X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-30328"

(Created page with "== Well Details == {{005-30328-Details}} __TOC__ == Well Inspection Data == {{005-30328-inspection}} == Production Data == {{005-30328-production}} == Waste Data == {{005-3032...")
 
m
 
(17 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{{005-30328-Details}}
+
{| class="wikitable welldetails" width="95%"
__TOC__
+
| Well ID: 37-005-30328
== Well Inspection Data ==
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.831702, -79.688409 | width=100% | height=100% }}
{{005-30328-inspection}}
+
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Armstrong_County,_Pennsylvania|Armstrong]]
 +
|-
 +
| Municipality: [[West Franklin Township,_Armstrong_County,_Pennsylvania|West Franklin Township]]
 +
|-
 +
| Operator Name: [[SNYDER BROS INC]]
 +
|-
 +
| Well Pad ID: [[146037]]
 +
|-
 +
| Farm/Lease Name: BVL/MUSHROOM FARM 3-1813
 +
|-
 +
| License Status: ACTIVE
 +
|-
 +
| Spud Date:
 +
|-
 +
| Permit Date: 2009-05-04
 +
|-
 +
| Well Type: GAS
 +
|-
 +
| Unconventional Well: Y
 +
|-
 +
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 +
|-
 +
| Latitude: 40.831702
 +
|-
 +
| Longitude: -79.688409
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1901-01-01
 +
| Drilling Completion
 +
|-
 +
| 2009-05-04
 +
| New Permit Application
 +
|-
 +
| 2009-07-28
 +
| Performed Spud Operation
 +
|-
 +
| 2009-11-02
 +
| Perforation
 +
|-
 +
| 2011-03-04
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 
== Production Data ==
 
== Production Data ==
{{005-30328-production}}
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2010
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 33,090.50
 +
| style="text-align: right;" | 238
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 29,176.00
 +
| style="text-align: right;" | 299
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 27,514.00
 +
| style="text-align: right;" | 361
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 22,662.00
 +
| style="text-align: right;" | 359
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 16,159.00
 +
| style="text-align: right;" | 261
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 21,444.00
 +
| style="text-align: right;" | 349
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 17,168.00
 +
| style="text-align: right;" | 330
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 13,642.00
 +
| style="text-align: right;" | 330
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 9,293.00
 +
| style="text-align: right;" | 189
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 11,210.00
 +
| style="text-align: right;" | 349
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
{{005-30328-waste}}
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2010
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 900.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 301353
 +
|-
 +
| 2010
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 110.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 +
|-
 +
| 2010
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,352.50 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
|-
 +
| 2011
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 180.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21893
 +
|-
 +
| 2011
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 100.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0254185
 +
|-
 +
| 2011
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 428.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
|-
 +
| 2011
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 100.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0095273
 +
|-
 +
| 2011
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 90.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23795
 +
|-
 +
| 2012
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 80.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 525-1
 +
|-
 +
| 2012
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 86.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21447
 +
|-
 +
| 2012
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 80.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21438
 +
|-
 +
| 2012
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 78.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23584
 +
|-
 +
| 2012
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 90.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23795
 +
|-
 +
| 2013
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 183.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23223
 +
|-
 +
| 2013
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 355.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21438
 +
|-
 +
| 2014
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 40.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21438
 +
|-
 +
| 2014
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 115.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW009
 +
|-
 +
| 2015
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 152.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23196
 +
|-
 +
| 2015
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 52.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23223
 +
|-
 +
| 2016
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 60.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23196
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
 
