X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-081-20681"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-081-20681
 
| Well ID: 37-081-20681
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.369531, -77.168622 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.369531, -77.168622 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: CADWALADER UNIT 5H
 
| Farm/Lease Name: CADWALADER UNIT 5H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 01/03/2012
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 8/18/2011
+
| Permit Date: 2011-08-18
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.369531
 
| Latitude: 41.369531
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
== Production Data ==
+
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Period
+
!scope="col" | Date
!scope="col" | Operator Name
+
!scope="col" | Event
!scope="col" | Gas Quantity (mcf)
 
!scope="col" | Gas Production Days
 
!scope="col" | Oil Quantity (bbl)
 
!scope="col" | Oil Production Days
 
!scope="col" | Water Quantity (bbl)
 
!scope="col" | Water Production Days
 
|-
 
| 2011
 
| [[EXCO RESOURCES PA LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2012
 
| [[EXCO RESOURCES PA LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2013
 
| [[EXCO RESOURCES PA LLC]]
 
| style="text-align: right;" | 1,239,588.00
 
| style="text-align: right;" | 302
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
 
|-
 
|-
| 2014
+
| 2011-08-18
| [[EXCO RESOURCES PA LLC]]
+
| New Permit Application
| style="text-align: right;" | 1,020,725.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
 
|-
 
|-
| 2015
+
| 2012-01-03
| [[EXCO RESOURCES PA LLC]]
+
| Performed Spud Operation
| style="text-align: right;" | 724,776.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2016
 
| [[EXCO RESOURCES PA LLC]]
 
| style="text-align: right;" | 479,465.00
 
| style="text-align: right;" | 278
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
 
|-
 
|-
| 2017
+
| 2012-06-26
| [[EXCO RESOURCES PA LLC]]
+
| Drilling Completion
| style="text-align: right;" | 473,281.00
 
| style="text-align: right;" | 337
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
 
|-
 
|-
| 2018
+
| 2012-11-17
| [[EXCO RESOURCES PA LLC]]
+
| Perforation
| style="text-align: right;" | 399,612.00
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
 
|-
 
|-
| 2019
+
| 2013-06-06
| [[EXCO RESOURCES PA LLC]]
+
| DEVIATED
| style="text-align: right;" | 90,270.00
 
| style="text-align: right;" | 90
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title =Oil and Gas Production Reports
+
  | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
|publisher = [[Pennsylvania Department of Environmental Protection]]
+
| date = 2020-02-27
| date = 2019-03-31
 
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-02-27 }}</ref>
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Disposal Method
 
!scope="col" | Waste Facility ID
 
|-
 
| 2012-S01
 
| Drill Cuttings (in Tons)
 
| style="text-align: right;" | 1,300.14 Tons
 
| LANDFILL
 
| 301358
 
|-
 
| 2012-S02
 
| Drill Cuttings (in Tons)
 
| style="text-align: right;" | 34.38 Tons
 
| LANDFILL
 
| 301358
 
|-
 
| 2012-S02
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 6,055.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2012-S02
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 205.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR119
 
|-
 
| 2013-S01
 
| Fracturing Fluid Waste (in Tons)
 
| style="text-align: right;" | 56.66 Tons
 
| LANDFILL
 
| 301358
 
|-
 
| 2013-S01
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1,352.34 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR119
 
|-
 
| 2013-S02
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 54.76 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123NC024
 
|-
 
| 2013-S02
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 392.80 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR119
 
|-
 
| 2013-S02
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 219.04 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC009
 
|-
 
| 2013-S02
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 176.19 Bbl
 
| STORAGE PENDING DISPOSAL OR REUSE
 
|
 
|-
 
| 2014-S01
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 220.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR119
 
|-
 
| 2014-S01
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 155.30 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC010
 
|-
 
| 2014-S01
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 73.80 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC024
 
|-
 
| 2014-S02
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 219.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D205BCLE
 
|-
 
| 2014-S02
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 110.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123
 
