X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-29428"

m
m
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-29428
 
| Well ID: 37-005-29428
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.774113, -79.568855 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.774114, -79.568856 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Armstrong County, Pennsylvania|Armstrong]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[North Buffalo Township, Armstrong County, Pennsylvania|North Buffalo Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[MDS ENERGY LTD|MDS ENERGY LTD]]
+
| County: [[Armstrong_County,_Pennsylvania|Armstrong]]
 +
|-
 +
| Municipality: [[North Buffalo Township,_Armstrong_County,_Pennsylvania|North Buffalo Township]]
 +
|-
 +
| Operator Name: [[MDS ENERGY DEV LLC]]
 
|-
 
|-
 
| Well Pad ID: [[146708]]
 
| Well Pad ID: [[146708]]
Line 15: Line 19:
 
| Farm/Lease Name: MICHAEL J LORD ETUX 1-5
 
| Farm/Lease Name: MICHAEL J LORD ETUX 1-5
 
|-
 
|-
| First Permit Date: 2007-08-10
+
| License Status: ACTIVE
|-
 
| Last Permit Date: 2010-06-22
 
 
|-
 
|-
 
| Spud Date: 2007-08-15
 
| Spud Date: 2007-08-15
 
|-
 
|-
| Unconventional: Yes
+
| Permit Date: 2007-08-10
 
|-
 
|-
| Horizontal: No
+
| Well Type: GAS
 
|-
 
|-
| Producing: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Violations: None
+
| Configuration: Vertical Well
 
|-
 
|-
| Latitude: 40.774113
+
| Conservation: No
 
|-
 
|-
| Longitude: -79.568855
+
| Latitude: 40.774114
 
|-
 
|-
 +
| Longitude: -79.568856
 
|}
 
|}
== Inspection Data ==
+
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Date
!scope="col" | DATE
+
!scope="col" | Event
!scope="col" | DESCRIPTION
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
 
|-
 
|-
| 1648252
+
| 2007-08-10
| 2007-08-22
+
| New Permit Application
| No Violations Noted
 
| WELL SPUDDED 8/15/07. PIT LINED, FREEBOARD OK, E&S OK.
 
|  
 
 
|-
 
|-
 +
| 2007-08-15
 +
| Performed Spud Operation
 
|-
 
|-
| 1949807
+
| 2007-08-22
| 2011-02-02
+
| Drilling Completion
| No Violations Noted
 
| This is a Drill Deeper. 
 
Site ID sign and E&S plan located.  Site preparation has started.  Pit is excavated but not lined.  Rock Construction entrance is installed.  There are no signs of erosion or sedimentation on the well site or access road. 
 
 
 
|  
 
 
|-
 
|-
 +
| 2008-10-21
 +
| NEWLY DRILLED
 
|-
 
|-
| 1950772
+
| 2010-06-22
| 2011-02-15
+
| New Permit Application
| No Violations Noted
 
| Rig moved off location.
 
Well is shut in on 4 1/2" x 2" swage.
 
7" x 4 1/2" annulus is open.
 
Drilling pit lined and freeboard maintained.
 
E/S controls in place and functioning as per available plan.
 
 
 
|  
 
 
|-
 
|-
 +
| 2011-02-12
 +
| Drilling Completion
 
|-
 
|-
| 2008547
+
| 2011-05-12
| 2011-10-04
+
| Perforation
| No Violations Noted
 
| Well operating and properly identified.
 
Well equipped with production unit (separators, line heater, meter), and 2 produced fluids tanks.
 
Small expression of gas at base of wellhead.
 
