X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-21453"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-21453
 
| Well ID: 37-003-21453
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.621324, -79.722145 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.621324, -79.722145 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: HEIGHTS PLAZA 1
 
| Farm/Lease Name: HEIGHTS PLAZA 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 03/11/2000
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 2/25/2000
+
| Permit Date: 2000-02-25
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.621324
 
| Latitude: 40.621324
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2000-02-25
 +
| New Permit Application
 +
|-
 +
| 2000-03-11
 +
| Performed Spud Operation
 +
|-
 +
| 2000-03-15
 +
| Drilling Completion
 +
|-
 +
| 2000-03-21
 +
| Perforation
 +
|-
 +
| 2001-01-26
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 62: Line 128:
 
| 2000
 
| 2000
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 3,458.00
+
| style="text-align: right;" | 3458
 
| style="text-align: right;" | 174
 
| style="text-align: right;" | 174
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 4,170.00
+
| style="text-align: right;" | 4170
 
| style="text-align: right;" | 361
 
| style="text-align: right;" | 361
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 3,665.00
+
| style="text-align: right;" | 3665
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 3,439.00
+
| style="text-align: right;" | 3439
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
| [[EDWARD G KRIEBEL GAS CO]]
+
| style="text-align: right;" |
| style="text-align: right;" | 3,146.00
+
| style="text-align: right;" | 3146
 
| style="text-align: right;" | 362
 
| style="text-align: right;" | 362
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 3,188.00
+
| style="text-align: right;" | 3188
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 3,102.00
+
| style="text-align: right;" | 3102.00
 
| style="text-align: right;" | 347
 
| style="text-align: right;" | 347
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 2,458.00
+
| style="text-align: right;" | 2458.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 2,650.00
+
| style="text-align: right;" | 2650.00
 
| style="text-align: right;" | 349
 
| style="text-align: right;" | 349
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 1,583.00
+
| style="text-align: right;" | 1583.00
 
| style="text-align: right;" | 301
 
| style="text-align: right;" | 301
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 155: Line 221:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 164: Line 230:
 
| style="text-align: right;" | 303
 
| style="text-align: right;" | 303
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 173: Line 239:
 
| style="text-align: right;" | 211
 
| style="text-align: right;" | 211
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 182: Line 248:
 
| style="text-align: right;" | 329
 
| style="text-align: right;" | 329
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 191: Line 257:
 
| style="text-align: right;" | 321
 
| style="text-align: right;" | 321
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 200: Line 266:
 
| style="text-align: right;" | 288
 
| style="text-align: right;" | 288
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 209: Line 275:
 
| style="text-align: right;" | 325
 
| style="text-align: right;" | 325
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 218: Line 284:
 
| style="text-align: right;" | 325
 
| style="text-align: right;" | 325
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 227: Line 293:
 
| style="text-align: right;" | 333
 
| style="text-align: right;" | 333
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[KRIEBEL WELLS DISSOLUTION CO LLC]]
 +
| style="text-align: right;" | 4,421.00
 +
| style="text-align: right;" | 329
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 241: Line 316:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 246: Line 322:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2009-0
+
| 2009
 +
| [[KRIEBEL MINERALS INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 5.00 Bbl
 
| style="text-align: right;" | 5.00 Bbl
Line 252: Line 329:
 
| PA0095443
 
| PA0095443
 
|-
 
|-
| 2016-0
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 50.00 Bbl
 
| style="text-align: right;" | 50.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095273
 +
|-
 +
| 2016
 +
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 50 Bbl
 +
| CENT WASTE TRT FAC NPDES
 
| PA0095273
 
| PA0095273
 
|-
 
|-
Line 277: Line 362:
 
| 1810067
 
| 1810067
 
| Primary Facility
 
| Primary Facility
| 06/26/2009
+
| 2009-06-26
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 284: Line 369:
 
| 930155
 
| 930155
 
| Primary Facility
 
| Primary Facility
| 03/15/2000
+
| 2000-03-15
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 291: Line 376:
 
| 952564
 
| 952564
 
| Primary Facility
 
| Primary Facility
| 07/20/2000
+
| 2000-07-20
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 326: Line 411:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 11:34, 20 May 2020

Well Details

Well ID: 37-003-21453
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Harrison Township
Operator Name: KRIEBEL WELLS DISSOLUTION CO LLC
Well Pad ID:
Farm/Lease Name: HEIGHTS PLAZA 1
License Status: ACTIVE
Spud Date:
Permit Date: 2000-02-25
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.621324
Longitude: -79.722145

For data sources see[1][2][3]

Well History

Date Event
2000-02-25 New Permit Application
2000-03-11 Performed Spud Operation
2000-03-15 Drilling Completion
2000-03-21 Perforation
2001-01-26 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2000 KRIEBEL MINERALS INC 3458 174 0.00 0 0.00 0
2001 KRIEBEL MINERALS INC 4170 361 0.00 0 0.00 0
2002 KRIEBEL MINERALS INC 3665 365 0.00 0 0.00 0
2003 KRIEBEL MINERALS INC 3439 364 0.00 0 0.00 0
2004 3146 362 0.00 0 0.00 0
2005 KRIEBEL MINERALS INC 3188 365 0.00 0 0.00 0
2006 KRIEBEL MINERALS INC 3102.00 347 0.00 0 0.00 0
2007 KRIEBEL MINERALS INC 2458.00 365 0.00 0 0.00 0
2008 KRIEBEL MINERALS INC 2650.00 349 0.00 0 0.00 0
2009 KRIEBEL MINERALS INC 1583.00 301 0.00 0 0.00 0
2010 KRIEBEL MINERALS INC 2,214.00 365 0.00 0 0.00 0
2011 KRIEBEL MINERALS INC 1,328.00 303 0.00 0 0.00 0
2012 KRIEBEL MINERALS INC 1,252.00 211 0.00 0 0.00 0
2013 KRIEBEL MINERALS INC 2,241.00 329 0.00 0 0.00 0
2014 KRIEBEL MINERALS INC 3,116.00 321 0.00 0 0.00 0
2015 KRIEBEL MINERALS INC 1,717.00 288 0.00 0 0.00 0
2016 KRIEBEL MINERALS INC 4,740.00 325 0.00 0 0.00 0
2017 KRIEBEL WELLS DISSOLUTION CO LLC 5,565.00 325 0.00 0 0.00 0
2018 KRIEBEL WELLS DISSOLUTION CO LLC 4,968.00 333 0.00 0 0.00 0
2019 KRIEBEL WELLS DISSOLUTION CO LLC 4,421.00 329 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 KRIEBEL MINERALS INC Brine 5.00 Bbl Brine or Industrial Waste Treatment Plt PA0095443
2016 KRIEBEL MINERALS INC Produced Fluid 50.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2016 KRIEBEL MINERALS INC Produced Fluid 50 Bbl CENT WASTE TRT FAC NPDES PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1810067 Primary Facility 2009-06-26 Routine/Complete Inspection No Violations Noted Drilling was completed on 3/15/2000
930155 Primary Facility 2000-03-15 Routine/Complete Inspection No Violations Noted move off location
952564 Primary Facility 2000-07-20 Site Restoration No Violations Noted Well is along high bank of materials yard behind Heights Plaza. Wall side slope is grassed and holding and equipment below is in synchronization for production. Tagged ok. Rail protects wellhead from parked cars . E & S is adequate. Tank containment.

For data sources see[7]

References