X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-02044"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-02044
 
| Well ID: 37-005-02044
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.731222, -79.367056 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.731222, -79.367056 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: H. SMAIL 1
 
| Farm/Lease Name: H. SMAIL 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 1800-01-01
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date:  
 
| Permit Date:  
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.731222
 
| Latitude: 40.731222
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1901-01-01
 +
| Drilling Completion
 +
|-
 +
| 1993-08-02
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 92:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 86: Line 118:
 
|-
 
|-
 
| 1994
 
| 1994
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 1,251.00
 
| style="text-align: right;" | 1,251.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 95: Line 127:
 
|-
 
|-
 
| 1996
 
| 1996
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
| style="text-align: right;" | 1,470.00
+
| style="text-align: right;" | 1470
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 104: Line 136:
 
|-
 
|-
 
| 1997
 
| 1997
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
| style="text-align: right;" | 1,359.00
+
| style="text-align: right;" | 1359
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 113: Line 145:
 
|-
 
|-
 
| 1998
 
| 1998
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
| style="text-align: right;" | 812.00
+
| style="text-align: right;" | 812
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 122: Line 154:
 
|-
 
|-
 
| 1999
 
| 1999
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
| style="text-align: right;" | 1,151.00
+
| style="text-align: right;" | 1151
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 131: Line 163:
 
|-
 
|-
 
| 2000
 
| 2000
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
| style="text-align: right;" | 1,043.00
+
| style="text-align: right;" | 1043
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 140: Line 172:
 
|-
 
|-
 
| 2001
 
| 2001
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
| style="text-align: right;" | 754.00
+
| style="text-align: right;" | 754
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 149: Line 181:
 
|-
 
|-
 
| 2002
 
| 2002
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
| style="text-align: right;" | 518.00
+
| style="text-align: right;" | 518
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 158: Line 190:
 
|-
 
|-
 
| 2003
 
| 2003
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
| style="text-align: right;" | 479.00
+
| style="text-align: right;" | 479
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 167: Line 199:
 
|-
 
|-
 
| 2004
 
| 2004
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
| style="text-align: right;" | 480.00
+
| style="text-align: right;" | 480
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 176: Line 208:
 
|-
 
|-
 
| 2005
 
| 2005
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
| style="text-align: right;" | 292.00
+
| style="text-align: right;" | 292
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 185: Line 217:
 
|-
 
|-
 
| 2006
 
| 2006
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 249.00
 
| style="text-align: right;" | 249.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 194: Line 226:
 
|-
 
|-
 
| 2007
 
| 2007
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 216.00
 
| style="text-align: right;" | 216.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 203: Line 235:
 
|-
 
|-
 
| 2008
 
| 2008
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 268.00
 
| style="text-align: right;" | 268.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 212: Line 244:
 
|-
 
|-
 
| 2009
 
| 2009
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 367.00
 
| style="text-align: right;" | 367.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 221: Line 253:
 
|-
 
|-
 
| 2010
 
| 2010
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 327.00
 
| style="text-align: right;" | 327.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 230: Line 262:
 
|-
 
|-
 
| 2011
 
| 2011
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 275.00
 
| style="text-align: right;" | 275.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 239: Line 271:
 
|-
 
|-
 
| 2012
 
| 2012
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 370.00
 
| style="text-align: right;" | 370.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 248: Line 280:
 
|-
 
|-
 
| 2013
 
| 2013
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 1,133.00
 
| style="text-align: right;" | 1,133.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 257: Line 289:
 
|-
 
|-
 
| 2014
 
| 2014
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 2,752.00
 
| style="text-align: right;" | 2,752.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 266: Line 298:
 
|-
 
|-
 
| 2015
 
| 2015
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 54.00
 
| style="text-align: right;" | 54.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 275: Line 307:
 
|-
 
|-
 
| 2016
 
| 2016
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 60.00
 
| style="text-align: right;" | 60.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 284: Line 316:
 
|-
 
|-
 
| 2017
 
| 2017
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 1.00
 
| style="text-align: right;" | 1.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 293: Line 325:
 
|-
 
|-
 
| 2018
 
| 2018
| [[ALCOVE INVESTMENTS]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 1.00
 
| style="text-align: right;" | 1.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 130.00
 +
| style="text-align: right;" | 120
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0

Revision as of 16:34, 20 May 2020

Well Details

Well ID: 37-005-02044
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Plumcreek Township
Operator Name: ALCOVE INVESTMENTS
Well Pad ID:
Farm/Lease Name: H. SMAIL 1
License Status: ACTIVE
Spud Date:
Permit Date:
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.731222
Longitude: -79.367056

For data sources see[1][2][3]

Well History

Date Event
1901-01-01 Drilling Completion
1993-08-02 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1994 1,251.00 365 0.00 0 0.00 0
1996 1470 365 0.00 0 0.00 0
1997 1359 365 0.00 0 0.00 0
1998 812 365 0.00 0 0.00 0
1999 1151 365 0.00 0 0.00 0
2000 1043 365 0.00 0 0.00 0
2001 754 365 0.00 0 0.00 0
2002 518 365 0.00 0 0.00 0
2003 479 365 0.00 0 0.00 0
2004 480 365 0.00 0 0.00 0
2005 292 365 0.00 0 0.00 0
2006 249.00 365 0.00 0 0.00 0
2007 216.00 365 0.00 0 0.00 0
2008 268.00 365 0.00 0 0.00 0
2009 367.00 365 0.00 0 0.00 0
2010 327.00 365 0.00 0 0.00 0
2011 275.00 365 0.00 0 0.00 0
2012 370.00 365 0.00 0 0.00 0
2013 1,133.00 365 0.00 0 0.00 0
2014 2,752.00 365 0.00 0 0.00 0
2015 54.00 365 0.00 0 0.00 0
2016 60.00 365 0.00 0 0.00 0
2017 1.00 365 0.00 0 0.00 0
2018 1.00 365 0.00 0 0.00 0
2019 130.00 120 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2527485 Primary Facility 2016-10-13 Routine/Complete Inspection No Violations Noted Well tagged-in production. Annulus was open. Well head casing looked ok.

For data sources see[6]

References