X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-22222"

m
m
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
| Well ID: 42-003-22222
+
| Well ID: 37-003-22222
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.61608, -79.786541 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.616081, -79.786542 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 
|-
 
|-
| County: [[Allegheny County, Pennsylvania|Allegheny]]
+
| County: [[Allegheny_County,_Pennsylvania|Allegheny]]
 
|-
 
|-
| Municipality: [[Frazer Township, Allegheny County, Pennsylvania|Frazer Township]]
+
| Municipality: [[Frazer Township,_Allegheny_County,_Pennsylvania|Frazer Township]]
 
|-
 
|-
| Operator Name: [[RANGE RESOURCES APPALACHIA LLC|RANGE RESOURCES APPALACHIA LLC]]
+
| Operator Name: [[RANGE RESOURCES APPALACHIA LLC]]
 +
|-
 +
| Well Pad ID: [[149247]]
 
|-
 
|-
 
| Farm/Lease Name: SCHILLER GERALD UNIT 1H
 
| Farm/Lease Name: SCHILLER GERALD UNIT 1H
 
|-
 
|-
| First Permit Date: 2012-05-04
+
| License Status:
 +
|-
 +
| Spud Date:
 +
|-
 +
| Permit Date: 2012-05-04
 +
|-
 +
| Well Type: GAS
 +
|-
 +
| Unconventional Well: Y
 +
|-
 +
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: Yes
 +
|-
 +
| Latitude: 40.616081
 +
|-
 +
| Longitude: -79.786542
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2012-05-04
 +
| New Permit Application
 +
|-
 +
| 2012-07-01
 +
| Performed Spud Operation
 +
|-
 +
| 2012-12-20
 +
| Drilling Completion
 +
|-
 +
| 2013-03-02
 +
| Perforation
 +
|-
 +
| 2013-06-25
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2013-02-23
 +
| 2013-03-03
 +
| style="text-align: right;" | 6,702
 +
| style="text-align: right;" | 4,816,640
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="9"| 1
 +
| rowspan="1"| 37% HCL
 +
| rowspan="1"| FracTech
 +
| rowspan="1"| Cleans Perforation
 +
| HCL
 +
| 7647-01-0
 +
| style="text-align: right;" | 37
 +
| style="text-align: right;" | 0.02575
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="4"| MC B-8520
 +
| rowspan="4"| Multichem
 +
| rowspan="4"| Antibacterial Agent
 +
| 3,4,4-Trimethyloxazolodine
 +
| 75673-43-7
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00091
 +
| style="text-align: right;" | 0
 +
|-
 +
| Formaldehyde Amine
 +
| 56652-26-7
 +
| style="text-align: right;" | 0.5
 +
| style="text-align: right;" | 0.00009000
 +
| style="text-align: right;" | 0
 +
|-
 +
| 4,4-Dimethyloxazolidine
 +
| 51200-87-4
 +
| style="text-align: right;" | 78
 +
| style="text-align: right;" | 0.01418
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2-Amino-2-methyl-1-propanol
 +
| 124-68-5
 +
| style="text-align: right;" | 1
 +
| style="text-align: right;" | 0.00018
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| CI-100
 +
| rowspan="2"| FracTech
 +
| rowspan="2"| Corrosion Inhibitor
 +
| Methanol
 +
| 67-56-1
 +
| style="text-align: right;" | 95
 +
| style="text-align: right;" | 0.00054
 +
| style="text-align: right;" | 0
 +
|-
 +
| Propargyl Alcohol
 +
| 107-19-7
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00003000
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| MC B-8650
 +
| rowspan="2"| Multichem
 +
| rowspan="2"| Antibacterial Agent
 +
| Methanol
 +
| 67-56-1
 +
| style="text-align: right;" | 0.5
 +
| style="text-align: right;" | 0.00004000
 +
| style="text-align: right;" | 0
 +
|-
 +
| Glutaraldehyde
 +
| 111-30-8
 +
| style="text-align: right;" | 50
 +
| style="text-align: right;" | 0.00398
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2012
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| style="text-align: right;" | 1,170,948.18
 +
| style="text-align: right;" | 286
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| style="text-align: right;" | 728,696.60
 +
| style="text-align: right;" | 359
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| style="text-align: right;" | 513,895.32
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| style="text-align: right;" | 385,780.57
 +
| style="text-align: right;" | 360
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| style="text-align: right;" | 274,558.90
 +
| style="text-align: right;" | 356
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| style="text-align: right;" | 247,185.98
 +
| style="text-align: right;" | 291
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| style="text-align: right;" | 223,958.48
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2012
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 122.31 Tons
 +
| LANDFILL
 +
| 100172
 +
|-
 +
| 2012
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 425.05 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2012
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 669.43 Tons
 +
| LANDFILL
 +
| 100434
 +
|-
 +
| 2012
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 205.43 Tons
 +
| LANDFILL
 +
| 100280
 +
|-
 +
| 2013
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 8,758.57 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2013
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 11.18 Tons
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| 101532
 +
|-
 +
| 2013
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 23.81 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2013
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 9,194.95 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2014
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 454.23 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2014
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,350.74 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2014
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 136.44 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0254185
 +
|-
 +
| 2014
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 6.43 Bbl
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| 101532
 +
|-
 +
| 2014
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 317.79 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2014
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 1.18 Tons
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| 101532
 +
|-
 +
| 2015
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 857.90 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2015
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 857.90 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0254185
 +
|-
 +
| 2015
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 22.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2015
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,121.97 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2015
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 22.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW019
 +
|-
 +
| 2016
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 931.80 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 51.10 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0254185
 +
|-
 +
| 2016
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 255.10 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2016
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 46.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
 