|-
 
| 2015-S01
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 164.80 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D205BCLE
 
|-
 
| 2015-S01
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 71.40 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2016-S01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 220.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D205BCLE
 
|-
 
| 2016-S02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 55.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D205BCLE
 
|-
 
| 2016-S02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 110.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW011
 
|-
 
| 2017-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 50.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D205BCLE
 
|-
 
| 2017-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 50.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D205BCLE
 
|-
 
| 2017-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 102.40 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D205BCLE
 
|-
 
| 2018-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 105.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 100.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D205BCLE
 
|-
 
| 2018-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 75.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D205BCLE
 
|-
 
| 2018-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 100.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D205BCLE
 
|-
 
| 2019-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 15.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D205BCLE
 
|-
 
| 2019-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 30.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D205BCLE
 
|-
 
| 2019-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 37.50 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D205BCLE
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Waste Reports
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-03-31
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Inspection Category
 
!scope="col" | Inspection Date
 
!scope="col" | Inspection Type
 
!scope="col" | Inspection Result
 
!scope="col" | Inspection Comments
 
|-
 
| 2023747
 
| Primary Facility
 
| 12/01/2011
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| Inspected the completed pad and access road.  Conductor for the 1-5H has been installed
 
|-
 
| 2055288
 
| Primary Facility
 
| 03/26/2012
 
| Routine/Complete Inspection
 
| No Violations Noted
 
|
 
|-
 
| 2112781
 
| Primary Facility
 
| 10/04/2012
 
| Routine/Complete Inspection
 
| No Violations Noted
 
|
 
|-
 
| 2603770
 
| Primary Facility
 
| 2017-06-07
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| Routine Inspection; 6/7/2017.
 
I entered the site at 12:25 off Coal Mine Road.  At the time of the inspection 5 wells were in production.  The well site has not been restored in accordance with the approved plans and the ESCGP expired on 10/3/2015. No violations noted at this time.
 
|-
 
| 2775720
 
| Primary Facility
 
| 2018-09-17
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| Fours wells staged for production phase. Four each water separators. Dump lines wrapped in insulating blanket. No leaks detected from production equipment. Methanol tanks located near well heads. No violations noted.
 
|-
 
|}
 
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Violation ID
 
!scope="col" | Violation Date
 
!scope="col" | Date Resolved
 
!scope="col" | Violation Code
 
!scope="col" | Violation Type
 
!scope="col" | Violation Comments
 
|-
 
|}-->
 
<!--==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Violation ID
 
!scope="col" | Penalty ID
 
!scope="col" | Penalty Code
 
!scope="col" | Penalty Status
 
!scope="col" | Penalty Date
 
!scope="col" | Enforcement Date
 
!scope="col" | Penalty Amount
 
!scope="col" | Amount Collected
 
|-
 
|}-->
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Compliance Report
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-05-20
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 430: Line 90:
 
|-
 
|-
 
| 1
 
| 1
| 11/12/2012
+
| 2012-11-12
| 11/12/2012
+
| 2012-11-12
| style="text-align: right;" | 9029.00
+
| style="text-align: right;" | 9,029
| style="text-align: right;" | 4,458,226.0
+
| style="text-align: right;" | 4,458,226
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
|-
 
