X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-30312"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-30312
 
| Well ID: 37-005-30312
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.662581, -79.564436 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.662581, -79.564436 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 17: Line 17:
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name: Q SHIELDS 6
+
| Farm/Lease Name: Q SHIELDS
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 08/05/2009
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 4/6/2009
+
| Permit Date: 2009-04-06
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.662581
 
| Latitude: 40.662581
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2009-04-06
 +
| New Permit Application
 +
|-
 +
| 2009-08-05
 +
| Performed Spud Operation
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 118:
 
|-
 
|-
 
| 2009
 
| 2009
| style="text-align: right;" |
+
| [[US ENERGY EXPLORATION CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 74: Line 131:
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 83: Line 140:
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 92: Line 149:
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 101: Line 158:
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 110: Line 167:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 119: Line 176:
 
| style="text-align: right;" | 245
 
| style="text-align: right;" | 245
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 128: Line 185:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 137: Line 194:
 
| style="text-align: right;" | 305
 
| style="text-align: right;" | 305
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 146: Line 203:
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 160: Line 217:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 179: Line 237:
 
| 1819261
 
| 1819261
 
| Primary Facility
 
| Primary Facility
| 08/11/2009
+
| 2009-08-11
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 186: Line 244:
 
| 1834724
 
| 1834724
 
| Primary Facility
 
| Primary Facility
| 09/08/2009
+
| 2009-09-08
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 193: Line 251:
 
| 1834729
 
| 1834729
 
| Primary Facility
 
| Primary Facility
| 10/13/2009
+
| 2009-10-13
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 200: Line 258:
 
| 1978313
 
| 1978313
 
| Primary Facility
 
| Primary Facility
| 06/03/2011
+
| 2011-06-03
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 219: Line 277:
 
| 569028
 
| 569028
 
| 08/11/2009
 
| 08/11/2009
| 09/08/2009
+
| 2009-08-11
 
| 102.4NOPLAN - No E&S plan developed, plan not on site
 
| 102.4NOPLAN - No E&S plan developed, plan not on site
 
| Administrative
 
| Administrative
Line 227: Line 285:
 
| 569029
 
| 569029
 
| 08/11/2009
 
| 08/11/2009
| 09/08/2009
+
| 2009-08-11
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 249: Line 307:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 09/08/2009
+
| 2009-09-08
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 257: Line 315:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 05/07/2010
+
| 2010-05-07
| 05/07/2010
+
| 2010-05-07
 
| style="text-align: right;" | $22,000.00
 
| style="text-align: right;" | $22,000.00
 
| style="text-align: right;" | $22,000.00
 
| style="text-align: right;" | $22,000.00
Line 267: Line 325:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 09/08/2009
+
| 2009-09-08
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 275: Line 333:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 05/07/2010
+
| 2010-05-07
| 05/07/2010
+
| 2010-05-07
 
| style="text-align: right;" | $22,000.00
 
| style="text-align: right;" | $22,000.00
 
| style="text-align: right;" | $22,000.00
 
| style="text-align: right;" | $22,000.00
Line 287: Line 345:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 07:22, 21 May 2020

Well Details

Well ID: 37-005-30312
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Parks Township
Operator Name: US ENERGY EXPLORATION CORP
Well Pad ID:
Farm/Lease Name: Q SHIELDS
License Status:
Spud Date:
Permit Date: 2009-04-06
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.662581
Longitude: -79.564436

For data sources see[1][2][3]

Well History

Date Event
2009-04-06 New Permit Application
2009-08-05 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 US ENERGY EXPLORATION CORP 0.00 0 0.00 0 0.00 0
2010 US ENERGY EXPLORATION CORP 975.00 360 0.00 0 0.00 0
2011 US ENERGY EXPLORATION CORP 516.00 360 0.00 0 0.00 0
2012 US ENERGY EXPLORATION CORP 337.00 360 0.00 0 0.00 0
2013 US ENERGY EXPLORATION CORP 354.00 360 0.00 0 0.00 0
2014 US ENERGY EXPLORATION CORP 310.00 365 0.00 0 0.00 0
2015 US ENERGY EXPLORATION CORP 275.00 245 0.00 0 0.00 0
2016 US ENERGY EXPLORATION CORP 204.00 365 0.00 0 0.00 0
2017 US ENERGY EXPLORATION CORP 332.00 305 0.00 0 0.00 0
2018 US ENERGY EXPLORATION CORP 237.00 180 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1819261 Primary Facility 2009-08-11 Routine/Complete Inspection Violation(s) Noted Site constrcuted, drilling had not commenced at the timre of the inspection. Noted that there was no E&S plan located onsite at the time of the inspection. Observed that the filter fabric fence BMP had been compromised by sediment transport. Sediment had overtopped portions of te fence and had also pushed portions of the fencing over, finally the sections of fence had not been joined properly during installation.
1834724 Primary Facility 2009-09-08 Compliance Evaluation No Violations Noted
1834729 Primary Facility 2009-10-13 Administrative/File Review No Violations Noted
1978313 Primary Facility 2011-06-03 Routine/Complete Inspection No Violations Noted Drilling was completed September 2009. Well appeared to be equipped for production and brine tank located onsite at the time of the inspection. Brine tank appeared to be in sound condition. Vegetative cover met the 70% uniform coverage criteria. Observed no accelerated erosion or sedimentation in relation to the access road or well-site.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1819261 569028 08/11/2009 2009-08-11 102.4NOPLAN - No E&S plan developed, plan not on site Administrative
1819261 569029 08/11/2009 2009-08-11 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
569028 248896 NOV - Notice of Violation Comply/Closed 2009-09-08
569028 257620 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-05-07 2010-05-07 $22,000.00 $22,000.00
569029 248896 NOV - Notice of Violation Comply/Closed 2009-09-08
569029 257620 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-05-07 2010-05-07 $22,000.00 $22,000.00

For data sources see[6]

References