 
 
|  
 
 
|-
 
|-
 +
| 2013-06-25
 +
| DRILLED DEEPER
 
|-
 
|-
| 2009569
+
|}
| 2011-10-06
+
For data sources see<ref>{{cite web
| No Violations Noted
+
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
| Drilling appeared to have been completed, well appeared to be equipped for productionBrine tanks located onsite and they appeared to be in sound condition.  Site had been regraded, and the vegetation had begun to grow.  There were sever areas noted where it appeared seepage that had a sheen attributable to iron bacteria was preventing vegetation from beginning to grow. Spoke with operator representative Randy Morris via phone while onsite and he stated that he will evaluate these areas and take whatever action to alleviate the problem and allow the vegetation to begin to take hold.
+
| date = 2020-02-27
|  
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
  | accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
| 2069986
+
|}-->
| 2012-05-22
+
 
| No Violations Noted
+
<!--== Stimulation Data ==
| At the time of inspection the well appeared to be drilled and equipped for production.  The well apparatus and brine tanks located onsite appear to be in sound working condition.  The site had recently been seeded and mulch but does not meet the minimum vegetative standard at the time of inspection.  The Department recommends that the Operator continue to monitor the site to ensure 70% uniform vegetative coverage criteria is met.  No accelerated erosion and sedimentation observed is relation to the well pad area or the access road.
+
{| class="wikitable sortable" width="95%"
|  
+
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
|}
+
|}-->
 +
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2012-2
+
| 2007
| style="text-align:right;" | 16178.0
+
| [[MDS ENERGY LTD]]
| style="text-align:right;" | 178.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2010
 +
| [[MDS ENERGY LTD]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-1
+
| 2011
| style="text-align:right;" | 22860.0
+
| [[MDS ENERGY LTD]]
| style="text-align:right;" | 182.0
+
| style="text-align: right;" | 37,032.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 194
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2012
 +
| [[MDS ENERGY LTD]]
 +
| style="text-align: right;" | 39,038.00
 +
| style="text-align: right;" | 360
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-2
+
| 2013
| style="text-align:right;" | 33362.0
+
| [[MDS ENERGY LTD]]
| style="text-align:right;" | 177.0
+
| style="text-align: right;" | 24,798.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 338
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[MDS ENERGY LTD]]
 +
| style="text-align: right;" | 21,836.00
 +
| style="text-align: right;" | 345
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-1
+
| 2015
| style="text-align:right;" | 3670.0
+
| [[MDS ENERGY DEV LLC]]
| style="text-align:right;" | 17.0
+
| style="text-align: right;" | 16,585.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 356
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[MDS ENERGY DEV LLC]]
 +
| style="text-align: right;" | 14,516.00
 +
| style="text-align: right;" | 323
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-2
+
| 2017
| style="text-align:right;" | 0.0
+
| [[MDS ENERGY DEV LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 17,354.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 356
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2018
 +
| [[MDS ENERGY DEV LLC]]
 +
| style="text-align: right;" | 15,800.00
 +
| style="text-align: right;" | 348
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-3
+
| 2019
| style="text-align:right;" | 0.0
+
| [[MDS ENERGY DEV LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 13,026.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 354
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
|-
+
| style="text-align: right;" | 0
|-
 
| 2007-0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-2
+
| 2011
| PRODUCED FLUID
+
| [[MDS ENERGY LTD]]
| style="text-align:right;" | 100.0
+
| Fracing Fluid Waste
| Bbl
+
| style="text-align: right;" | 3,015.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR123SW008
+
| PA0101508
| AQUATIC SYNTHESIS UNLIMITED, LLC (KAY ARENA)
 
| INDIANA
 
| PA
 
 
|-
 
|-
|-
+
| 2011
| 2011-1
+
| [[MDS ENERGY LTD]]
| PRODUCED FLUID
+
| Produced Fluid
| style="text-align:right;" | 305.0
+
| style="text-align: right;" | 305.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 2403
 
| 2403
| DISPOSAL SITE D-1
 
|
 
| OH
 
 
|-
 
|-
 +
| 2011
 +
| [[MDS ENERGY LTD]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 95.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 525-1
 
|-
 
|-
| 2011-1
+
| 2011
| FRACING FLUID WASTE
+
| [[MDS ENERGY LTD]]
| style="text-align:right;" | 3015.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 110.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0101508
+
| PA0254185
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 
| FRANKLIN
 
