X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-081-20878"

m
m
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-081-20878
 
| Well ID: 37-081-20878
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.250186, -76.630477 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.250186, -76.630478 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 
|-
 
|-
| County: [[Lycoming County, Pennsylvania|Lycoming]]
+
| County: [[Lycoming_County,_Pennsylvania|Lycoming]]
 
|-
 
|-
| Municipality: [[Penn Township, Lycoming County, Pennsylvania|Penn Township]]
+
| Municipality: [[Penn Township,_Lycoming_County,_Pennsylvania|Penn Township]]
 
|-
 
|-
| Operator Name: [[EXCO RESOURCES PA LLC|EXCO RESOURCES PA LLC]]
+
| Operator Name: [[EXCO RESOURCES PA LLC]]
 
|-
 
|-
 
| Well Pad ID: [[148163]]
 
| Well Pad ID: [[148163]]
Line 14: Line 19:
 
| Farm/Lease Name: DALE BOWER EAST UNIT 2H
 
| Farm/Lease Name: DALE BOWER EAST UNIT 2H
 
|-
 
|-
| First Permit Date: 2012-02-16
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2012-02-16
+
| Spud Date:  
 
|-
 
|-
| Spud Date: 2012-05-13
+
| Permit Date: 2012-02-16
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Producing: Yes
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: None
+
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.250186
 
| Latitude: 41.250186
 
|-
 
|-
| Longitude: -76.630477
+
| Longitude: -76.630478
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2012-02-16
 +
| New Permit Application
 +
|-
 +
| 2012-05-13
 +
| Performed Spud Operation
 +
|-
 +
| 2012-06-26
 +
| Drilling Completion
 +
|-
 +
| 2012-12-01
 +
| Perforation
 +
|-
 +
| 2013-06-06
 +
| DEVIATED
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Inspection Data ==
+
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2012-11-26
 +
| 2012-11-26
 +
| style="text-align: right;" | 6,055
 +
| style="text-align: right;" | 3,172,386
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Job Number
!scope="col" | DATE
+
!scope="col" | Trade Name
!scope="col" | DESCRIPTION
+
!scope="col" | Supplier
!scope="col" | COMMENT
+
!scope="col" | Purpose
!scope="col" | VIOLATION ID
+
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="37"| 1
 +
| rowspan="1"| Water
 +
| rowspan="1"|
 +
| rowspan="1"| BaseFluid/Mix Water
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 83.19
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="30"| Hydrochloric Acid
 +
| rowspan="30"| Calfrac Well Services
 +
| rowspan="30"| Clean Perforations
 +
| 2,2-Dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 40.00
 +
| style="text-align: right;" | 0.01
 +
| style="text-align: right;" |
 +
|-
 +
| Goethite
 +
| 1310-14-1
 +
| style="text-align: right;" | 0.10
 +
| style="text-align: right;" | 0.00604000
 +
| style="text-align: right;" |
 +
|-
 +
| Olefin
 +
|
 +
| style="text-align: right;" | 5.00
 +
| style="text-align: right;" | 0.00009000
 +
| style="text-align: right;" |
 +
|-
 +
| Ilmenite (FeTiO3), conc.
 +
| 98072-94-7
 +
| style="text-align: right;" | 0.10
 +
| style="text-align: right;" | 0.00162000
 +
| style="text-align: right;" |
 
|-
 
|-
| 2056393
+
| Organic phosphonate 2
| 2012-04-02
 
| No Violations Noted
 
 
|  
 
|  
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 0.00187000
 +
| style="text-align: right;" |
 +
|-
 +
| Polyoxyalkylenes surfactant
 
|  
 
|  
 +
| style="text-align: right;" | 5.00
 +
| style="text-align: right;" | 0.00355000
 +
| style="text-align: right;" |
 
|-
 
|-
 +
| Quartz
 +
| 14808-60-7
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 16.29
 +
| style="text-align: right;" |
 