 +
| style="text-align: right;" | 0.03 Tons
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| 101532
 +
|-
 +
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 55.56 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 59.26 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
 
 +
| style="text-align: right;" | 24.10 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
 
 +
| style="text-align: right;" | 165.20 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
 
 +
| style="text-align: right;" | 87.52 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 254.43 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 36.50 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 15.73 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Soil Contaminated by Oil
 +
| style="text-align: right;" | 0.03 Tons
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| 101532
 +
|-
 +
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Soil Contaminated by Oil & Gas Related Spills
 +
| style="text-align: right;" | 0.03 Tons
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| 101532
 
|-
 
|-
| Last Permit Date: 2012-05-04
+
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 8.27 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
| Spud Date: 2012-07-01
+
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
 
 +
| style="text-align: right;" | 15.73 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
| Unconventional: Yes
+
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 124.89 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
| Horizontal: Yes
+
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 10.35 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 
|-
 
|-
| Producing: Yes
+
| 2018
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 61.75 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
| Violations: None
+
| 2018
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 22.46 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 
|-
 
|-
| Latitude: 40.61608
+
| 2018
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 149.26 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 
|-
 
|-
| Longitude: -79.786541
+
| 2018
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 0.60 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2018
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 47.18 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2018
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 334.14 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 16.60 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW030
 +
|-
 +
| 2018
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 5.40 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW030
 +
|-
 +
| 2019
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 14.29 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 86.26 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 320.60 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 114.80 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW015
 +
|-
 +
| 2019
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 57.71 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 2.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW015
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 2074460
 
| 2074460
 +
| Primary Facility
 
| 2012-05-31
 
| 2012-05-31
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| THE SITE FOR THIS WELL IS UNDER CONSTRUCTION. E&S CONTROLS ARE IN PLACE.
 
| THE SITE FOR THIS WELL IS UNDER CONSTRUCTION. E&S CONTROLS ARE IN PLACE.
|
 
|-
 
 
|-
 
|-
 
| 2075945
 
| 2075945
 +
| Primary Facility
 
| 2012-06-14
 
| 2012-06-14
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| John Ley, Water Quality Specialist, SWRO was on site to conduct an inspection.  the site sign was in place and showed the proper permitting information.  the E&S controls and BMP's were in place and constructed according to plan.  The access road berms and soil stock pile had been stabilized.  The pad was still under construction.  The only issue was that the ICT drainage ditches at the bottom of the site slopes were filling up with soil boulders that had rolled down the slope as the pad was being constructed.  These runoff ditches should be cleared.
 
| John Ley, Water Quality Specialist, SWRO was on site to conduct an inspection.  the site sign was in place and showed the proper permitting information.  the E&S controls and BMP's were in place and constructed according to plan.  The access road berms and soil stock pile had been stabilized.  The pad was still under construction.  The only issue was that the ICT drainage ditches at the bottom of the site slopes were filling up with soil boulders that had rolled down the slope as the pad was being constructed.  These runoff ditches should be cleared.
|
 
|-
 
 
|-
 
|-
 
| 2078633
 
| 2078633
 +
| Primary Facility
 
| 2012-06-25
 
| 2012-06-25
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| John Ley, Water Quality Specialist, SWRO was on site to conduct a pre-operational inspection.  The site sign was in place and showed the proper permitting information.  The E&S controls and BMP's were in place and constructed according to plan.  The access road berms had been stabilized.  Additional work was taking place on the  soil pile.  The pad was still under construction.
+
| John Ley, Water Quality Specialist, SWRO was on site to conduct a pre-operational inspection.  The site sign was in place and showed the proper permitting information.  The E&S controls and BMP's were in place and constructed according to plan.  The access road berms had been stabilized.  Additional work was taking place on the  soil pile.  The pad was still under construction.
 
