X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-053-28306"

m
 
m
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-053-28306
 
| Well ID: 37-053-28306
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.575173, -79.031256 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.575174, -79.031257 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[CATALYST ENERGY INC]]
+
| County: [[Forest_County,_Pennsylvania|Forest]]
 
|-
 
|-
| First Permit Date: 2006-04-11
+
| Municipality: [[Howe Township,_Forest_County,_Pennsylvania|Howe Township]]
 
|-
 
|-
| Last Permit Date: 2006-04-11
+
| Operator Name: [[BULL RUN RESOURCES LLC]]
 
|-
 
|-
| Spud Date: 2006-08-07
+
| Well Pad ID:  
 
|-
 
|-
| Unconventional: No
+
| Farm/Lease Name: SUB LOT 53 WATSON FARM 6
 
|-
 
|-
| Horizontal: No
+
| License Status: ACTIVE
 
|-
 
|-
| Violations: None
+
| Spud Date:  
 
|-
 
|-
| Latitude: 41.575173
+
| Permit Date: 2006-04-11
 
|-
 
|-
| Longitude: -79.031256
+
| Well Type: COMB. OIL&GAS
 
|-
 
|-
 +
| Unconventional Well: N
 +
|-
 +
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 +
|-
 +
| Latitude: 41.575174
 +
|-
 +
| Longitude: -79.031257
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2006-04-11
 +
| New Permit Application
 +
|-
 +
| 2006-08-07
 +
| Performed Spud Operation
 +
|-
 +
| 2006-08-09
 +
| Drilling Completion
 +
|-
 +
| 2006-10-09
 +
| Perforation
 +
|-
 +
| 2007-03-29
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2012-0
+
| 2006
| style="text-align:right;" | 637.5
+
| [[SYND ENTERPRISES INC]]
| style="text-align:right;" | 366.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 22.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 366.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 69.5
+
| style="text-align: right;" | 0
| style="text-align:right;" | 366.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2008
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 527.25
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 40.50
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-0
+
| 2009
| style="text-align:right;" | 253.75
+
| [[CATALYST ENERGY INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 77.25
+
| style="text-align: right;" | 0
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2010
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 1,106.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 118.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-0
+
| 2011
| style="text-align:right;" | 1106.0
+
| [[CATALYST ENERGY INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 253.75
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 77.25
| style="text-align:right;" | 118.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2012
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 637.5
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 69.50
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 22
 +
| style="text-align: right;" | 366
 
|-
 
|-
| 2009-0
+
| 2014
| style="text-align:right;" | 0.0
+
| [[CATALYST ENERGY INC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 25.25
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 180
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 15.63
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 180
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 1.31
 +
| style="text-align: right;" | 180
 
|-
 
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 107.75
 +
| style="text-align: right;" | 122
 +
| style="text-align: right;" | 8.92
 +
| style="text-align: right;" | 122
 +
| style="text-align: right;" | 1.11
 +
| style="text-align: right;" | 122
 
|-
 
|-
| 2008-0
+
| 2016
| style="text-align:right;" | 527.25
+
| [[CATALYST ENERGY INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 288.75
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 335
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 40.5
+
| style="text-align: right;" | 0
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 0.97
 +
| style="text-align: right;" | 335
 
|-
 
|-
 +
| 2017
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 296.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 35.98
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2006-0
+
| 2018
| style="text-align:right;" | 0.0
+
| [[BULL RUN RESOURCES LLC]]
| style="text-align:right;" | 90.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 77.75
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 90.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-0
+
| 2010
| PRODUCED FLUID
+
| [[CATALYST ENERGY INC]]
| style="text-align:right;" | 22.5
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 19.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0102784
 
| PA0102784
| WASTE TREATMENT CORPORATION
 
| WARREN
 
| PA
 
 
|-
 
|-
 +
| 2011
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 38.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0102784
 
|-
 
|-
| 2010-0
+
| 2012
| PRODUCED FLUID
+
| [[CATALYST ENERGY INC]]
| style="text-align:right;" | 19.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 22.50 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0102784
 
| PA0102784
| WASTE TREATMENT CORPORATION
 
| WARREN
 
| PA
 
 
|-
 
|-
 +
| 2014
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 15.64 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0102784
 
|-
 
|-
| 2011-0
+
| 2014
| PRODUCED FLUID
+
| [[CATALYST ENERGY INC]]
| style="text-align:right;" | 38.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 15.64 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| CENT WASTE TRT FAC NPDES
 
