X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-21979"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-21979
 
| Well ID: 37-003-21979
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.568024, -79.836890 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.568024, -79.836890 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: JOSEPHINE TUCHE ET VIR 3
 
| Farm/Lease Name: JOSEPHINE TUCHE ET VIR 3
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2009-01-27
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2008-09-11
 
| Permit Date: 2008-09-11
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.568024
 
| Latitude: 40.568024
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2008-09-11
 +
| New Permit Application
 +
|-
 +
| 2009-01-27
 +
| Performed Spud Operation
 +
|-
 +
| 2009-02-05
 +
| Drilling Completion
 +
|-
 +
| 2009-02-19
 +
| Perforation
 +
|-
 +
| 2013-10-20
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 223: Line 264:
 
|-
 
|-
 
|}
 
|}
<!--==== Violations Commited ====
+
==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Inspection ID
Line 233: Line 274:
 
!scope="col" | Violation Comments
 
!scope="col" | Violation Comments
 
|-
 
|-
|}-->
+
| 1838139
<!--==== Penalties Applied ====
+
| 574141
 +
| 08/04/2009
 +
| 2009-08-04
 +
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 +
| Environmental Health & Safety
 +
|
 +
|-
 +
|}
 +
==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Violation ID
 
!scope="col" | Violation ID
Line 245: Line 294:
 
!scope="col" | Amount Collected
 
!scope="col" | Amount Collected
 
|-
 
|-
|}-->
+
| 574141
 +
| 251671
 +
| NOV - Notice of Violation
 +
| Comply/Closed
 +
|
 +
| 2009-10-23
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title =Oil and Gas Compliance Report
 
  | title =Oil and Gas Compliance Report

Latest revision as of 12:22, 20 May 2020

Well Details

Well ID: 37-003-21979
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Indiana Township
Operator Name: MARCO DRILLING INC
Well Pad ID:
Farm/Lease Name: JOSEPHINE TUCHE ET VIR 3
License Status:
Spud Date:
Permit Date: 2008-09-11
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.568024
Longitude: -79.836890

For data sources see[1][2][3]

Well History

Date Event
2008-09-11 New Permit Application
2009-01-27 Performed Spud Operation
2009-02-05 Drilling Completion
2009-02-19 Perforation
2013-10-20 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 MARCO DRILLING INC 3,749.27 365 836.67 150 0.00 0
2011 MARCO DRILLING INC 3,830.64 365 777.48 365 0.00 0
2012 MARCO DRILLING INC 3,954.55 365 704.63 365 0.00 0
2013 MARCO DRILLING INC 4,394.00 365 234.13 365 0.00 0
2014 MARCO DRILLING INC 3,342.00 365 421.57 365 0.00 0
2015 MARCO DRILLING INC 2,902.00 365 265.44 365 0.00 0
2016 MARCO DRILLING INC 2,974.00 365 125.87 365 0.00 0
2017 MARCO DRILLING INC 2,519.00 365 83.00 365 0.00 0
2018 MARCO DRILLING INC 2,697.00 365 88.00 365 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1838125 Primary Facility 2009-10-23 Compliance Evaluation No Violations Noted The Department conducted a compliance evaluation inspection for the violations noted on 8/4/09. (Operator failed to maintain E&S controls leading to sedimentation being carried off site and around controls. The silt fences on the sides of the access road are overwhelmed with sediment and are not implemented correctly.) All E&S violations noted above have been abated and the operator is in compliance. The site also has been seeded and mulched.
1838139 Primary Facility 2009-08-04 Routine/Complete Inspection Violation(s) Noted Drilling was completed on 2/5/2009
1850075 Primary Facility 2009-12-14 Routine/Complete Inspection No Violations Noted The operator submitted a request for a six month site restoration extension on 11/19/09 due to inclement weather, and a need for service rig work. The well reached total depth on 2/5/09 and the ID sign and E&S plan was on site. All E&S controls were installed properly and need to be maintained and inspected after every significant rainfall event. The following extension has been approved, and the deadline for the site restoration is 5/5/10. The Department requests that the fill slop be inspected on a regular basis to hinder any accelerated erosion.
1998398 Primary Facility 2011-08-10 Routine/Complete Inspection No Violations Noted OIL AND GAS WELL WITH JACK AND STEEL TANK.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1838139 574141 08/04/2009 2009-08-04 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
574141 251671 NOV - Notice of Violation Comply/Closed 2009-10-23

For data sources see[6]

References