 
The previous minor issue mentioned in the June 15th report dealing with the ICT drainage ditches at the bottom of the fill slopes was rectified.  All the boulders have been removed and the ditches were dressed up.  They will have rock added once the fill slope construction is completed. 
 
 
 
|
 
|-
 
 
|-
 
|-
 
| 2085898
 
| 2085898
 +
| Primary Facility
 
| 2012-07-12
 
| 2012-07-12
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| TRIPPING IN HOLE TO RESUME DRILLING @ 1671'.
 
| TRIPPING IN HOLE TO RESUME DRILLING @ 1671'.
|
 
|-
 
 
|-
 
|-
 
| 2085912
 
| 2085912
 +
| Primary Facility
 
| 2012-07-19
 
| 2012-07-19
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| TOP HOLE COMPLETE AT 6793'.
 
| TOP HOLE COMPLETE AT 6793'.
|
 
|-
 
 
|-
 
|-
 
| 2085940
 
| 2085940
 +
| Primary Facility
 
| 2012-07-06
 
| 2012-07-06
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| CREW PREPARING TO CEMENT MINE STRING.
 
| CREW PREPARING TO CEMENT MINE STRING.
|
 
|-
 
 
|-
 
|-
 
| 2096727
 
| 2096727
 +
| Primary Facility
 
| 2012-08-28
 
| 2012-08-28
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| TOP HOLE IS COMPLETE AND A KOP HAS BEEN SET.
 
| TOP HOLE IS COMPLETE AND A KOP HAS BEEN SET.
|
 
|-
 
 
|-
 
|-
 
| 2097427
 
| 2097427
 +
| Primary Facility
 
| 2012-08-31
 
| 2012-08-31
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| LARGE ABOVE GROUND TANKS ARE BEING BUILT TO HOLD FRAC WATER. SITE IS IN GOOD CONDITION.
 
| LARGE ABOVE GROUND TANKS ARE BEING BUILT TO HOLD FRAC WATER. SITE IS IN GOOD CONDITION.
|
 
|-
 
 
|-
 
|-
 
| 2097726
 
| 2097726
 +
| Primary Facility
 
| 2012-09-05
 
| 2012-09-05
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| John Ley, WQS, SWRO was on site to conduct a routine inspection.  At the time of the inspection, the well sign, E&S plan, and well permit were on site.  BMP's installed were functioning according to the E&S plan. Hillsides were temporarily stabilized and had good growth on them.  No accelerated erosion or sedimentation issues were observed on site or on the gated access road.  Silt sock in the lower field will be removed to allow for mowing of the field.
 
| John Ley, WQS, SWRO was on site to conduct a routine inspection.  At the time of the inspection, the well sign, E&S plan, and well permit were on site.  BMP's installed were functioning according to the E&S plan. Hillsides were temporarily stabilized and had good growth on them.  No accelerated erosion or sedimentation issues were observed on site or on the gated access road.  Silt sock in the lower field will be removed to allow for mowing of the field.
 
The site had verticals drilled but drilling the wells was not complete.  The site had temporary reservoirs constructed that were being filled with fresh water to be used to frac the Bakerstown Road site.  When this operation has been completed, and the reservoirs removed, drilling will continue at this site.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2106808
 
| 2106808
 +
| Primary Facility
 
| 2012-10-10
 
| 2012-10-10
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| TOP HOLE IS COMPLETE. THE PAD IS BEING USED FOR FRESH WATER STORAGE.
 
| TOP HOLE IS COMPLETE. THE PAD IS BEING USED FOR FRESH WATER STORAGE.
|
 
|-
 
 
|-
 
|-
 
| 2116890
 
| 2116890
 +
| Primary Facility
 
| 2012-11-06
 
| 2012-11-06
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| PAD GETTING PREP FOR BOTTOM HOLE RIG.
 
| PAD GETTING PREP FOR BOTTOM HOLE RIG.
|
 
|-
 
 
|-
 
|-
 
| 2124773
 
| 2124773
 +
| Primary Facility
 
| 2012-12-04
 
| 2012-12-04
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| TOP HOLE TD AT 6,793'. THE SITE IS IN GOOD CONDITION.
 
