X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-22171"

m
 
m
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-22171
 
| Well ID: 37-003-22171
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.547372, -80.111608 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.547372, -80.111608 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Allegheny_County,_Pennsylvania|Allegheny]]
 +
|-
 +
| Municipality: [[Ohio Township,_Allegheny_County,_Pennsylvania|Ohio Township]]
 
|-
 
|-
 
| Operator Name: [[AMER NATURAL RESOURCES LLC]]
 
| Operator Name: [[AMER NATURAL RESOURCES LLC]]
 
|-
 
|-
| First Permit Date: 2011-03-14
+
| Well Pad ID:  
 
|-
 
|-
| Last Permit Date: 2011-03-14
+
| Farm/Lease Name: GROVE/GRAMBO UNIT 1
 
|-
 
|-
| Spud Date: 2011-05-20
+
| License Status:  
 
|-
 
|-
| Unconventional: No
+
| Spud Date:  
 
|-
 
|-
| Horizontal: No
+
| Permit Date: 2011-03-14
 
|-
 
|-
| Violations: None
+
| Well Type: OIL
 +
|-
 +
| Unconventional Well: N
 +
|-
 +
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.547372
 
| Latitude: 40.547372
 
|-
 
|-
 
| Longitude: -80.111608
 
| Longitude: -80.111608
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-03-14
 +
| New Permit Application
 +
|-
 +
| 2011-05-20
 +
| Performed Spud Operation
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2013-0
+
| 2011
| style="text-align:right;" | 0.0
+
| [[AMER NATURAL RESOURCES LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2012
 +
| [[AMER NATURAL RESOURCES LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-0
+
| 2013
| style="text-align:right;" | 0.0
+
| [[AMER NATURAL RESOURCES LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[AMER NATURAL RESOURCES LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-0
+
| 2015
| style="text-align:right;" | 0.0
+
| [[AMER NATURAL RESOURCES LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[AMER NATURAL RESOURCES LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[AMER NATURAL RESOURCES LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[AMER NATURAL RESOURCES LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-0
+
| 2011
| DRILLING FLUID WASTE
+
| [[AMER NATURAL RESOURCES LLC]]
| style="text-align:right;" | 55.0
+
| Fracing Fluid Waste
| Bbl
+
| style="text-align: right;" | 577.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
 
| JOSEPHINE
 
| PA
 
|-
 
 
|-
 
|-
| 2011-0
+
| 2011
| DRILLING FLUID WASTE
+
| [[AMER NATURAL RESOURCES LLC]]
| style="text-align:right;" | 420.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 110.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
 
| JOSEPHINE
 
| PA
 
|-
 
 
|-
 
|-
| 2011-0
+
| 2011
| FRACING FLUID WASTE
+
| [[AMER NATURAL RESOURCES LLC]]
| style="text-align:right;" | 577.0
+
| Drilling Fluid Waste
| Bbl
+
| style="text-align: right;" | 420.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
 
| JOSEPHINE
 
| PA
 
 
|-
 
|-
|-
+
| 2012
| 2011-0
+
| [[AMER NATURAL RESOURCES LLC]]
| PRODUCED FLUID
+
| Drilling Fluid Waste
| style="text-align:right;" | 110.0
+
| style="text-align: right;" | 55.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
 
| JOSEPHINE
 
| PA
 
|-
 
|-
 
| 2012-0
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 55.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
 
| JOSEPHINE
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 1961885
 
| 1961885
 +
| Primary Facility
 
| 2011-03-24
 
| 2011-03-24
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On March 24th, 2011 I conducted a routine inspection of the above site.  Drilling has not yet started.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  Pit was constructed.  The culverts outlets needed riprapped and some corrections were needed to the silt fence installation.  The operator was contacted.  No spills, leaks, or accelerated erosion were observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
 
| On March 24th, 2011 I conducted a routine inspection of the above site.  Drilling has not yet started.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  Pit was constructed.  The culverts outlets needed riprapped and some corrections were needed to the silt fence installation.  The operator was contacted.  No spills, leaks, or accelerated erosion were observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
|
 
|-
 
 
|-
 
|-
 
| 1976571
 
| 1976571
 +
| Primary Facility
 
| 2011-04-25
 
| 2011-04-25
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| DRILLING PAD IS VERY SMALL. PIT IS ALSO SMALL.
 
