If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-003-21979 | | Well ID: 37-003-21979 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.568024, -79.836890 | width=100% | height=100% }} |
+ | |- | ||
+ | | Country: United States | ||
+ | |- | ||
+ | | State: Pennsylvania | ||
+ | |- | ||
+ | | County: [[Allegheny_County,_Pennsylvania|Allegheny]] | ||
+ | |- | ||
+ | | Municipality: [[Indiana Township,_Allegheny_County,_Pennsylvania|Indiana Township]] | ||
|- | |- | ||
| Operator Name: [[MARCO DRILLING INC]] | | Operator Name: [[MARCO DRILLING INC]] | ||
|- | |- | ||
− | | | + | | Well Pad ID: |
|- | |- | ||
− | | | + | | Farm/Lease Name: JOSEPHINE TUCHE ET VIR 3 |
|- | |- | ||
− | | | + | | License Status: |
|- | |- | ||
− | | | + | | Spud Date: |
|- | |- | ||
− | | | + | | Permit Date: 2008-09-11 |
|- | |- | ||
− | | | + | | Well Type: GAS |
+ | |- | ||
+ | | Unconventional Well: N | ||
+ | |- | ||
+ | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 40.568024 | | Latitude: 40.568024 | ||
|- | |- | ||
− | | Longitude: -79. | + | | Longitude: -79.836890 |
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2008-09-11 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2009-01-27 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2009-02-05 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2009-02-19 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2013-10-20 | ||
+ | | NEWLY DRILLED | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator Name |
− | !scope="col" | | + | !scope="col" | Gas Quantity (mcf) |
− | !scope="col" | | + | !scope="col" | Gas Production Days |
− | !scope="col" | | + | !scope="col" | Oil Quantity (bbl) |
− | !scope="col" | | + | !scope="col" | Oil Production Days |
− | !scope="col" | | + | !scope="col" | Water Quantity (bbl) |
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[MARCO DRILLING INC]] | ||
+ | | style="text-align: right;" | 3,749.27 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 836.67 | ||
+ | | style="text-align: right;" | 150 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2011 |
− | | style="text-align:right;" | | + | | [[MARCO DRILLING INC]] |
− | | style="text-align:right;" | 365 | + | | style="text-align: right;" | 3,830.64 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 777.48 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2012 | ||
+ | | [[MARCO DRILLING INC]] | ||
+ | | style="text-align: right;" | 3,954.55 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 704.63 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2013 |
− | | style="text-align:right;" | | + | | [[MARCO DRILLING INC]] |
− | | style="text-align:right;" | 365 | + | | style="text-align: right;" | 4,394.00 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 234.13 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2014 | ||
+ | | [[MARCO DRILLING INC]] | ||
+ | | style="text-align: right;" | 3,342.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 421.57 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2015 |
− | | style="text-align:right;" | | + | | [[MARCO DRILLING INC]] |
− | | style="text-align:right;" | 365 | + | | style="text-align: right;" | 2,902.00 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 265.44 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2016 | ||
+ | | [[MARCO DRILLING INC]] | ||
+ | | style="text-align: right;" | 2,974.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 125.87 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2017 |
− | | style="text-align:right;" | | + | | [[MARCO DRILLING INC]] |
− | | style="text-align:right;" | 365 | + | | style="text-align: right;" | 2,519.00 |
− | | style="text-align:right;" | 0.0 | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 83.00 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[MARCO DRILLING INC]] | ||
+ | | style="text-align: right;" | 2,697.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 88.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
|} | |} | ||
− | == Waste Data == | + | For data sources see<ref>{{cite web |
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator |
− | !scope="col" | | + | !scope="col" | Waste Type |
− | !scope="col" | | + | !scope="col" | Quantity |
− | !scope="col" | | + | !scope="col" | Disposal Method |
− | !scope="col" | | + | !scope="col" | Waste Facility ID |
− | + | |- | |
− | + | |}--> | |
− | + | ||
− | |||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
+ | !scope="col" | Inspection Comments | ||
|- | |- | ||
| 1838125 | | 1838125 | ||
+ | | Primary Facility | ||
| 2009-10-23 | | 2009-10-23 | ||
+ | | Compliance Evaluation | ||
| No Violations Noted | | No Violations Noted | ||
| The Department conducted a compliance evaluation inspection for the violations noted on 8/4/09. (Operator failed to maintain E&S controls leading to sedimentation being carried off site and around controls. The silt fences on the sides of the access road are overwhelmed with sediment and are not implemented correctly.) All E&S violations noted above have been abated and the operator is in compliance. The site also has been seeded and mulched. | | The Department conducted a compliance evaluation inspection for the violations noted on 8/4/09. (Operator failed to maintain E&S controls leading to sedimentation being carried off site and around controls. The silt fences on the sides of the access road are overwhelmed with sediment and are not implemented correctly.) All E&S violations noted above have been abated and the operator is in compliance. The site also has been seeded and mulched. | ||
− | |||
− | |||
|- | |- | ||
| 1838139 | | 1838139 | ||
+ | | Primary Facility | ||
| 2009-08-04 | | 2009-08-04 | ||
+ | | Routine/Complete Inspection | ||