| PA
 
 
|-
 
|-
 +
| 2012
 +
| [[MDS ENERGY LTD]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 80.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21447
 
|-
 
|-
| 2011-2
+
| 2012
| PRODUCED FLUID
+
| [[MDS ENERGY LTD]]
| style="text-align:right;" | 95.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 100.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 525-1
+
| WMGR123SW008
| BLAZEK PUMP AND WELL
 
| HIRAM
 
| OH
 
 
|-
 
|-
 +
| 2013
 +
| [[MDS ENERGY LTD]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 120.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW006
 
|-
 
|-
| 2011-2
+
| 2013
| PRODUCED FLUID
+
| [[MDS ENERGY LTD]]
| style="text-align:right;" | 110.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 100.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0254185
+
| WMGR123SW008
| RESERVED ENVIRONMENTAL SERVICES
+
|-
| MOUNT PLEASANT
+
| 2015
| PA
+
| [[MDS ENERGY DEV LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 105.00 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| EPA ID: 748-163
 +
|-
 +
| 2015
 +
| [[MDS ENERGY DEV LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 105.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| EPA ID: 748-163
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 1648252
 +
| Primary Facility
 +
| 2007-08-22
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| WELL SPUDDED 8/15/07. PIT LINED, FREEBOARD OK, E&S OK.
 +
|-
 +
| 1949807
 +
| Primary Facility
 +
| 2011-02-02
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This is a Drill Deeper.
 +
|-
 +
| 1950772
 +
| Primary Facility
 +
| 2011-02-15
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Rig moved off location.
 +
|-
 +
| 2008547
 +
| Primary Facility
 +
| 2011-10-04
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well operating and properly identified.
 +
|-
 +
| 2009569
 +
| Primary Facility
 +
| 2011-10-06
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Drilling appeared to have been completed, well appeared to be equipped for production.  Brine tanks located onsite and they appeared to be in sound condition.  Site had been regraded, and the vegetation had begun to grow.  There were sever areas noted where it appeared seepage that had a sheen attributable to iron bacteria was preventing vegetation from beginning to grow. Spoke with operator representative Randy Morris via phone while onsite and he stated that he will evaluate these areas and take whatever action to alleviate the problem and allow the vegetation to begin to take hold.
 +
|-
 +
| 2069986
 +
| Primary Facility
 +
| 2012-05-22
 +
| Site Restoration
 +
| No Violations Noted
 +
| At the time of inspection the well appeared to be drilled and equipped for production.  The well apparatus and brine tanks located onsite appear to be in sound working condition.  The site had recently been seeded and mulch but does not meet the minimum vegetative standard at the time of inspection.  The Department recommends that the Operator continue to monitor the site to ensure 70% uniform vegetative coverage criteria is met.  No accelerated erosion and sedimentation observed is relation to the well pad area or the access road.
 +
|-
 +
| 2178226
 +
| Primary Facility
 +
| 2013-06-26
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well appeared to be equipped for production.  Brine tanks located onsite and it appeared to be in sound condition.  Well-site ahd been appropriately restored and the was no evidence observed of accelerated erosion or sedimentation in relation to the site or access road.
 
|-
 
|-
 +
| 2393690
 +
| Primary Facility
 +
| 2015-07-29
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well appeared to be equipped for production.  There was no observed accelrated erosion or sedimentation in relation to the site or access road.  Brine tanks located onsite and they appeared to be in sound condition.
 
|-
 
|-
| 2012-1
+
| 2623606
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 80.0
+
| 2017-08-09
| Bbl
+
| Routine/Complete Inspection
| INJECTION DISPOSAL WELL
+
| No Violations Noted
| 34-155-21447
+
| Well appeared to be equipped for production.  Brine tanks located onsite and they appeared to be in sound condition.  There was no observed accelerated erosion or sedimentation in relation to the access road.
| KLEESE #2 (SWIW #19) - KLEESE DEVELOPMENT ASSOCS
 
| VIENNA
 
| OH
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 06:06, 21 May 2020

Well Details

Well ID: 37-005-29428
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: North Buffalo Township
Operator Name: MDS ENERGY DEV LLC
Well Pad ID: 146708
Farm/Lease Name: MICHAEL J LORD ETUX 1-5
License Status: ACTIVE
Spud Date: 2007-08-15
Permit Date: 2007-08-10
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: No
Latitude: 40.774114
Longitude: -79.568856