| DRILLING PAD IS VERY SMALL. PIT IS ALSO SMALL.
E&S OK.
 
|
 
|-
 
 
|-
 
|-
 
| 1983149
 
| 1983149
 +
| Primary Facility
 
| 2011-05-27
 
| 2011-05-27
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| RUNNING DRILL RODS AFTER 7" CEMENT TIME.
 
| RUNNING DRILL RODS AFTER 7" CEMENT TIME.
|
 
|-
 
 
|-
 
|-
 
| 1983151
 
| 1983151
 +
| Primary Facility
 
| 2011-05-25
 
| 2011-05-25
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| USE 5 DRILLING AT 660'.
 
| USE 5 DRILLING AT 660'.
PIT LEVEL OK.
 
|
 
|-
 
 
|-
 
|-
 
| 1984287
 
| 1984287
 +
| Primary Facility
 
| 2011-05-26
 
| 2011-05-26
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On May 26th, 2011 I conducted a routine inspection of the above site.  Drilling has started.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The pit apeared to be in good condition.  No spills, leaks, or accelerated erosion were observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
 
| On May 26th, 2011 I conducted a routine inspection of the above site.  Drilling has started.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The pit apeared to be in good condition.  No spills, leaks, or accelerated erosion were observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
|
 
|-
 
 
|-
 
|-
 
| 1984523
 
| 1984523
 +
| Primary Facility
 
| 2011-06-01
 
| 2011-06-01
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On June 1st, 2011 I conducted a routine inspection of the above site.  Drilling was completed.  Equipment had moved offsite. A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The pit apeared to be in good condition and was filled mainly with cuttings..  No spills, leaks, or accelerated erosion were observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
 
| On June 1st, 2011 I conducted a routine inspection of the above site.  Drilling was completed.  Equipment had moved offsite. A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The pit apeared to be in good condition and was filled mainly with cuttings..  No spills, leaks, or accelerated erosion were observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
|
 
|-
 
 
|-
 
|-
 
| 1993768
 
| 1993768
 +
| Primary Facility
 
| 2011-07-21
 
| 2011-07-21
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| NO ACTIVITY AT THIS SITE SINCE MAY 2011. PITS ARE OPEN.
 
| NO ACTIVITY AT THIS SITE SINCE MAY 2011. PITS ARE OPEN.
|
 
|-
 
 
|-
 
|-
 
| 2022421
 
| 2022421
 +
| Primary Facility
 
| 2011-11-18
 
| 2011-11-18
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Checked unit.  Some E&S issues.
 
| Checked unit.  Some E&S issues.
|
 
|-
 
 
|-
 
|-
 
| 2028130
 
| 2028130
 +
| Primary Facility
 
| 2011-12-08
 
| 2011-12-08
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| A crew from American Natural Resources was beginning to work on the site at inspection so that limited what I could look at.  I did remind the crew that the entrance to the access road did require additional rock.
 
| A crew from American Natural Resources was beginning to work on the site at inspection so that limited what I could look at.  I did remind the crew that the entrance to the access road did require additional rock.
|
 
|-
 
 
|-
 
|-
 
| 2051764
 
| 2051764
 +
| Primary Facility
 
| 2012-03-20
 
| 2012-03-20
 +
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
 
| On December 5, 2012, the Department received a request for a six-month extension for the reclamation of American Natural Resources’ (ANR) Grove/Grambo Unit #1.  The well reached total depth on 5/31/11 and restoration should have been done by 2/31/12.
 
| On December 5, 2012, the Department received a request for a six-month extension for the reclamation of American Natural Resources’ (ANR) Grove/Grambo Unit #1.  The well reached total depth on 5/31/11 and restoration should have been done by 2/31/12.
 