| Violation(s) Noted | | Violation(s) Noted | ||
| Drilling was completed on 2/5/2009 | | Drilling was completed on 2/5/2009 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1850075 | | 1850075 | ||
+ | | Primary Facility | ||
| 2009-12-14 | | 2009-12-14 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| The operator submitted a request for a six month site restoration extension on 11/19/09 due to inclement weather, and a need for service rig work. The well reached total depth on 2/5/09 and the ID sign and E&S plan was on site. All E&S controls were installed properly and need to be maintained and inspected after every significant rainfall event. The following extension has been approved, and the deadline for the site restoration is 5/5/10. The Department requests that the fill slop be inspected on a regular basis to hinder any accelerated erosion. | | The operator submitted a request for a six month site restoration extension on 11/19/09 due to inclement weather, and a need for service rig work. The well reached total depth on 2/5/09 and the ID sign and E&S plan was on site. All E&S controls were installed properly and need to be maintained and inspected after every significant rainfall event. The following extension has been approved, and the deadline for the site restoration is 5/5/10. The Department requests that the fill slop be inspected on a regular basis to hinder any accelerated erosion. | ||
− | |||
− | |||
|- | |- | ||
| 1998398 | | 1998398 | ||
+ | | Primary Facility | ||
| 2011-08-10 | | 2011-08-10 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| OIL AND GAS WELL WITH JACK AND STEEL TANK. | | OIL AND GAS WELL WITH JACK AND STEEL TANK. | ||
− | + | |- | |
+ | |} | ||
+ | ==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Violation Date | ||
+ | !scope="col" | Date Resolved | ||
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
+ | |- | ||
+ | | 1838139 | ||
+ | | 574141 | ||
+ | | 08/04/2009 | ||
+ | | 2009-08-04 | ||
+ | | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | ||
+ | | Environmental Health & Safety | ||
+ | | | ||
+ | |- | ||
+ | |} | ||
+ | ==== Penalties Applied ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Penalty ID | ||
+ | !scope="col" | Penalty Code | ||
+ | !scope="col" | Penalty Status | ||
+ | !scope="col" | Penalty Date | ||
+ | !scope="col" | Enforcement Date | ||
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
+ | |- | ||
+ | | 574141 | ||
+ | | 251671 | ||
+ | | NOV - Notice of Violation | ||
+ | | Comply/Closed | ||
| | | | ||
+ | | 2009-10-23 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Compliance Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Pennsylvania Wells]] |
Well ID: 37-003-21979 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.568024,"lon":-79.83689,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Indiana Township | |
Operator Name: MARCO DRILLING INC | |
Well Pad ID: | |
Farm/Lease Name: JOSEPHINE TUCHE ET VIR 3 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-09-11 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.568024 | |
Longitude: -79.836890 |
Date | Event |
---|---|
2008-09-11 | New Permit Application |
2009-01-27 | Performed Spud Operation |
2009-02-05 | Drilling Completion |
2009-02-19 | Perforation |
2013-10-20 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | MARCO DRILLING INC | 3,749.27 | 365 | 836.67 | 150 | 0.00 | 0 |
2011 | MARCO DRILLING INC | 3,830.64 | 365 | 777.48 | 365 | 0.00 | 0 |
2012 | MARCO DRILLING INC | 3,954.55 | 365 | 704.63 | 365 | 0.00 | 0 |
2013 | MARCO DRILLING INC | 4,394.00 | 365 | 234.13 | 365 | 0.00 | 0 |
2014 | MARCO DRILLING INC | 3,342.00 | 365 | 421.57 | 365 | 0.00 | 0 |
2015 | MARCO DRILLING INC | 2,902.00 | 365 | 265.44 | 365 | 0.00 | 0 |
2016 | MARCO DRILLING INC | 2,974.00 | 365 | 125.87 | 365 | 0.00 | 0 |
2017 | MARCO DRILLING INC | 2,519.00 | 365 | 83.00 | 365 | 0.00 | 0 |
2018 | MARCO DRILLING INC | 2,697.00 | 365 | 88.00 | 365 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1838125 | Primary Facility | 2009-10-23 | Compliance Evaluation | No Violations Noted | The Department conducted a compliance evaluation inspection for the violations noted on 8/4/09. (Operator failed to maintain E&S controls leading to sedimentation being carried off site and around controls. The silt fences on the sides of the access road are overwhelmed with sediment and are not implemented correctly.) All E&S violations noted above have been abated and the operator is in compliance. The site also has been seeded and mulched. |
1838139 | Primary Facility | 2009-08-04 | Routine/Complete Inspection | Violation(s) Noted | Drilling was completed on 2/5/2009 |
1850075 | Primary Facility | 2009-12-14 | Routine/Complete Inspection | No Violations Noted | The operator submitted a request for a six month site restoration extension on 11/19/09 due to inclement weather, and a need for service rig work. The well reached total depth on 2/5/09 and the ID sign and E&S plan was on site. All E&S controls were installed properly and need to be maintained and inspected after every significant rainfall event. The following extension has been approved, and the deadline for the site restoration is 5/5/10. The Department requests that the fill slop be inspected on a regular basis to hinder any accelerated erosion. |
1998398 | Primary Facility | 2011-08-10 | Routine/Complete Inspection | No Violations Noted | OIL AND GAS WELL WITH JACK AND STEEL TANK. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1838139 | 574141 | 08/04/2009 | 2009-08-04 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
574141 | 251671 | NOV - Notice of Violation | Comply/Closed | 2009-10-23 |
For data sources see[6]