|-
Line 710: Line 370:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2011
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 1,239,588.00
 +
| style="text-align: right;" | 302
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 1,020,725.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 724,776.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 479,465.00
 +
| style="text-align: right;" | 278
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 473,281.00
 +
| style="text-align: right;" | 337
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 399,612.00
 +
| style="text-align: right;" | 364
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 329,310.00
 +
| style="text-align: right;" | 363
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2012
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 205.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR119
 +
|-
 +
| 2012
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 6,055.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2012
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 1,334.52 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2013
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 54.76 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123NC024
 +
|-
 +
| 2013
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 392.80 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR119
 +
|-
 +
| 2013
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 176.19 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
|
 +
|-
 +
| 2013
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 56.66 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2013
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,352.34 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR119
 +
|-
 +
| 2013
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 219.04 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC009
 +
|-
 +
| 2014
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 220.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR119
 +
|-
 +
| 2014
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 219.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D205BCLE
 +
|-
 +
| 2014
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 73.80 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC024
 +
|-
 +
| 2014
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 155.30 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC010
 +
|-
 +
| 2014
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 110.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123
 +
|-
 +
| 2015
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 164.80 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D205BCLE
 +
|-
 +
| 2015
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 71.40 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 110.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2016
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 275.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D205BCLE
 +
|-
 +
| 2017
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 202.40 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D205BCLE
 +
|-
 +
| 2018
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 275.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D205BCLE
 +
|-
 +
| 2018
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 105.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 206.30 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D205BCLE
 +
|-
 +
| 2019
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 29.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2023747
 +
| Primary Facility
 +
| 2011-12-01
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Inspected the completed pad and access road.  Conductor for the 1-5H has been installed
 +
|-
 +
| 2055288
 +
| Primary Facility
 +
| 2012-03-26
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2112781
 +
| Primary Facility
 +
| 2012-10-04
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2603770
 +
| Primary Facility
 +
| 2017-06-07
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Routine Inspection; 6/7/2017.
 +
I entered the site at 12:25 off Coal Mine Road.  At the time of the inspection 5 wells were in production.  The well site has not been restored in accordance with the approved plans and the ESCGP expired on 10/3/2015. No violations noted at this time.
 +
|-
 +
| 2775720
 +
| Primary Facility
 +
| 2018-09-17
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Fours wells staged for production phase. Four each water separators. Dump lines wrapped in insulating blanket. No leaks detected from production equipment. Methanol tanks located near well heads. No violations noted.
 +
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>

Latest revision as of 00:32, 17 May 2020

Well Details

Well ID: 37-081-20681
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Cogan House Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID: 147915
Farm/Lease Name: CADWALADER UNIT 5H
License Status:
Spud Date:
Permit Date: 2011-08-18
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.369531
Longitude: -77.168622

For data sources see[1][2][3]

Well History

Date Event
2011-08-18 New Permit Application
2012-01-03 Performed Spud Operation
2012-06-26 Drilling Completion
2012-11-17 Perforation
2013-06-06 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-11-12 2012-11-12 9,029 4,458,226

