X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-053-27669"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-053-27669
 
| Well ID: 37-053-27669
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.612396, -79.141372 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.612396, -79.141372 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: PROPER 2
 
| Farm/Lease Name: PROPER 2
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 2004-03-01
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2004-02-20
 
| Permit Date: 2004-02-20
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.612396
 
| Latitude: 41.612396
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2004-02-20
 +
| New Permit Application
 +
|-
 +
| 2004-03-01
 +
| Performed Spud Operation
 +
|-
 +
| 2004-03-05
 +
| Drilling Completion
 +
|-
 +
| 2004-08-06
 +
| Perforation
 +
|-
 +
| 2005-03-03
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 87: Line 128:
 
| 2006
 
| 2006
 
| [[SYND ENTERPRISES INC]]
 
| [[SYND ENTERPRISES INC]]
| style="text-align: right;" | 1,423.50
+
| style="text-align: right;" | 1423.50
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 134.00
 
| style="text-align: right;" | 134.00
Line 132: Line 173:
 
| 2011
 
| 2011
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 141.40
+
| style="text-align: right;" | 141.4
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 15.60
 
| style="text-align: right;" | 15.60
Line 145: Line 186:
 
| style="text-align: right;" | 30.10
 
| style="text-align: right;" | 30.10
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
| style="text-align: right;" | 12.00
+
| style="text-align: right;" | 12
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
|-
 
|-
Line 154: Line 195:
 
| style="text-align: right;" | 12.47
 
| style="text-align: right;" | 12.47
 
| style="text-align: right;" | 120
 
| style="text-align: right;" | 120
| style="text-align: right;" | 0.00
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 120
 
|-
 
|-
 
| 2015
 
| 2015
Line 172: Line 213:
 
| style="text-align: right;" | 15.30
 
| style="text-align: right;" | 15.30
 
| style="text-align: right;" | 93
 
| style="text-align: right;" | 93
| style="text-align: right;" | 0.00
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 93
 
|-
 
|-
 
| 2017
 
| 2017
Line 211: Line 252:
 
| 2010
 
| 2010
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 22.90 Bbl
 
| style="text-align: right;" | 22.90 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 218: Line 259:
 
| 2012
 
| 2012
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 12.40 Bbl
 
| style="text-align: right;" | 12.40 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 225: Line 266:
 
| 2014
 
| 2014
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 19.96 Bbl
 
| style="text-align: right;" | 19.96 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0102784
 +
|-
 +
| 2014
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 19.96 Bbl
 +
| CENT WASTE TRT FAC NPDES
 
| PA0102784
 
| PA0102784
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[CAMERON ENERGY CO]]
 
| [[CAMERON ENERGY CO]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 10.00 Bbl
 
| style="text-align: right;" | 10.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
Line 239: Line 287:
 
| 2017
 
| 2017
 
| [[CAMERON ENERGY CO]]
 
| [[CAMERON ENERGY CO]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 38.00 Bbl
+
| style="text-align: right;" | 34.00 Bbl
| REUSE OTHER THAN ROAD SPREADING
+
| ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[CAMERON ENERGY CO]]
 
| [[CAMERON ENERGY CO]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 34.00 Bbl
+
| style="text-align: right;" | 38.00 Bbl
| ROAD SPREADING
+
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[CAMERON ENERGY CO]]
 
| [[CAMERON ENERGY CO]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 46.80 Bbl
 
| style="text-align: right;" | 46.80 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2019
 +
| [[CAMERON ENERGY CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 28.10 Bbl
 +
| REUSE AT A CONVENTIONAL WELL SITE IN PA
 
|  
 
|  
 
|-
 
|-

Latest revision as of 03:39, 17 May 2020

Well Details

Well ID: 37-053-27669
Loading map...
Country: United States
State: Pennsylvania
County: Forest
Municipality: Howe Township
Operator Name: CAMERON ENERGY CO
Well Pad ID:
Farm/Lease Name: PROPER 2
License Status: ACTIVE
Spud Date:
Permit Date: 2004-02-20
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.612396
Longitude: -79.141372

For data sources see[1][2][3]

Well History

Date Event
2004-02-20 New Permit Application
2004-03-01 Performed Spud Operation
2004-03-05 Drilling Completion
2004-08-06 Perforation
2005-03-03 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 SYND ENTERPRISES INC 1423.50 365 134.00 365 0.00 0
2007 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2008 CATALYST ENERGY INC 393.80 365 58.80 365 0.00 0
2009 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2010 CATALYST ENERGY INC 343.00 365 61.30 365 0.00 0
2011 CATALYST ENERGY INC 141.4 365 15.60 365 0.00 0
2012 CATALYST ENERGY INC 240.00 366 30.10 366 12 366
2014 CATALYST ENERGY INC 0.00 0 12.47 120 0 120
2015 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2016 CAMERON ENERGY CO 66.00 93 15.30 93 0 93
2017 CAMERON ENERGY CO 489.07 270 197.57 270 0.00 0
2018 CAMERON ENERGY CO 370.41 270 76.68 270 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CATALYST ENERGY INC Produced Fluid 22.90 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2012 CATALYST ENERGY INC Produced Fluid 12.40 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2014 CATALYST ENERGY INC Produced Fluid 19.96 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2014 CATALYST ENERGY INC Produced Fluid 19.96 Bbl CENT WASTE TRT FAC NPDES PA0102784
2016 CAMERON ENERGY CO Produced Fluid 10.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CAMERON ENERGY CO Produced Fluid 34.00 Bbl ROAD SPREADING
2017 CAMERON ENERGY CO Produced Fluid 38.00 Bbl REUSE OTHER THAN ROAD SPREADING
2018 CAMERON ENERGY CO Produced Fluid 46.80 Bbl REUSE OTHER THAN ROAD SPREADING
2019 CAMERON ENERGY CO Produced Fluid 28.10 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1317729 Primary Facility 2004-03-09 Routine/Complete Inspection Violation(s) Noted
1317924 Primary Facility 2004-03-09 Drilling/Alteration No Violations Noted
1325865 Primary Facility 2004-04-07 Compliance Evaluation No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1317729 386448 03/09/2004 2004-03-09 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety not seeded or mulched

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
386448 137254 NOV - Notice of Violation Comply/Closed 2004-04-07

For data sources see[7]

References