Primary Facility 2016-11-14 Routine/Complete Inspection No Violations Noted Well Site Restoration Inspection; 11/14/2016.

The well pad surface is designed to remain at its current (originally constructed) size and the PCSM plan has been implemented according to the design. The site currently lacks adequate vegetative cover to be considered permanently stabilized. I recommend the Well Site Restoration Report for this site be denied. No Violations Noted.

2616488 Primary Facility 2017-07-14 Site Restoration No Violations Noted Well Site Restoration/Notice of Termination Inspection. The site is permanently stabilized and PCSM plans have been implemented. The well pad surface remains as constructed but justification for the production size has been provided. I recommend approving the Well Site Restoration Report and Notice of Termination. No violations noted.
2801381 Primary Facility 2018-11-09 Routine/Complete Inspection No Violations Noted Two wells staged for production phase. Two each sand and water separators. No leaks detected from production equipment. No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2091666 646681 08/13/2012 2012-08-13 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative Gas foud with the presence of methane 20x 13 3/8 and 13 3/8 x 9 5/8 and 9 5/8 x 5 1/2
2091666 646682 08/13/2012 2012-08-13 78.83GRNDWTR - Improper casing to protect fresh groundwater Administrative gas found with the presence of methane outside the 13 3/8 surface casing

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
646681 287592 NOV - Notice of Violation
646682 287592 NOV - Notice of Violation

For data sources see[8]

References