| TOP HOLE TD AT 6,793'. THE SITE IS IN GOOD CONDITION.
|
 
|-
 
 
|-
 
|-
 
| 2130149
 
| 2130149
 +
| Primary Facility
 
| 2013-01-10
 
| 2013-01-10
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| John Ley WQS, SWRO was on site to conduct a routine inspection.  At the time of this inspection, the well sign, E&S plan, and the PPC plan  were onsite. The site was gated for security. The wells were drilled and equipment had been removed. The ground around the site was snow covered but there did not appear to be any accelerated erosion or sedimentation issues.
 
| John Ley WQS, SWRO was on site to conduct a routine inspection.  At the time of this inspection, the well sign, E&S plan, and the PPC plan  were onsite. The site was gated for security. The wells were drilled and equipment had been removed. The ground around the site was snow covered but there did not appear to be any accelerated erosion or sedimentation issues.
|
 
|-
 
 
|-
 
|-
 
| 2131212
 
| 2131212
 +
| Primary Facility
 
| 2013-01-08
 
| 2013-01-08
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| BOTTOM HOLE DRILLING COMPLETE. WELL NOT FRACED. RIG IS GONE.
 
| BOTTOM HOLE DRILLING COMPLETE. WELL NOT FRACED. RIG IS GONE.
|
 
 
|-
 
|-
|}
+
| 2143082
== Production Data ==
+
| Primary Facility
{| class="wikitable sortable" width="95%"
+
| 2013-02-25
!scope="col" | PERIOD
+
| Drilling/Alteration
!scope="col" | GAS QUANTITY
+
| No Violations Noted
!scope="col" | GAS PRODUCTION DAYS
+
| DRILLING COMPLETE AND READY TO FRAC.SITE IS GOOD
!scope="col" | CONDENSATE QUANTITY
+
|-
!scope="col" | CONDENSATE PRODUCTION DAYS
+
| 2146658
!scope="col" | OIL QUANTITY
+
| Primary Facility
!scope="col" | OIL PRODUCTION DAYS
+
| 2013-03-06
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| ALL FIVE WELLS ON THIS PAD ARE BEING FRACED.
 +
|-
 +
| 2156464
 +
| Primary Facility
 +
| 2013-04-02
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| THIS WELL IS BEING SET UP FOR FLOWBACK. THE SITE IS OK.
 +
|-
 +
| 2165006
 +
| Primary Facility
 +
| 2013-04-18
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| WELL IS FRACED. EQUIPTMENT SET FOR PRODUCTION. SITE IS OK.
 +
|-
 +
| 2172750
 +
| Primary Facility
 +
| 2013-05-30
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| WELL IS PRODUCING. EQUIPTMENT IS IN GOOD CONDITION.
 +
|-
 +
| 2173329
 +
| Primary Facility
 +
| 2013-05-20
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well was inspected concurrently with ESX12-003-0003 Schiller 1-6H Well Site, Site 759251 (inspection record 2173310). Temporary stabilization appeared adequate. No erosion or sedimentation issues were apparent.  Production fluids were contained and no leaks to the environment were evident.
 +
|-
 +
| 2195558
 +
| Primary Facility
 +
| 2013-08-13
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well was inspected concurrently with ESX12-003-0003 Schiller 1-6H Well Site, Site 759251 (inspection record 2195548). Temporary stabilization appeared adequate. No erosion or sedimentation issues were apparent.  Production fluids were contained and no leaks to the environment were evident. Site restoration extension has been granted until September 28, 2015.
 +
|-
 +
| 2231268
 +
| Primary Facility
 +
| 2013-12-19
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well was inspected concurrently with ESX12-003-0003 Schiller 1-6H Well Site, Site 759251 (inspection record 2231267). Site was snow covered at time of inspection. No erosion or sedimentation issues were apparent.  Production fluids were contained; no leaks to the environment were evident. Site restoration extension was previously granted an extension until September 28, 2015.
 +
|-
 +
| 2255699
 +
| Primary Facility
 +
| 2014-03-10
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| WELL IS HOOKED UP AND PRODUCING. PAD AND EQUIPTMENT IS WELL MAINTAINED.
 
|-
 
|-
| 2012-2
+
| 2287597
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2014-06-25
| style="text-align:right;" | 0.0
+
| Drilling/Alteration
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| THE WELL WAS PREPARED TO RUN TUBING IN, BUT THE RIG WAS DELAYED.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2289161
 +
| Primary Facility
 +
| 2014-07-10
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| THERE IS TUBING STACKED ON RACKS TO RUN INTO THE WELL.
 