|-
 
|-
| 2072728
+
| Polyethylene glycol
| 2012-06-01
+
| 25322-68-3
| No Violations Noted
+
| style="text-align: right;" | 70.00
 +
| style="text-align: right;" | 0.01
 +
| style="text-align: right;" |
 +
|-
 +
| Thiourea polymer
 +
| 68527-49-1
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00055000
 +
| style="text-align: right;" |
 +
|-
 +
| Apatite
 +
| 64476-38-6
 +
| style="text-align: right;" | 0.10
 +
| style="text-align: right;" | 0.00309000
 +
| style="text-align: right;" |
 +
|-
 +
| Sodium chloride
 +
| 7647-14-5
 +
| style="text-align: right;" | 1.00
 +
| style="text-align: right;" | 0.00002000
 +
| style="text-align: right;" |
 +
|-
 +
| Hydrochloric acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 37.00
 +
| style="text-align: right;" | 0.39
 +
| style="text-align: right;" |
 +
|-
 +
| Formalin
 +
| 50-00-0
 +
| style="text-align: right;" | 0.10
 +
| style="text-align: right;" | 0.00003000
 +
| style="text-align: right;" |
 +
|-
 +
| Methanol
 +
| 67-56-1
 +
| style="text-align: right;" | 60.00
 +
| style="text-align: right;" | 0.00671000
 +
| style="text-align: right;" |
 +
|-
 +
| Ammonium chloride
 +
| 12125-02-9
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 0.00112000
 +
| style="text-align: right;" |
 +
|-
 +
| Citric acid
 +
| 77-92-9
 +
| style="text-align: right;" | 60.00
 +
| style="text-align: right;" | 0.00389000
 +
| style="text-align: right;" |
 +
|-
 +
| Nonionic surfactant
 
|  
 
|  
 +
| style="text-align: right;" | 5.00
 +
| style="text-align: right;" | 0.00355000
 +
| style="text-align: right;" |
 +
|-
 +
| Illite
 +
| 12173-60-3
 +
| style="text-align: right;" | 1.00
 +
| style="text-align: right;" | 0.00437000
 +
| style="text-align: right;" |
 +
|-
 +
| Polyoxyalkylenes
 
|  
 
|  
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00055000
 +
| style="text-align: right;" |
 
|-
 
|-
 +
| Amine salt
 +
|
 +
| style="text-align: right;" | 5.00
 +
| style="text-align: right;" | 0.00093000
 +
| style="text-align: right;" |
 
|-
 
|-
| 2077287
+
| Fatty acids
| 2012-06-14
 
| No Violations Noted
 
|
 
 
|  
 
|  
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00055000
 +
| style="text-align: right;" |
 
|-
 
|-
 +
| Acetic acid
 +
| 64-19-7
 +
| style="text-align: right;" | 1.00
 +
| style="text-align: right;" | 0.00019000
 +
| style="text-align: right;" |
 
|-
 
|-
| 2081358
 
| 2012-07-05
 
| No Violations Noted
 
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 +
| Distillates, petroleum, hydrotreated light
 +
| 64742-47-8
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.02
 +
| style="text-align: right;" |
 
|-
 
|-
| 2084209
+
| Biotite
| 2012-07-19
+
| 1302-27-8
| No Violations Noted
+
| style="text-align: right;" | 0.10
|  
+
| style="text-align: right;" | 0.00309000
 +
| style="text-align: right;" |
 +
|-
 +
| Polyacrylamide polymer
 
|  
 
|  
 +
| style="text-align: right;" | 40.00
 +
| style="text-align: right;" | 0.02
 +
| style="text-align: right;" |
 
|-
 
|-
 +
| Carbonic acid calcium salt (1:1)
 +
| 471-34-1
 +
| style="text-align: right;" | 1.00
 +
| style="text-align: right;" | 0.03
 +
| style="text-align: right;" |
 
|-
 
|-
| 2090096
+
| Propargyl Alcohol
| 2012-08-07
 
| No Violations Noted
 
 
|  
 
|  
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 0.00018000
 +
| style="text-align: right;" |
 +
|-
 +
| Organic phosphonate 1
 
|  
 
|  
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00560000
 +
| style="text-align: right;" |
 
|-
 
|-
 +
| Oxyalkylated polyamine
 +
|
 +
| style="text-align: right;" | 5.00
 +
| style="text-align: right;" | 0.00093000
 +
| style="text-align: right;" |
 
