X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-21979"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-21979
 
| Well ID: 37-003-21979
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.568024, -79.83689 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.568024, -79.836890 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Allegheny County, Pennsylvania|Allegheny]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Indiana Township, Allegheny County, Pennsylvania|Indiana Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Allegheny_County,_Pennsylvania|Allegheny]]
 +
|-
 +
| Municipality: [[Indiana Township,_Allegheny_County,_Pennsylvania|Indiana Township]]
 
|-
 
|-
 
| Operator Name: [[MARCO DRILLING INC]]
 
| Operator Name: [[MARCO DRILLING INC]]
Line 15: Line 19:
 
| Farm/Lease Name: JOSEPHINE TUCHE ET VIR 3
 
| Farm/Lease Name: JOSEPHINE TUCHE ET VIR 3
 
|-
 
|-
| First Permit Date: 2008-09-11
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2008-09-11
+
| Spud Date:  
 
|-
 
|-
| Spud Date: 2009-01-27
+
| Permit Date: 2008-09-11
 
|-
 
|-
| Unconventional: No
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: No
+
| Unconventional Well: N
 
|-
 
|-
| Well Status: ACTIVE
+
| Configuration: Vertical Well
 
|-
 
|-
| Violations: 1
+
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.568024
 
| Latitude: 40.568024
 
|-
 
|-
| Longitude: -79.83689
+
| Longitude: -79.836890
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2008-09-11
 +
| New Permit Application
 +
|-
 +
| 2009-01-27
 +
| Performed Spud Operation
 +
|-
 +
| 2009-02-05
 +
| Drilling Completion
 +
|-
 +
| 2009-02-19
 +
| Perforation
 +
|-
 +
| 2013-10-20
 +
| NEWLY DRILLED
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2010-0
+
| 2010
| style="text-align:right;" | 3749.27
+
| [[MARCO DRILLING INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 3,749.27
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 836.67
| style="text-align:right;" | 836.67
+
| style="text-align: right;" | 150
| style="text-align:right;" | 150.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2011
 +
| [[MARCO DRILLING INC]]
 +
| style="text-align: right;" | 3,830.64
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 777.48
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-0
+
| 2012
| style="text-align:right;" | 3830.64
+
| [[MARCO DRILLING INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 3,954.55
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 704.63
| style="text-align:right;" | 777.48
+
| style="text-align: right;" | 365
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2013
 +
| [[MARCO DRILLING INC]]
 +
| style="text-align: right;" | 4,394.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 234.13
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-0
+
| 2014
| style="text-align:right;" | 3954.55
+
| [[MARCO DRILLING INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 3,342.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 421.57
| style="text-align:right;" | 704.63
+
| style="text-align: right;" | 365
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2015
 +
| [[MARCO DRILLING INC]]
 +
| style="text-align: right;" | 2,902.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 265.44
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-0
+
| 2016
| style="text-align:right;" | 4394.0
+
| [[MARCO DRILLING INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 2,974.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 125.87
| style="text-align:right;" | 234.13
+
| style="text-align: right;" | 365
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2017
 +
| [[MARCO DRILLING INC]]
 +
| style="text-align: right;" | 2,519.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 83.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2014-0
+
| 2018
| style="text-align:right;" | 3342.0
+
| [[MARCO DRILLING INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 2,697.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 88.00
| style="text-align:right;" | 421.57
+
| style="text-align: right;" | 365
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== Waste Data ==
+
<!--== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
+
|-
!scope="col" | FACILITY CITY
+
|}-->
!scope="col" | FACILITY STATE
+
 
|}
 
For data sources see<ref>{{cite web
 
| title = Oil and Gas Historical Waste Report
 
| publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2015-05-26
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 
| accessdate = 2015-05-26 }}</ref>
 
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 1838125
 
| 1838125
 +
| Primary Facility
 
| 2009-10-23
 
| 2009-10-23
 +
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
 
| The Department conducted a compliance evaluation inspection for the violations noted on 8/4/09. (Operator failed to maintain E&S controls leading to sedimentation being carried off site and around controls.  The silt fences on the sides of the access road are overwhelmed with sediment and are not implemented correctly.) All E&S violations noted above have been abated and the operator is in compliance.  The site also has been seeded and mulched.
 
| The Department conducted a compliance evaluation inspection for the violations noted on 8/4/09. (Operator failed to maintain E&S controls leading to sedimentation being carried off site and around controls.  The silt fences on the sides of the access road are overwhelmed with sediment and are not implemented correctly.) All E&S violations noted above have been abated and the operator is in compliance.  The site also has been seeded and mulched.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1838139
 
| 1838139
 +
| Primary Facility
 
| 2009-08-04
 
| 2009-08-04
 +
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
 
| Drilling was completed on 2/5/2009
 
| Drilling was completed on 2/5/2009
Well appears to be in production at this time.
 