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 DAP-925 Calfrac Well Services Acid Corrosion Inhibitor
DAP-103 Calfrac Well Services Iron Control
DWP-944 Calfrac Well Services Biocide
DAP-901 Calfrac Well Services Scale Inhibitor
DWP-612 Calfrac Well Services Friction Reducer
Water BaseFluid/Mix Water Water 7732-18-5 100.00 86.36
Sand (Proppant) Calfrac Well Services Propping Agent
Hydrochloric Acid Calfrac Well Services Clean Perforations Polyethylene glycol 25322-68-3 70.00 0.01
Citric acid 77-92-9 60.00 0.00324000
Quartz 14808-60-7 100.00 13.16
Organic phosphonate 1 30.00 0.00632000
Illite 12173-60-3 1.00 0.00777000
Sodium chloride 7647-14-5 1.00 0.00002000
Polyoxyalkylenes 30.00 0.00046000
Organic phosphonate 2 10.00 0.00211000
Nonionic surfactant 5.00 0.00575000
Acetic acid 64-19-7 1.00 0.00021000
Formalin 50-00-0 0.10 0.00004000
Ilmenite (FeTiO3), conc. 98072-94-7 0.10 0.00288000
Olefin 5.00 0.00008000
Goethite 1310-14-1 0.10 0.00598000
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.03
Thiourea polymer 68527-49-1 30.00 0.00046000
Ammonium chloride 12125-02-9 10.00 0.00126000
Amine salt 5.00 0.00105000
Polyacrylamide polymer 40.00 0.04
Carbonic acid calcium salt (1:1) 471-34-1 1.00 0.02
Fatty acids 30.00 0.00046000
Methanol 67-56-1 60.00 0.00724000
Biotite 1302-27-8 0.10 0.00391000
Apatite 64476-38-6 0.10 0.00391000
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 40.00 0.01
Polyoxyalkylenes surfactant 5.00 0.00575000
Hydrochloric acid 7647-01-0 37.00 0.32
Oxyalkylated polyamine 5.00 0.00105000
Propargyl Alcohol 10.00 0.00015000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 EXCO RESOURCES PA LLC 0.00 0 0.00 0 0.00 0
2012 EXCO RESOURCES PA LLC 0.00 0 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 1,239,588.00 302 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 1,020,725.00 365 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 724,776.00 365 0.00 0 0.00 0
2016 EXCO RESOURCES PA LLC 479,465.00 278 0.00 0 0.00 0
2017 EXCO RESOURCES PA LLC 473,281.00 337 0.00 0 0.00 0
2018 EXCO RESOURCES PA LLC 399,612.00 364 0.00 0 0.00 0
2019 EXCO RESOURCES PA LLC 329,310.00 363 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 EXCO RESOURCES PA LLC Produced Fluid 205.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 EXCO RESOURCES PA LLC Fracing Fluid Waste 6,055.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EXCO RESOURCES PA LLC Drill Cuttings 1,334.52 Tons LANDFILL 301358
2013 EXCO RESOURCES PA LLC Produced Fluid 54.76 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC024
2013 EXCO RESOURCES PA LLC Produced Fluid 392.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013 EXCO RESOURCES PA LLC Produced Fluid 176.19 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013 EXCO RESOURCES PA LLC Fracturing Fluid Waste 56.66 Tons LANDFILL 301358
2013 EXCO RESOURCES PA LLC Produced Fluid 1,352.34 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2013 EXCO RESOURCES PA LLC Produced Fluid 219.04 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC009
2014 EXCO RESOURCES PA LLC Produced Fluid 220.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 EXCO RESOURCES PA LLC Produced Fluid 219.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2014 EXCO RESOURCES PA LLC Produced Fluid 73.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC024
2014 EXCO RESOURCES PA LLC Produced Fluid 155.30 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014 EXCO RESOURCES PA LLC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 EXCO RESOURCES PA LLC Produced Fluid 164.80 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2015 EXCO RESOURCES PA LLC Produced Fluid 71.40 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EXCO RESOURCES PA LLC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 EXCO RESOURCES PA LLC Produced Fluid 275.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017 EXCO RESOURCES PA LLC Produced Fluid 202.40 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018 EXCO RESOURCES PA LLC Produced Fluid 275.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018 EXCO RESOURCES PA LLC Produced Fluid 105.00 Bbl REUSE (AT WELL PAD)
2019 EXCO RESOURCES PA LLC Produced Fluid 206.30 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2019 EXCO RESOURCES PA LLC Produced Fluid 29.00 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2023747 Primary Facility 2011-12-01 Routine/Complete Inspection No Violations Noted Inspected the completed pad and access road. Conductor for the 1-5H has been installed
2055288 Primary Facility 2012-03-26 Routine/Complete Inspection No Violations Noted
2112781 Primary Facility 2012-10-04 Routine/Complete Inspection No Violations Noted
2603770 Primary Facility 2017-06-07 Routine/Complete Inspection No Violations Noted Routine Inspection; 6/7/2017.

I entered the site at 12:25 off Coal Mine Road. At the time of the inspection 5 wells were in production. The well site has not been restored in accordance with the approved plans and the ESCGP expired on 10/3/2015. No violations noted at this time.

2775720 Primary Facility 2018-09-17 Routine/Complete Inspection No Violations Noted Fours wells staged for production phase. Four each water separators. Dump lines wrapped in insulating blanket. No leaks detected from production equipment. Methanol tanks located near well heads. No violations noted.

For data sources see[8]

References