|-
 
|-
| 2110543
+
|- valign="top"
| 2012-10-24
+
| rowspan="1"| DAP-103
| No Violations Noted
+
| rowspan="1"| Calfrac Well Services
 +
| rowspan="1"| Iron Control
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| DAP-925
 +
| rowspan="1"| Calfrac Well Services
 +
| rowspan="1"| Acid Corrosion Inhibitor
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
| 2119050
+
|- valign="top"
| 2012-11-27
+
| rowspan="1"| DWP-944
| No Violations Noted
+
| rowspan="1"| Calfrac Well Services
 +
| rowspan="1"| Biocide
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| Sand (Proppant)
 +
| rowspan="1"| Calfrac Well Services
 +
| rowspan="1"| Propping Agent
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
| 2128359
+
|- valign="top"
| 2012-12-31
+
| rowspan="1"| DWP-612
| No Violations Noted
+
| rowspan="1"| Calfrac Well Services
 +
| rowspan="1"| Friction Reducer
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
|-
+
|- valign="top"
| 2136081
+
| rowspan="1"| DAP-901
| 2013-01-25
+
| rowspan="1"| Calfrac Well Services
| No Violations Noted
+
| rowspan="1"| Scale Inhibitor
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2012
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 763,303.00
 +
| style="text-align: right;" | 315
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-2
+
| 2014
| style="text-align:right;" | 0.0
+
| [[EXCO RESOURCES PA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 859,945.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2015
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 739,384.00
 +
| style="text-align: right;" | 349
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-1
+
| 2016
| style="text-align:right;" | 0.0
+
| [[EXCO RESOURCES PA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 564,636.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 312
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 530,970.00
 +
| style="text-align: right;" | 337
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 503,356.00
 +
| style="text-align: right;" | 364
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 432,976.00
 +
| style="text-align: right;" | 364
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
+
|-
!scope="col" | FACILITY CITY
+
| 2012
!scope="col" | FACILITY STATE
+
| [[EXCO RESOURCES PA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 400.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR119
 +
|-
 +
| 2012
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 3,374.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|  
 
|-
 
|-
| 2012-2
+
| 2012
| FRACING FLUID WASTE
+
| [[EXCO RESOURCES PA LLC]]
| style="text-align:right;" | 100.0
+
| Drill Cuttings
| Bbl
+
| style="text-align: right;" | 1,316.42 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2012
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 100.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR119
 
| WMGR119
| EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT)
 
| WILLIAMSPORT
 
| PA
 
 
|-
 
|-
 +
| 2013
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 71.43 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
|
 
|-
 
|-
| 2012-2
+
| 2013
| DRILL CUTTINGS
+
| [[EXCO RESOURCES PA LLC]]
| style="text-align:right;" | 475.4
+
| Fracturing Fluid Waste
| Tons
+
| style="text-align: right;" | 33.46 Tons
 
| LANDFILL
 
| LANDFILL
| 743884
+
| 301358
| PHOENIX RESOURCES LANDFILL
 
| WELLSBORO
 
| PA
 
 
|-
 
|-
 +
| 2013
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 54.76 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC009
 
|-
 
|-
| 2012-2
+
| 2014
| FRACING FLUID WASTE
+
| [[EXCO RESOURCES PA LLC]]
| style="text-align:right;" | 3374.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 110.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D205BCLE
 +
|-
 +
| 2015
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 98.90 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D205BCLE
 +
|-
 +
| 2015
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 78.80 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE FOR HYDRAULIC FRACTURING
+
|-
 +
| 2016
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 22.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2016
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 106.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D205BCLE
 +
|-
 +
| 2017
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 115.50 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D205BCLE
 +
|-
 +
| 2018
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 99.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D205BCLE
 +
|-
 +
| 2018
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 24.60 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 32.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC010
 +
|-
 +
| 2019
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 63.80 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D205BCLE
 +
|-
 +
| 2019
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 38.40 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2056393
 +
| Primary Facility
 +
| 2012-04-02
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2072728
 +
| Primary Facility
 +
| 2012-06-01
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2077287
 +
| Primary Facility
 +
| 2012-06-14
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2081358
 +
| Primary Facility
 +
| 2012-07-05
 +
| Complaint Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2084209
 +
| Primary Facility
 +
| 2012-07-19
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2090096
 +
| Primary Facility
 +
| 2012-08-07
 +
| Incident- Response to Accident or Event
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2110543
 +
| Primary Facility
 +
| 2012-10-24
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2119050
 +
| Primary Facility
 +
| 2012-11-27
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2128359
 +
| Primary Facility
 +
| 2012-12-31
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2136081
 +
| Primary Facility
 +
| 2013-01-25
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 
|-
 