|-
 
|-
| 2012-1
+
| 2310014
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2014-10-03
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| This site's restoration date was previously extended to September 28, 2015. No E&S issues were noted. No leaks to the environment were evident. Concurrently inspected site and its associated wells.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
|}
+
| 2395481
== Waste Data ==
+
| Primary Facility
{| class="wikitable sortable" width="95%"
+
| 2015-07-28
!scope="col" | PERIOD
+
| Complaint Inspection
!scope="col" | TYPE
+
| No Violations Noted
!scope="col" | QUANTITY
+
| On 7/28/15 water samples were taken from basement tap for 946 analyses in response to complaint 313700.
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-2
+
| 2401524
| DRILLING FLUID WASTE
+
| Primary Facility
| style="text-align:right;" | 425.05
+
| 2015-08-07
| Bbl
+
| Routine/Complete Inspection
| REUSE OTHER THAN ROAD SPREADING
+
| No Violations Noted
|  
+
| On 8/7/15, I inspected the Schiller site as a routine inspection and made the following observations:
| REUSE FOR DRILLING OR PLUGGING
 
|
 
| PA
 
 
|-
 
|-
 +
| 2419273
 +
| Primary Facility
 +
| 2015-10-23
 +
| Administrative/File Review
 +
| No Violations Noted
 +
| Administrative review of lab results on 10/23/15 indicates that water supply does not appear to have been impacted by oil & gas activity.  Results and documentation forwarded for final determination
 
|-
 
|-
| 2012-2
+
| 2483946
| DRILL CUTTINGS
+
| Primary Facility
| style="text-align:right;" | 205.43
+
| 2016-05-10
| Tons
+
| Routine/Complete Inspection
| LANDFILL
+
| No Violations Noted
| 100280
+
| THIS GAS WELL AND IT'S PRODUCTION EQUIPTMENT HAVE BEEN WELL MAINTAINED.
| USA VALLEY FACILITY, INC
+
THE SITE IS IN GOOD CONDITION.
| IRWIN
 
| PA
 
 
|-
 
|-
 +
| 2657151
 +
| Primary Facility
 +
| 2017-11-06
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well drilled and equipped for production. Well tag present. Well apparatus appears to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road.
 
|-
 
|-
| 2012-2
+
| 2691319
| DRILL CUTTINGS
+
| Primary Facility
| style="text-align:right;" | 122.31
+
| 2018-02-06
| Tons
+
| Routine/Complete Inspection
| LANDFILL
+
| No Violations Noted
| 100172
+
| Act 9 site identification sign installed. Well drilled and equipped for production. Well tag present. Well apparatus,brine tanks and gas production unit appears to be in sound condition.
| WASTE MANAGEMENT, INC  - ARDEN LANDFILL, INC.
 
| WASHINGTON
 
| PA
 
 
|-
 
|-
 +
| 2729077
 +
| Primary Facility
 +
| 2018-05-11
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Multi-well pad. At time of inspection, all five wells on this pad are drilled and appear equipped for production.
 +
 +
Manned security booth on-site.
 +
 +
The ESCGP for this site was terminated on 2/6/2018.
 
|-
 
|-
| 2012-2
+
| 2758450
| DRILL CUTTINGS
+
| Primary Facility
| style="text-align:right;" | 669.43
+
| 2018-08-01
| Tons
+
| Routine/Complete Inspection
| LANDFILL
+
| No Violations Noted
| 100434
+
| This well and equipment are in good condition.
| WASTE MANAGEMENT, INC - EVERGREEN LANDFILL
 
| BLAIRSVILLE
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 12:45, 20 May 2020

Well Details

Well ID: 37-003-22222
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Frazer Township
Operator Name: RANGE RESOURCES APPALACHIA LLC
Well Pad ID: 149247
Farm/Lease Name: SCHILLER GERALD UNIT 1H
License Status:
Spud Date:
Permit Date: 2012-05-04
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.616081
Longitude: -79.786542

For data sources see[1][2][3]

Well History

Date Event
2012-05-04 New Permit Application
2012-07-01 Performed Spud Operation
2012-12-20 Drilling Completion
2013-03-02 Perforation
2013-06-25 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-02-23 2013-03-03 6,702 4,816,640