However, ANR was unable to complete the restoration on time because of the extremely wet summer and fall (they included documentation).  I granted the extension and the new restoration date will be 8/31/12.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2052603
 
| 2052603
 +
| Primary Facility
 
| 2012-02-15
 
| 2012-02-15
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| ACCESS HAS NEW STONE. PUMP JACK IS SET, AND STORAGE TANKS ARE IN PLACE.
 
| ACCESS HAS NEW STONE. PUMP JACK IS SET, AND STORAGE TANKS ARE IN PLACE.
|
 
|-
 
 
|-
 
|-
 
| 2143114
 
| 2143114
 +
| Primary Facility
 
| 2013-02-11
 
| 2013-02-11
| Allegheny
+
| Routine/Complete Inspection
| Ohio Twp
 
 
| No Violations Noted
 
| No Violations Noted
|-
+
| WELL COMPLETE AND JACK HOOKED UP. SITE IS OK.
 
|-
 
|-
 
| 2247417
 
| 2247417
 +
| Primary Facility
 
| 2014-01-22
 
| 2014-01-22
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| WELL WAS DRILLED BUT NOT PRODUCED. ANR PLANS TO PLUG.
 
| WELL WAS DRILLED BUT NOT PRODUCED. ANR PLANS TO PLUG.
 +
|-
 +
| 2727981
 +
| Primary Facility
 +
| 2018-05-04
 +
| Routine/Complete Inspection
 +
| Violation(s) Noted
 +
| Well drilled. Well tag present. No accelerated erosion or sedimentation observed in relation the well site or access road. Brine tanks located on site not appear to be equipped for storage. The brine tanks appear to be in sound condition and placed in an earthen berm. The Department recommends the Operator remove the brine tanks. The Department also observed temporary E&S BMP silt sox installed. The Department nots that the site appears to be restored. The Department recommends the a Operator removed the silt sox.
 +
|-
 +
| 2742779
 +
| Primary Facility
 +
| 2018-06-19
 +
| Compliance Evaluation
 +
| No Violations Noted
 +
| Compliance evaluation inspection related to violations issued on 5/4/2018, see inspection 2727981. The well appears to be drilled and equipped for production. The temporary E&S silt fence has been removed. No observation of accelerated erosion or sedimentation.
 +
|-
 +
|}
 +
==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
| 2727981
 +
| 816158
 +
| 2018-05-04
 +
| 2018-06-19
 +
| 102.11(a)1
 +
| Environmental Health & Safety
 +
| Failure to removed temporary E&S BMPs
 +
|-
 +
|}
 +
==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
| 816158
 +
| 364468
 +
| NOV - Notice of Violation
 +
|
 +
|
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 12:40, 20 May 2020

Well Details

Well ID: 37-003-22171
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Ohio Township
Operator Name: AMER NATURAL RESOURCES LLC
Well Pad ID:
Farm/Lease Name: GROVE/GRAMBO UNIT 1
License Status:
Spud Date:
Permit Date: 2011-03-14
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.547372
Longitude: -80.111608

For data sources see[1][2][3]