|-
 +
| 2462154
 +
| Primary Facility
 +
| 2016-03-07
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| I inspected the site after receiving an email about the operation of the waste impoundment (Frac impoundment on E&S Plans).  At the time of the inspection, 5 wells onsite were in production.  Two impoundments were located onsite.  One impoundment was completely frozen over and the other had no ice.  The waste impoundment had approximately 2 foot of freeboard and was completely frozen over so i could not collect a sample.  I collected sample 3440267 at 12:15 from the northeast impoundment where no ice was present which was labeled as fresh water.  Field conductivity from this impoundment was approximately 40 umhos/cm.  The site, including the impoundments, has not been restored because an active well permit exists for the site; yet, the impoundment has been holding waste since 2012.  I recommend reclaiming the waste impoundment to minimize the associated liability since the site was not constructed to the centralized impoundment standards and does not include groundwater monitoring through monitoring wells.
 
|-
 
|-
| 2012-1
+
| 2584389
| DRILLING FLUID WASTE
+
| Primary Facility
| style="text-align:right;" | 400.0
+
| 2017-04-13
| Bbl
+
| Routine/Partial Inspection
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| No Violations Noted
| WMGR119
+
| I arrived on-site @ 09:30 hrs. in response to an email notification regarding removal of sludge and liner from the on-site wastewater impoundment prior to closure.  I was greeted by Russ Lawrence of EXCO as I arrived; Mr. Lawrence informed me that he was just getting ready to contact Ben Bahner, WQS for the area, to inform him of a potential issue with the impoundment.  On Wednesday 4/12 the sludge had been removed from the impoundment and the upper layer of liner pulled out; Mr. Lawrence noted that there was fluid present on the lower layer of liner.  Conductivity readings of this fluid were in the 11-12 mS/cm range, indicating that the upper liner had likely leaked.  The felt and mesh material that had been present between the two layers of liner was pulled up onto the impoundment slope to dry and the fluid was removed by a vac truck.  On Thursday 4/13 @08:00 hrs. removal of the lower liner commenced, and Mr. Lawrence began taking soil conductance readings in the impoundment; he noted an area approximately
| EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT)
 
| WILLIAMSPORT
 
| PA
 
 
|-
 
|-
 +
| 2584613
 +
| Primary Facility
 +
| 2017-04-17
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Routine Inspection; 4/17/2017.
 +
I entered the site at 12:03 and met with Rick Mays and Barry Graham (both EXCO).  We met onsite to discuss the implementation of the PCSM (Post Construction Stormwater Management) plans after the Frac Pit onsite is properly removed and screened (see SeanVanFleet’s inspection report from 4/13/2017).  EXCO proposes to push the PCSM BMP’s closer to the well pad after topsoil stockpile is removed on the north side of the well pad.  In addition, they proposed using an earthen berm as an alternative.  I requestedthe operator have their consultant contact Dan Harvey (DEP) to discuss what documentation is required for this proposed modification.  I do agree that moving the PCSM BMP’s closer to the well pad will reduce the overall footprint and minimize the amount offarm land impacted by the well pad.  While reviewing the newest ESCGP permit it was noted that one wetland is noted on the north side of the well pad.  The area delineated as a wetland is currently in the middle of the land
 
|-
 
|-
| 2012-1
+
| 2773958
| DRILL CUTTINGS
+
| Primary Facility
| style="text-align:right;" | 841.02
+
| 2018-09-12
| Tons
+
| Routine/Complete Inspection
| LANDFILL
+
| No Violations Noted
| 743884
+
| Five wells staged for production phase. Five each water separators. No leaks detected from production equipment. Methanol tank on location. No violations noted.
| PHOENIX RESOURCES LANDFILL
 
| WELLSBORO
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 00:57, 17 May 2020

Well Details

Well ID: 37-081-20878
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Penn Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID: 148163
Farm/Lease Name: DALE BOWER EAST UNIT 2H
License Status:
Spud Date:
Permit Date: 2012-02-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.250186
Longitude: -76.630478