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 37% HCL FracTech Cleans Perforation HCL 7647-01-0 37 0.02575 0
MC B-8520 Multichem Antibacterial Agent 3,4,4-Trimethyloxazolodine 75673-43-7 5 0.00091 0
Formaldehyde Amine 56652-26-7 0.5 0.00009000 0
4,4-Dimethyloxazolidine 51200-87-4 78 0.01418 0
2-Amino-2-methyl-1-propanol 124-68-5 1 0.00018 0
CI-100 FracTech Corrosion Inhibitor Methanol 67-56-1 95 0.00054 0
Propargyl Alcohol 107-19-7 5 0.00003000 0
MC B-8650 Multichem Antibacterial Agent Methanol 67-56-1 0.5 0.00004000 0
Glutaraldehyde 111-30-8 50 0.00398 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 RANGE RESOURCES APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 RANGE RESOURCES APPALACHIA LLC 1,170,948.18 286 0.00 0 0.00 0
2014 RANGE RESOURCES APPALACHIA LLC 728,696.60 359 0.00 0 0.00 0
2015 RANGE RESOURCES APPALACHIA LLC 513,895.32 365 0.00 0 0.00 0
2016 RANGE RESOURCES APPALACHIA LLC 385,780.57 360 0.00 0 0.00 0
2017 RANGE RESOURCES APPALACHIA LLC 274,558.90 356 0.00 0 0.00 0
2018 RANGE RESOURCES APPALACHIA LLC 247,185.98 291 0.00 0 0.00 0
2019 RANGE RESOURCES APPALACHIA LLC 223,958.48 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 RANGE RESOURCES APPALACHIA LLC Drill Cuttings 122.31 Tons LANDFILL 100172
2012 RANGE RESOURCES APPALACHIA LLC Drilling Fluid Waste 425.05 Bbl REUSE OTHER THAN ROAD SPREADING
2012 RANGE RESOURCES APPALACHIA LLC Drill Cuttings 669.43 Tons LANDFILL 100434
2012 RANGE RESOURCES APPALACHIA LLC Drill Cuttings 205.43 Tons LANDFILL 100280
2013 RANGE RESOURCES APPALACHIA LLC Produced Fluid 8,758.57 Bbl REUSE OTHER THAN ROAD SPREADING
2013 RANGE RESOURCES APPALACHIA LLC Fracturing Fluid Waste 11.18 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2013 RANGE RESOURCES APPALACHIA LLC Drilling Fluid Waste 23.81 Bbl REUSE OTHER THAN ROAD SPREADING
2013 RANGE RESOURCES APPALACHIA LLC Fracing Fluid Waste 9,194.95 Bbl REUSE OTHER THAN ROAD SPREADING
2014 RANGE RESOURCES APPALACHIA LLC Produced Fluid 454.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2014 RANGE RESOURCES APPALACHIA LLC Produced Fluid 2,350.74 Bbl REUSE OTHER THAN ROAD SPREADING
2014 RANGE RESOURCES APPALACHIA LLC Produced Fluid 136.44 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 RANGE RESOURCES APPALACHIA LLC Fracing Fluid Waste 6.43 Bbl RESIDUAL WASTE TRANSFER FACILITY 101532
2014 RANGE RESOURCES APPALACHIA LLC Produced Fluid 317.79 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 RANGE RESOURCES APPALACHIA LLC Fracturing Fluid Waste 1.18 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2015 RANGE RESOURCES APPALACHIA LLC Produced Fluid 857.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2015 RANGE RESOURCES APPALACHIA LLC Produced Fluid 857.90 Bbl CENT WASTE TRT FAC NPDES PA0254185
2015 RANGE RESOURCES APPALACHIA LLC Produced Fluid 22.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2015 RANGE RESOURCES APPALACHIA LLC Produced Fluid 1,121.97 Bbl REUSE OTHER THAN ROAD SPREADING
2015 RANGE RESOURCES APPALACHIA LLC Produced Fluid 22.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RANGE RESOURCES APPALACHIA LLC Produced Fluid 931.80 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RANGE RESOURCES APPALACHIA LLC Produced Fluid 51.10 Bbl CENT WASTE TRT FAC NPDES PA0254185
2016 RANGE RESOURCES APPALACHIA LLC Produced Fluid 255.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RANGE RESOURCES APPALACHIA LLC Produced Fluid 46.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RANGE RESOURCES APPALACHIA LLC 0.03 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 55.56 Bbl REUSE (AT WELL PAD)
2017 RANGE RESOURCES APPALACHIA LLC Produced Fluid 59.26 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RANGE RESOURCES APPALACHIA LLC 24.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RANGE RESOURCES APPALACHIA LLC 165.20 Bbl REUSE (AT WELL PAD)
2017 RANGE RESOURCES APPALACHIA LLC 87.52 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RANGE RESOURCES APPALACHIA LLC Produced Fluid 254.43 Bbl REUSE (AT WELL PAD)
2017 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 36.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RANGE RESOURCES APPALACHIA LLC Produced Fluid 15.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 RANGE RESOURCES APPALACHIA LLC Soil Contaminated by Oil 0.03 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RANGE RESOURCES APPALACHIA LLC Soil Contaminated by Oil & Gas Related Spills 0.03 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 8.27 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 RANGE RESOURCES APPALACHIA LLC 15.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 RANGE RESOURCES APPALACHIA LLC Produced Fluid 124.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 10.35 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 RANGE RESOURCES APPALACHIA LLC Produced Fluid 61.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RANGE RESOURCES APPALACHIA LLC Produced Fluid 22.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 149.26 Bbl REUSE (AT WELL PAD)
2018 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 0.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 47.18 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RANGE RESOURCES APPALACHIA LLC Produced Fluid 334.14 Bbl REUSE (AT WELL PAD)
2018 RANGE RESOURCES APPALACHIA LLC Produced Fluid 16.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW030
2018 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 5.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW030
2019 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 14.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 86.26 Bbl REUSE (AT WELL PAD)
2019 RANGE RESOURCES APPALACHIA LLC Produced Fluid 320.60 Bbl REUSE (AT WELL PAD)
2019 RANGE RESOURCES APPALACHIA LLC Produced Fluid 114.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW015
2019 RANGE RESOURCES APPALACHIA LLC Produced Fluid 57.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 2.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW015