| PA0102784
 
| PA0102784
| WASTE TREATMENT CORPORATION
 
| WARREN
 
| PA
 
 
|-
 
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 41.13 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0102784
 
|-
 
|-
| 2012-0
+
| 2015
| PRODUCED FLUID
+
| [[CATALYST ENERGY INC]]
| style="text-align:right;" | 22.5
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 41.13 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| CENT WASTE TRT FAC NPDES
 
| PA0102784
 
| PA0102784
| WASTE TREATMENT CORPORATION
+
|-
| WARREN
+
| 2016
| PA
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 23.75 Bbl
 +
| ROAD SPREADING
 +
|
 +
|-
 +
| 2017
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 77.56 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2017
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 6.55 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D215BWAR
 +
|-
 +
| 2017
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 26.79 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2018
 +
| [[BULL RUN RESOURCES LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 12.50 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2019
 +
| [[BULL RUN RESOURCES LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 31.25 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2019
 +
| [[BULL RUN RESOURCES LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 20.00 Bbl
 +
| REUSE AT A CONVENTIONAL WELL SITE IN PA
 +
|
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 1597927
 
| 1597927
 +
| Primary Facility
 
| 2007-01-29
 
| 2007-01-29
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2259764
 +
| Primary Facility
 +
| 2014-04-04
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2540421
 +
| Primary Facility
 +
| 2016-11-30
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 04:46, 17 May 2020

Well Details

Well ID: 37-053-28306
Loading map...
Country: United States
State: Pennsylvania
County: Forest
Municipality: Howe Township
Operator Name: BULL RUN RESOURCES LLC
Well Pad ID:
Farm/Lease Name: SUB LOT 53 WATSON FARM 6
License Status: ACTIVE
Spud Date:
Permit Date: 2006-04-11
Well Type: COMB. OIL&GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.575174
Longitude: -79.031257

For data sources see[1][2][3]

Well History

Date Event
2006-04-11 New Permit Application
2006-08-07 Performed Spud Operation
2006-08-09 Drilling Completion
2006-10-09 Perforation
2007-03-29 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 SYND ENTERPRISES INC 0.00 0 0.00 0 0.00 0
2008 CATALYST ENERGY INC 527.25 365 40.50 365 0.00 0
2009 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2010 CATALYST ENERGY INC 1,106.00 365 118.00 365 0.00 0
2011 CATALYST ENERGY INC 253.75 365 77.25 365 0.00 0
2012 CATALYST ENERGY INC 637.5 366 69.50 366 22 366
2014 CATALYST ENERGY INC 25.25 180 15.63 180 1.31 180
2015 CATALYST ENERGY INC 107.75 122 8.92 122 1.11 122
2016 CATALYST ENERGY INC 288.75 335 0.00 0 0.97 335
2017 CATALYST ENERGY INC 296.00 365 35.98 365 0.00 0
2018 BULL RUN RESOURCES LLC 0.00 0 77.75 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CATALYST ENERGY INC Produced Fluid 19.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011 CATALYST ENERGY INC Produced Fluid 38.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2012 CATALYST ENERGY INC Produced Fluid 22.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2014 CATALYST ENERGY INC Produced Fluid 15.64 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2014 CATALYST ENERGY INC Produced Fluid 15.64 Bbl CENT WASTE TRT FAC NPDES PA0102784
2015 CATALYST ENERGY INC Produced Fluid 41.13 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2015 CATALYST ENERGY INC Produced Fluid 41.13 Bbl CENT WASTE TRT FAC NPDES PA0102784
2016 CATALYST ENERGY INC Produced Fluid 23.75 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 77.56 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 CATALYST ENERGY INC Produced Fluid 6.55 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2017 CATALYST ENERGY INC Produced Fluid 26.79 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 BULL RUN RESOURCES LLC Produced Fluid 12.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 BULL RUN RESOURCES LLC Produced Fluid 31.25 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2019 BULL RUN RESOURCES LLC Produced Fluid 20.00 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1597927 Primary Facility 2007-01-29 Routine/Complete Inspection No Violations Noted
2259764 Primary Facility 2014-04-04 Routine/Complete Inspection No Violations Noted
2540421 Primary Facility 2016-11-30 Routine/Complete Inspection No Violations Noted

For data sources see[7]

References