For data sources see[1][2][3]

Well History

Date Event
2007-08-10 New Permit Application
2007-08-15 Performed Spud Operation
2007-08-22 Drilling Completion
2008-10-21 NEWLY DRILLED
2010-06-22 New Permit Application
2011-02-12 Drilling Completion
2011-05-12 Perforation
2013-06-25 DRILLED DEEPER

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2007 MDS ENERGY LTD 0.00 0 0.00 0 0.00 0
2010 MDS ENERGY LTD 0.00 0 0.00 0 0.00 0
2011 MDS ENERGY LTD 37,032.00 194 0.00 0 0.00 0
2012 MDS ENERGY LTD 39,038.00 360 0.00 0 0.00 0
2013 MDS ENERGY LTD 24,798.00 338 0.00 0 0.00 0
2014 MDS ENERGY LTD 21,836.00 345 0.00 0 0.00 0
2015 MDS ENERGY DEV LLC 16,585.00 356 0.00 0 0.00 0
2016 MDS ENERGY DEV LLC 14,516.00 323 0.00 0 0.00 0
2017 MDS ENERGY DEV LLC 17,354.00 356 0.00 0 0.00 0
2018 MDS ENERGY DEV LLC 15,800.00 348 0.00 0 0.00 0
2019 MDS ENERGY DEV LLC 13,026.00 354 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 MDS ENERGY LTD Fracing Fluid Waste 3,015.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 MDS ENERGY LTD Produced Fluid 305.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 2403
2011 MDS ENERGY LTD Produced Fluid 95.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1
2011 MDS ENERGY LTD Produced Fluid 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 MDS ENERGY LTD Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2012 MDS ENERGY LTD Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW008
2013 MDS ENERGY LTD Produced Fluid 120.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW006
2013 MDS ENERGY LTD Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW008
2015 MDS ENERGY DEV LLC Produced Fluid 105.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2015 MDS ENERGY DEV LLC Produced Fluid 105.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1648252 Primary Facility 2007-08-22 Drilling/Alteration No Violations Noted WELL SPUDDED 8/15/07. PIT LINED, FREEBOARD OK, E&S OK.
1949807 Primary Facility 2011-02-02 Routine/Complete Inspection No Violations Noted This is a Drill Deeper.
1950772 Primary Facility 2011-02-15 Drilling/Alteration No Violations Noted Rig moved off location.
2008547 Primary Facility 2011-10-04 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2009569 Primary Facility 2011-10-06 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been regraded, and the vegetation had begun to grow. There were sever areas noted where it appeared seepage that had a sheen attributable to iron bacteria was preventing vegetation from beginning to grow. Spoke with operator representative Randy Morris via phone while onsite and he stated that he will evaluate these areas and take whatever action to alleviate the problem and allow the vegetation to begin to take hold.
2069986 Primary Facility 2012-05-22 Site Restoration No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. The well apparatus and brine tanks located onsite appear to be in sound working condition. The site had recently been seeded and mulch but does not meet the minimum vegetative standard at the time of inspection. The Department recommends that the Operator continue to monitor the site to ensure 70% uniform vegetative coverage criteria is met. No accelerated erosion and sedimentation observed is relation to the well pad area or the access road.
2178226 Primary Facility 2013-06-26 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and it appeared to be in sound condition. Well-site ahd been appropriately restored and the was no evidence observed of accelerated erosion or sedimentation in relation to the site or access road.
2393690 Primary Facility 2015-07-29 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. There was no observed accelrated erosion or sedimentation in relation to the site or access road. Brine tanks located onsite and they appeared to be in sound condition.
2623606 Primary Facility 2017-08-09 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the access road.

For data sources see[7]

References