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2074460 Primary Facility 2012-05-31 Drilling/Alteration No Violations Noted THE SITE FOR THIS WELL IS UNDER CONSTRUCTION. E&S CONTROLS ARE IN PLACE.
2075945 Primary Facility 2012-06-14 Routine/Complete Inspection No Violations Noted John Ley, Water Quality Specialist, SWRO was on site to conduct an inspection. the site sign was in place and showed the proper permitting information. the E&S controls and BMP's were in place and constructed according to plan. The access road berms and soil stock pile had been stabilized. The pad was still under construction. The only issue was that the ICT drainage ditches at the bottom of the site slopes were filling up with soil boulders that had rolled down the slope as the pad was being constructed. These runoff ditches should be cleared.
2078633 Primary Facility 2012-06-25 Routine/Complete Inspection No Violations Noted John Ley, Water Quality Specialist, SWRO was on site to conduct a pre-operational inspection. The site sign was in place and showed the proper permitting information. The E&S controls and BMP's were in place and constructed according to plan. The access road berms had been stabilized. Additional work was taking place on the soil pile. The pad was still under construction.
2085898 Primary Facility 2012-07-12 Drilling/Alteration No Violations Noted TRIPPING IN HOLE TO RESUME DRILLING @ 1671'.
2085912 Primary Facility 2012-07-19 Drilling/Alteration No Violations Noted TOP HOLE COMPLETE AT 6793'.
2085940 Primary Facility 2012-07-06 Drilling/Alteration No Violations Noted CREW PREPARING TO CEMENT MINE STRING.
2096727 Primary Facility 2012-08-28 Drilling/Alteration No Violations Noted TOP HOLE IS COMPLETE AND A KOP HAS BEEN SET.
2097427 Primary Facility 2012-08-31 Drilling/Alteration No Violations Noted LARGE ABOVE GROUND TANKS ARE BEING BUILT TO HOLD FRAC WATER. SITE IS IN GOOD CONDITION.
2097726 Primary Facility 2012-09-05 Routine/Complete Inspection No Violations Noted John Ley, WQS, SWRO was on site to conduct a routine inspection. At the time of the inspection, the well sign, E&S plan, and well permit were on site. BMP's installed were functioning according to the E&S plan. Hillsides were temporarily stabilized and had good growth on them. No accelerated erosion or sedimentation issues were observed on site or on the gated access road. Silt sock in the lower field will be removed to allow for mowing of the field.
2106808 Primary Facility 2012-10-10 Drilling/Alteration No Violations Noted TOP HOLE IS COMPLETE. THE PAD IS BEING USED FOR FRESH WATER STORAGE.
2116890 Primary Facility 2012-11-06 Drilling/Alteration No Violations Noted PAD GETTING PREP FOR BOTTOM HOLE RIG.
2124773 Primary Facility 2012-12-04 Drilling/Alteration No Violations Noted TOP HOLE TD AT 6,793'. THE SITE IS IN GOOD CONDITION.
2130149 Primary Facility 2013-01-10 Routine/Complete Inspection No Violations Noted John Ley WQS, SWRO was on site to conduct a routine inspection. At the time of this inspection, the well sign, E&S plan, and the PPC plan were onsite. The site was gated for security. The wells were drilled and equipment had been removed. The ground around the site was snow covered but there did not appear to be any accelerated erosion or sedimentation issues.
2131212 Primary Facility 2013-01-08 Drilling/Alteration No Violations Noted BOTTOM HOLE DRILLING COMPLETE. WELL NOT FRACED. RIG IS GONE.
2143082 Primary Facility 2013-02-25 Drilling/Alteration No Violations Noted DRILLING COMPLETE AND READY TO FRAC.SITE IS GOOD
2146658 Primary Facility 2013-03-06 Drilling/Alteration No Violations Noted ALL FIVE WELLS ON THIS PAD ARE BEING FRACED.
2156464 Primary Facility 2013-04-02 Drilling/Alteration No Violations Noted THIS WELL IS BEING SET UP FOR FLOWBACK. THE SITE IS OK.
2165006 Primary Facility 2013-04-18 Drilling/Alteration No Violations Noted WELL IS FRACED. EQUIPTMENT SET FOR PRODUCTION. SITE IS OK.