For data sources see[1][2][3]

Well History

Date Event
2012-02-16 New Permit Application
2012-05-13 Performed Spud Operation
2012-06-26 Drilling Completion
2012-12-01 Perforation
2013-06-06 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-11-26 2012-11-26 6,055 3,172,386

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water BaseFluid/Mix Water Water 7732-18-5 100.00 83.19
Hydrochloric Acid Calfrac Well Services Clean Perforations 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 40.00 0.01
Goethite 1310-14-1 0.10 0.00604000
Olefin 5.00 0.00009000
Ilmenite (FeTiO3), conc. 98072-94-7 0.10 0.00162000
Organic phosphonate 2 10.00 0.00187000
Polyoxyalkylenes surfactant 5.00 0.00355000
Quartz 14808-60-7 100.00 16.29
Polyethylene glycol 25322-68-3 70.00 0.01
Thiourea polymer 68527-49-1 30.00 0.00055000
Apatite 64476-38-6 0.10 0.00309000
Sodium chloride 7647-14-5 1.00 0.00002000
Hydrochloric acid 7647-01-0 37.00 0.39
Formalin 50-00-0 0.10 0.00003000
Methanol 67-56-1 60.00 0.00671000
Ammonium chloride 12125-02-9 10.00 0.00112000
Citric acid 77-92-9 60.00 0.00389000
Nonionic surfactant 5.00 0.00355000
Illite 12173-60-3 1.00 0.00437000
Polyoxyalkylenes 30.00 0.00055000
Amine salt 5.00 0.00093000
Fatty acids 30.00 0.00055000
Acetic acid 64-19-7 1.00 0.00019000
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
Biotite 1302-27-8 0.10 0.00309000
Polyacrylamide polymer 40.00 0.02
Carbonic acid calcium salt (1:1) 471-34-1 1.00 0.03
Propargyl Alcohol 10.00 0.00018000
Organic phosphonate 1 30.00 0.00560000
Oxyalkylated polyamine 5.00 0.00093000
DAP-103 Calfrac Well Services Iron Control
DAP-925 Calfrac Well Services Acid Corrosion Inhibitor
DWP-944 Calfrac Well Services Biocide
Sand (Proppant) Calfrac Well Services Propping Agent
DWP-612 Calfrac Well Services Friction Reducer
DAP-901 Calfrac Well Services Scale Inhibitor