Well History

Date Event
2011-03-14 New Permit Application
2011-05-20 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 AMER NATURAL RESOURCES LLC 0.00 0 0.00 0 0.00 0
2012 AMER NATURAL RESOURCES LLC 0.00 0 0.00 0 0.00 0
2013 AMER NATURAL RESOURCES LLC 0.00 0 0.00 0 0.00 0
2014 AMER NATURAL RESOURCES LLC 0.00 0 0.00 0 0.00 0
2015 AMER NATURAL RESOURCES LLC 0.00 0 0.00 0 0.00 0
2016 AMER NATURAL RESOURCES LLC 0.00 0 0.00 0 0.00 0
2017 AMER NATURAL RESOURCES LLC 0.00 0 0.00 0 0.00 0
2018 AMER NATURAL RESOURCES LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 AMER NATURAL RESOURCES LLC Fracing Fluid Waste 577.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 AMER NATURAL RESOURCES LLC Produced Fluid 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 AMER NATURAL RESOURCES LLC Drilling Fluid Waste 420.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 AMER NATURAL RESOURCES LLC Drilling Fluid Waste 55.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1961885 Primary Facility 2011-03-24 Routine/Complete Inspection No Violations Noted On March 24th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. Pit was constructed. The culverts outlets needed riprapped and some corrections were needed to the silt fence installation. The operator was contacted. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
1976571 Primary Facility 2011-04-25 Drilling/Alteration No Violations Noted DRILLING PAD IS VERY SMALL. PIT IS ALSO SMALL.
1983149 Primary Facility 2011-05-27 Drilling/Alteration No Violations Noted RUNNING DRILL RODS AFTER 7" CEMENT TIME.
1983151 Primary Facility 2011-05-25 Drilling/Alteration No Violations Noted USE 5 DRILLING AT 660'.
1984287 Primary Facility 2011-05-26 Routine/Complete Inspection No Violations Noted On May 26th, 2011 I conducted a routine inspection of the above site. Drilling has started. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit apeared to be in good condition. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
1984523 Primary Facility 2011-06-01 Routine/Complete Inspection No Violations Noted On June 1st, 2011 I conducted a routine inspection of the above site. Drilling was completed. Equipment had moved offsite. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit apeared to be in good condition and was filled mainly with cuttings.. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
1993768 Primary Facility 2011-07-21 Drilling/Alteration No Violations Noted NO ACTIVITY AT THIS SITE SINCE MAY 2011. PITS ARE OPEN.
2022421 Primary Facility 2011-11-18 Routine/Complete Inspection No Violations Noted Checked unit. Some E&S issues.
2028130 Primary Facility 2011-12-08 Routine/Complete Inspection No Violations Noted A crew from American Natural Resources was beginning to work on the site at inspection so that limited what I could look at. I did remind the crew that the entrance to the access road did require additional rock.
2051764 Primary Facility 2012-03-20 Administrative/File Review No Violations Noted On December 5, 2012, the Department received a request for a six-month extension for the reclamation of American Natural Resources’ (ANR) Grove/Grambo Unit #1. The well reached total depth on 5/31/11 and restoration should have been done by 2/31/12.
2052603 Primary Facility 2012-02-15 Drilling/Alteration No Violations Noted ACCESS HAS NEW STONE. PUMP JACK IS SET, AND STORAGE TANKS ARE IN PLACE.
2143114 Primary Facility 2013-02-11 Routine/Complete Inspection No Violations Noted WELL COMPLETE AND JACK HOOKED UP. SITE IS OK.
2247417 Primary Facility 2014-01-22 Routine/Complete Inspection No Violations Noted WELL WAS DRILLED BUT NOT PRODUCED. ANR PLANS TO PLUG.
2727981 Primary Facility 2018-05-04 Routine/Complete Inspection Violation(s) Noted Well drilled. Well tag present. No accelerated erosion or sedimentation observed in relation the well site or access road. Brine tanks located on site not appear to be equipped for storage. The brine tanks appear to be in sound condition and placed in an earthen berm. The Department recommends the Operator remove the brine tanks. The Department also observed temporary E&S BMP silt sox installed. The Department nots that the site appears to be restored. The Department recommends the a Operator removed the silt sox.
2742779 Primary Facility 2018-06-19 Compliance Evaluation No Violations Noted Compliance evaluation inspection related to violations issued on 5/4/2018, see inspection 2727981. The well appears to be drilled and equipped for production. The temporary E&S silt fence has been removed. No observation of accelerated erosion or sedimentation.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2727981 816158 2018-05-04 2018-06-19 102.11(a)1 Environmental Health & Safety Failure to removed temporary E&S BMPs

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
816158 364468 NOV - Notice of Violation

For data sources see[7]

References