2172750 Primary Facility 2013-05-30 Drilling/Alteration No Violations Noted WELL IS PRODUCING. EQUIPTMENT IS IN GOOD CONDITION.
2173329 Primary Facility 2013-05-20 Routine/Complete Inspection No Violations Noted This well was inspected concurrently with ESX12-003-0003 Schiller 1-6H Well Site, Site 759251 (inspection record 2173310). Temporary stabilization appeared adequate. No erosion or sedimentation issues were apparent. Production fluids were contained and no leaks to the environment were evident.
2195558 Primary Facility 2013-08-13 Routine/Complete Inspection No Violations Noted This well was inspected concurrently with ESX12-003-0003 Schiller 1-6H Well Site, Site 759251 (inspection record 2195548). Temporary stabilization appeared adequate. No erosion or sedimentation issues were apparent. Production fluids were contained and no leaks to the environment were evident. Site restoration extension has been granted until September 28, 2015.
2231268 Primary Facility 2013-12-19 Routine/Complete Inspection No Violations Noted This well was inspected concurrently with ESX12-003-0003 Schiller 1-6H Well Site, Site 759251 (inspection record 2231267). Site was snow covered at time of inspection. No erosion or sedimentation issues were apparent. Production fluids were contained; no leaks to the environment were evident. Site restoration extension was previously granted an extension until September 28, 2015.
2255699 Primary Facility 2014-03-10 Drilling/Alteration No Violations Noted WELL IS HOOKED UP AND PRODUCING. PAD AND EQUIPTMENT IS WELL MAINTAINED.
2287597 Primary Facility 2014-06-25 Drilling/Alteration No Violations Noted THE WELL WAS PREPARED TO RUN TUBING IN, BUT THE RIG WAS DELAYED.
2289161 Primary Facility 2014-07-10 Drilling/Alteration No Violations Noted THERE IS TUBING STACKED ON RACKS TO RUN INTO THE WELL.
2310014 Primary Facility 2014-10-03 Routine/Complete Inspection No Violations Noted This site's restoration date was previously extended to September 28, 2015. No E&S issues were noted. No leaks to the environment were evident. Concurrently inspected site and its associated wells.
2395481 Primary Facility 2015-07-28 Complaint Inspection No Violations Noted On 7/28/15 water samples were taken from basement tap for 946 analyses in response to complaint 313700.
2401524 Primary Facility 2015-08-07 Routine/Complete Inspection No Violations Noted On 8/7/15, I inspected the Schiller site as a routine inspection and made the following observations:
2419273 Primary Facility 2015-10-23 Administrative/File Review No Violations Noted Administrative review of lab results on 10/23/15 indicates that water supply does not appear to have been impacted by oil & gas activity. Results and documentation forwarded for final determination
2483946 Primary Facility 2016-05-10 Routine/Complete Inspection No Violations Noted THIS GAS WELL AND IT'S PRODUCTION EQUIPTMENT HAVE BEEN WELL MAINTAINED.

THE SITE IS IN GOOD CONDITION.

2657151 Primary Facility 2017-11-06 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present. Well apparatus appears to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road.
2691319 Primary Facility 2018-02-06 Routine/Complete Inspection No Violations Noted Act 9 site identification sign installed. Well drilled and equipped for production. Well tag present. Well apparatus,brine tanks and gas production unit appears to be in sound condition.
2729077 Primary Facility 2018-05-11 Routine/Complete Inspection No Violations Noted Multi-well pad. At time of inspection, all five wells on this pad are drilled and appear equipped for production.

Manned security booth on-site.

The ESCGP for this site was terminated on 2/6/2018.

2758450 Primary Facility 2018-08-01 Routine/Complete Inspection No Violations Noted This well and equipment are in good condition.

For data sources see[8]

References