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 EXCO RESOURCES PA LLC 0.00 0 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 763,303.00 315 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 859,945.00 365 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 739,384.00 349 0.00 0 0.00 0
2016 EXCO RESOURCES PA LLC 564,636.00 312 0.00 0 0.00 0
2017 EXCO RESOURCES PA LLC 530,970.00 337 0.00 0 0.00 0
2018 EXCO RESOURCES PA LLC 503,356.00 364 0.00 0 0.00 0
2019 EXCO RESOURCES PA LLC 432,976.00 364 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 EXCO RESOURCES PA LLC Drilling Fluid Waste 400.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 EXCO RESOURCES PA LLC Fracing Fluid Waste 3,374.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EXCO RESOURCES PA LLC Drill Cuttings 1,316.42 Tons LANDFILL 301358
2012 EXCO RESOURCES PA LLC Fracing Fluid Waste 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2013 EXCO RESOURCES PA LLC Produced Fluid 71.43 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013 EXCO RESOURCES PA LLC Fracturing Fluid Waste 33.46 Tons LANDFILL 301358
2013 EXCO RESOURCES PA LLC Produced Fluid 54.76 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC009
2014 EXCO RESOURCES PA LLC Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2015 EXCO RESOURCES PA LLC Produced Fluid 98.90 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2015 EXCO RESOURCES PA LLC Produced Fluid 78.80 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EXCO RESOURCES PA LLC Produced Fluid 22.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 EXCO RESOURCES PA LLC Produced Fluid 106.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017 EXCO RESOURCES PA LLC Produced Fluid 115.50 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018 EXCO RESOURCES PA LLC Produced Fluid 99.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018 EXCO RESOURCES PA LLC Produced Fluid 24.60 Bbl REUSE (AT WELL PAD)
2018 EXCO RESOURCES PA LLC Produced Fluid 32.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 EXCO RESOURCES PA LLC Produced Fluid 63.80 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2019 EXCO RESOURCES PA LLC Produced Fluid 38.40 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2056393 Primary Facility 2012-04-02 Routine/Partial Inspection No Violations Noted
2072728 Primary Facility 2012-06-01 Drilling/Alteration No Violations Noted
2077287 Primary Facility 2012-06-14 Routine/Complete Inspection No Violations Noted
2081358 Primary Facility 2012-07-05 Complaint Inspection No Violations Noted
2084209 Primary Facility 2012-07-19 Drilling/Alteration No Violations Noted
2090096 Primary Facility 2012-08-07 Incident- Response to Accident or Event No Violations Noted
2110543 Primary Facility 2012-10-24 Routine/Complete Inspection No Violations Noted
2119050 Primary Facility 2012-11-27 Routine/Complete Inspection No Violations Noted
2128359 Primary Facility 2012-12-31 Routine/Complete Inspection No Violations Noted
2136081 Primary Facility 2013-01-25 Routine/Complete Inspection No Violations Noted
2462154 Primary Facility 2016-03-07 Routine/Complete Inspection No Violations Noted I inspected the site after receiving an email about the operation of the waste impoundment (Frac impoundment on E&S Plans). At the time of the inspection, 5 wells onsite were in production. Two impoundments were located onsite. One impoundment was completely frozen over and the other had no ice. The waste impoundment had approximately 2 foot of freeboard and was completely frozen over so i could not collect a sample. I collected sample 3440267 at 12:15 from the northeast impoundment where no ice was present which was labeled as fresh water. Field conductivity from this impoundment was approximately 40 umhos/cm. The site, including the impoundments, has not been restored because an active well permit exists for the site; yet, the impoundment has been holding waste since 2012. I recommend reclaiming the waste impoundment to minimize the associated liability since the site was not constructed to the centralized impoundment standards and does not include groundwater monitoring through monitoring wells.
2584389 Primary Facility 2017-04-13 Routine/Partial Inspection No Violations Noted I arrived on-site @ 09:30 hrs. in response to an email notification regarding removal of sludge and liner from the on-site wastewater impoundment prior to closure. I was greeted by Russ Lawrence of EXCO as I arrived; Mr. Lawrence informed me that he was just getting ready to contact Ben Bahner, WQS for the area, to inform him of a potential issue with the impoundment. On Wednesday 4/12 the sludge had been removed from the impoundment and the upper layer of liner pulled out; Mr. Lawrence noted that there was fluid present on the lower layer of liner. Conductivity readings of this fluid were in the 11-12 mS/cm range, indicating that the upper liner had likely leaked. The felt and mesh material that had been present between the two layers of liner was pulled up onto the impoundment slope to dry and the fluid was removed by a vac truck. On Thursday 4/13 @08:00 hrs. removal of the lower liner commenced, and Mr. Lawrence began taking soil conductance readings in the impoundment; he noted an area approximately
2584613 Primary Facility 2017-04-17 Routine/Complete Inspection No Violations Noted Routine Inspection; 4/17/2017.

I entered the site at 12:03 and met with Rick Mays and Barry Graham (both EXCO). We met onsite to discuss the implementation of the PCSM (Post Construction Stormwater Management) plans after the Frac Pit onsite is properly removed and screened (see SeanVanFleet’s inspection report from 4/13/2017). EXCO proposes to push the PCSM BMP’s closer to the well pad after topsoil stockpile is removed on the north side of the well pad. In addition, they proposed using an earthen berm as an alternative. I requestedthe operator have their consultant contact Dan Harvey (DEP) to discuss what documentation is required for this proposed modification. I do agree that moving the PCSM BMP’s closer to the well pad will reduce the overall footprint and minimize the amount offarm land impacted by the well pad. While reviewing the newest ESCGP permit it was noted that one wetland is noted on the north side of the well pad. The area delineated as a wetland is currently in the middle of the land

2773958 Primary Facility 2018-09-12 Routine/Complete Inspection No Violations Noted Five wells staged for production phase. Five each water separators. No leaks detected from production equipment. Methanol tank on location. No violations noted.

For data sources see[8]

References