Site is not restored and vegetation has not achieved 70 % uniform coverage but the site is under 9 months.
 
The access road is in good condition.  Operator failed to maintain E&S controls leading to sedimentation being carried off site and around controls.
 
 
| 574141
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
|
 
|-
 
 
|-
 
|-
 
| 1850075
 
| 1850075
 +
| Primary Facility
 
| 2009-12-14
 
| 2009-12-14
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| The operator submitted a request for a six month site restoration extension on 11/19/09 due to inclement weather, and a need for service rig work.  The well reached total depth on 2/5/09 and the ID sign and E&S plan was on site.  All E&S controls were installed properly and need to be maintained and inspected after every significant rainfall event.  The following extension has been approved, and the deadline for the site restoration is 5/5/10.  The Department requests that the fill slop be inspected on a regular basis to hinder any accelerated erosion.
 
| The operator submitted a request for a six month site restoration extension on 11/19/09 due to inclement weather, and a need for service rig work.  The well reached total depth on 2/5/09 and the ID sign and E&S plan was on site.  All E&S controls were installed properly and need to be maintained and inspected after every significant rainfall event.  The following extension has been approved, and the deadline for the site restoration is 5/5/10.  The Department requests that the fill slop be inspected on a regular basis to hinder any accelerated erosion.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1998398
 
| 1998398
 +
| Primary Facility
 
| 2011-08-10
 
| 2011-08-10
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| OIL AND GAS WELL WITH JACK AND STEEL TANK.
 
| OIL AND GAS WELL WITH JACK AND STEEL TANK.
THE ANULUS IS OPEN.
+
|-
|  
+
|}
 +
==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
| 1838139
 +
| 574141
 +
| 08/04/2009
 +
| 2009-08-04
 +
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 +
| Environmental Health & Safety
 
|  
 
|  
 +
|-
 +
|}
 +
==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
| 574141
 +
| 251671
 +
| NOV - Notice of Violation
 +
| Comply/Closed
 
|  
 
|  
 +
| 2009-10-23
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =Oil and Gas Compliance Report
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-05-20
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Latest revision as of 12:22, 20 May 2020

Well Details

Well ID: 37-003-21979
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Indiana Township
Operator Name: MARCO DRILLING INC
Well Pad ID:
Farm/Lease Name: JOSEPHINE TUCHE ET VIR 3
License Status:
Spud Date:
Permit Date: 2008-09-11
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.568024
Longitude: -79.836890

For data sources see[1][2][3]

Well History

Date Event
2008-09-11 New Permit Application
2009-01-27 Performed Spud Operation
2009-02-05 Drilling Completion
2009-02-19 Perforation
2013-10-20 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 MARCO DRILLING INC 3,749.27 365 836.67 150 0.00 0
2011 MARCO DRILLING INC 3,830.64 365 777.48 365 0.00 0
2012 MARCO DRILLING INC 3,954.55 365 704.63 365 0.00 0
2013 MARCO DRILLING INC 4,394.00 365 234.13 365 0.00 0
2014 MARCO DRILLING INC 3,342.00 365 421.57 365 0.00 0
2015 MARCO DRILLING INC 2,902.00 365 265.44 365 0.00 0
2016 MARCO DRILLING INC 2,974.00 365 125.87 365 0.00 0
2017 MARCO DRILLING INC 2,519.00 365 83.00 365 0.00 0
2018 MARCO DRILLING INC 2,697.00 365 88.00 365 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1838125 Primary Facility 2009-10-23 Compliance Evaluation No Violations Noted The Department conducted a compliance evaluation inspection for the violations noted on 8/4/09. (Operator failed to maintain E&S controls leading to sedimentation being carried off site and around controls. The silt fences on the sides of the access road are overwhelmed with sediment and are not implemented correctly.) All E&S violations noted above have been abated and the operator is in compliance. The site also has been seeded and mulched.
1838139 Primary Facility 2009-08-04 Routine/Complete Inspection Violation(s) Noted Drilling was completed on 2/5/2009
1850075 Primary Facility 2009-12-14 Routine/Complete Inspection No Violations Noted The operator submitted a request for a six month site restoration extension on 11/19/09 due to inclement weather, and a need for service rig work. The well reached total depth on 2/5/09 and the ID sign and E&S plan was on site. All E&S controls were installed properly and need to be maintained and inspected after every significant rainfall event. The following extension has been approved, and the deadline for the site restoration is 5/5/10. The Department requests that the fill slop be inspected on a regular basis to hinder any accelerated erosion.
1998398 Primary Facility 2011-08-10 Routine/Complete Inspection No Violations Noted OIL AND GAS WELL WITH JACK AND STEEL TANK.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1838139 574141 08/04/2009 2009-08-04 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
574141 251671 NOV - Notice of Violation Comply/Closed 2009-10-23

For data sources see[6]

References