X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-00896"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-00896
 
| Well ID: 37-003-00896
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.415310, -80.203427 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.415310, -80.203427 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: J. WHITMORE 7
 
| Farm/Lease Name: J. WHITMORE 7
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 1800-01-01
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date:  
 
| Permit Date:  
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.415310
 
| Latitude: 40.415310
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1901-01-01
 +
| Drilling Completion
 +
|-
 +
| 1987-01-01
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 92:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 98: Line 130:
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 415.00
+
| style="text-align: right;" | 415
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 116: Line 148:
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 349.00
+
| style="text-align: right;" | 349
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 234: Line 266:
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 79.31
 
| style="text-align: right;" | 79.31
 +
| style="text-align: right;" | 208
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[NEW CENTURY ENERGY INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 377.00
 
| style="text-align: right;" | 208
 
| style="text-align: right;" | 208
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 291: Line 332:
 
| 2011
 
| 2011
 
| [[NEW CENTURY ENERGY INC]]
 
| [[NEW CENTURY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 2,067.00 Bbl
 
| style="text-align: right;" | 2,067.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 298: Line 339:
 
| 2012
 
| 2012
 
| [[NEW CENTURY ENERGY INC]]
 
| [[NEW CENTURY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 1,867.00 Bbl
 
| style="text-align: right;" | 1,867.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
Line 305: Line 346:
 
| 2013
 
| 2013
 
| [[NEW CENTURY ENERGY INC]]
 
| [[NEW CENTURY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 1,838.00 Bbl
 
| style="text-align: right;" | 1,838.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
Line 312: Line 353:
 
| 2014
 
| 2014
 
| [[NEW CENTURY ENERGY INC]]
 
| [[NEW CENTURY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 985.00 Bbl
 
| style="text-align: right;" | 985.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0025984
 +
|-
 +
| 2015
 +
| [[NEW CENTURY ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,310.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0025984
 
| PA0025984
Line 319: Line 367:
 
| 2016
 
| 2016
 
| [[NEW CENTURY ENERGY INC]]
 
| [[NEW CENTURY ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 1,539.00 Bbl
 
| style="text-align: right;" | 1,539.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
Line 326: Line 374:
 
| 2017
 
| 2017
 
| [[NEW CENTURY ENERGY INC]]
 
| [[NEW CENTURY ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 156.00 Bbl
 
| style="text-align: right;" | 156.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
Line 333: Line 381:
 
| 2018
 
| 2018
 
| [[NEW CENTURY ENERGY INC]]
 
| [[NEW CENTURY ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 205.00 Bbl
 
| style="text-align: right;" | 205.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0025984
 +
|-
 +
| 2019
 +
| [[NEW CENTURY ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,160.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0025984
 
| PA0025984

Latest revision as of 10:00, 20 May 2020

Well Details

Well ID: 37-003-00896
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: North Fayette Township
Operator Name: NEW CENTURY ENERGY INC
Well Pad ID:
Farm/Lease Name: J. WHITMORE 7
License Status: ACTIVE
Spud Date:
Permit Date:
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.415310
Longitude: -80.203427

For data sources see[1][2][3]

Well History

Date Event
1901-01-01 Drilling Completion
1987-01-01 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2000 NEW CENTURY ENERGY INC 0.00 0 459.58 365 0.00 0
2001 NEW CENTURY ENERGY INC 0.00 0 415 365 0.00 0
2004 NEW CENTURY ENERGY INC 0.00 0 102.17 365 0.00 0
2005 NEW CENTURY ENERGY INC 0.00 0 349 365 0.00 0
2006 NEW CENTURY ENERGY INC 0.00 0 347.00 365 0.00 0
2007 NEW CENTURY ENERGY INC 0.00 0 502.00 208 0.00 0
2008 NEW CENTURY ENERGY INC 0.00 0 559.00 224 0.00 0
2009 NEW CENTURY ENERGY INC 0.00 0 456.00 4 0.00 0
2010 NEW CENTURY ENERGY INC 0.00 0 390.00 156 0.00 0
2011 NEW CENTURY ENERGY INC 0.00 0 486.00 156 0.00 0
2012 NEW CENTURY ENERGY INC 0.00 0 405.00 156 0.00 0
2013 NEW CENTURY ENERGY INC 0.00 0 251.00 4 0.00 0
2014 NEW CENTURY ENERGY INC 0.00 0 238.00 156 0.00 0
2015 NEW CENTURY ENERGY INC 0.00 0 347.00 208 0.00 0
2016 NEW CENTURY ENERGY INC 0.00 0 425.00 208 0.00 0
2017 NEW CENTURY ENERGY INC 0.00 0 44.00 208 0.00 0
2018 NEW CENTURY ENERGY INC 0.00 0 79.31 208 0.00 0
2019 NEW CENTURY ENERGY INC 0.00 0 377.00 208 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2004 NEW CENTURY ENERGY INC Brine 1,177.00 Bbl Treated On-Site, NPDES Discharge P2-0116
2005 NEW CENTURY ENERGY INC Brine 1,546.00 Bbl Municipal Sewage Treatment Plant P20116
2006 NEW CENTURY ENERGY INC Brine 1,886.00 Bbl Municipal Sewage Treatment Plant
2008 NEW CENTURY ENERGY INC Brine 2,471.00 Bbl Municipal Sewage Treatment Plant PF 251979
2009 NEW CENTURY ENERGY INC Brine 2,150.00 Bbl Municipal Sewage Treatment Plant PF 251979
2011 NEW CENTURY ENERGY INC Produced Fluid 2,067.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE P2-0116
2012 NEW CENTURY ENERGY INC Produced Fluid 1,867.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0025984
2013 NEW CENTURY ENERGY INC Produced Fluid 1,838.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0025984
2014 NEW CENTURY ENERGY INC Produced Fluid 985.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0025984
2015 NEW CENTURY ENERGY INC Produced Fluid 1,310.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0025984
2016 NEW CENTURY ENERGY INC Produced Fluid 1,539.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0025984
2017 NEW CENTURY ENERGY INC Produced Fluid 156.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0025984
2018 NEW CENTURY ENERGY INC Produced Fluid 205.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0025984
2019 NEW CENTURY ENERGY INC Produced Fluid 1,160.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0025984

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
208765 Primary Facility 1987-10-30 Routine/Complete Inspection No Violations Noted
984942 Primary Facility 2000-11-29 Routine/Complete Inspection No Violations Noted Accessed past Boonstra residence off Whittengale Rd. - Active, serviced well.

For data sources see[7]

References