 +
| style="text-align: right;" | 28.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23196
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 28.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23196
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 49.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-099-23158
 +
|-
 +
| 2019
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 67.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-099-23158
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 1819333
 +
| Primary Facility
 +
| 2009-08-06
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| MARCELLUS - drilling in process @ 5480ft/E&S ok/ID&pit ok
 +
|-
 +
| 1819337
 +
| Primary Facility
 +
| 2009-07-30
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| MARCELLUS - drilling in process/E&S ok/ID& pit ok
 +
|-
 +
| 1847629
 +
| Primary Facility
 +
| 2009-11-04
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well site has been drilled, well is not equipped for production.  The pit appears to be sound.  The Site ID sign and E&S plan are present.  E&S controls such as silt fence and rocked culverts have been installed.  There is no evidence of accelerated erosion or sedimentation on the access road or well site.
 +
|-
 +
| 1874932
 +
| Primary Facility
 +
| 2010-03-26
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well site has been drilled, well is equipped for production.  The tank appears to be sound.  The tag was located.  E&S controls such as silt fence and rocked culverts have been installed.  There is no evidence of accelerated erosion or sedimentation on the access road or well site.  The site needs to be seeded and mulched before restoration activities are complete.
 +
|-
 +
| 2160823
 +
| Primary Facility
 +
| 2013-04-08
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Site was restored and equipped for production. No E&S issues were noted. Production equipment and both brine tanks appeared to be in good condition.
 +
|-
 +
| 2211127
 +
| Primary Facility
 +
| 2013-10-02
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well operating and properly identified.
 +
|-
 +
| 2216884
 +
| Primary Facility
 +
| 2013-10-28
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well appeared to be equipped for production and brine tanks were located onsite.  Brine tanks appeared to be in sound condition.  There was no observed accelerated erosion or sedimentation in relation to the access road.
 +
|-
 +
| 2339348
 +
| Primary Facility
 +
| 2015-01-27
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Producing gas. Tag & tank. Site snow covered.
 +
|-
 +
| 2556488
 +
| Primary Facility
 +
| 2017-01-30
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well appeared to be equipped for production, brine tanks located onsite.  Brine tanks appeared to be in sound condition.  No accelerated erosion or sedimentation observed in relation to the site or access road.
 +
|-
 +
| 2612556
 +
| Primary Facility
 +
| 2017-07-06
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well tagged-on-annulus open. Well head casing -production set equipment-grounded 100 bbl fiberglass tank look ok.
 +
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 07:23, 21 May 2020

Well Details

Well ID: 37-005-30328
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: West Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 146037
Farm/Lease Name: BVL/MUSHROOM FARM 3-1813
License Status: ACTIVE
Spud Date:
Permit Date: 2009-05-04
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.831702
Longitude: -79.688409

For data sources see[1][2][3]

Well History

Date Event
1901-01-01 Drilling Completion
2009-05-04 New Permit Application
2009-07-28 Performed Spud Operation
2009-11-02 Perforation
2011-03-04 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 SNYDER BROS INC 33,090.50 238 0.00 0 0.00 0
2011 SNYDER BROS INC 29,176.00 299 0.00 0 0.00 0
2012 SNYDER BROS INC 27,514.00 361 0.00 0 0.00 0
2013 SNYDER BROS INC 22,662.00 359 0.00 0 0.00 0
2014 SNYDER BROS INC 16,159.00 261 0.00 0 0.00 0
2015 SNYDER BROS INC 21,444.00 349 0.00 0 0.00 0
2016 SNYDER BROS INC 17,168.00 330 0.00 0 0.00 0
2017 SNYDER BROS INC 13,642.00 330 0.00 0 0.00 0
2018 SNYDER BROS INC 9,293.00 189 0.00 0 0.00 0
2019 SNYDER BROS INC 11,210.00 349 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 SNYDER BROS INC Produced Fluid 900.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 SNYDER BROS INC Produced Fluid 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 SNYDER BROS INC Produced Fluid 1,352.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 SNYDER BROS INC Produced Fluid 180.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2011 SNYDER BROS INC Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011 SNYDER BROS INC Produced Fluid 428.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 SNYDER BROS INC Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 SNYDER BROS INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2012 SNYDER BROS INC Produced Fluid 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1
2012 SNYDER BROS INC Produced Fluid 86.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2012 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2012 SNYDER BROS INC Produced Fluid 78.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2012 SNYDER BROS INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2013 SNYDER BROS INC Produced Fluid 183.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2013 SNYDER BROS INC Produced Fluid 355.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 SNYDER BROS INC Produced Fluid 40.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 SNYDER BROS INC Produced Fluid 115.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 SNYDER BROS INC Produced Fluid 152.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2015 SNYDER BROS INC Produced Fluid 52.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2016 SNYDER BROS INC Produced Fluid 60.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 SNYDER BROS INC 28.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 SNYDER BROS INC Produced Fluid 28.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 SNYDER BROS INC Produced Fluid 49.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 67.00 Bbl INJECTION DISPOSAL WELL 34-099-23158

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1819333 Primary Facility 2009-08-06 Drilling/Alteration No Violations Noted MARCELLUS - drilling in process @ 5480ft/E&S ok/ID&pit ok
1819337 Primary Facility 2009-07-30 Drilling/Alteration No Violations Noted MARCELLUS - drilling in process/E&S ok/ID& pit ok
1847629 Primary Facility 2009-11-04 Routine/Complete Inspection No Violations Noted Well site has been drilled, well is not equipped for production. The pit appears to be sound. The Site ID sign and E&S plan are present. E&S controls such as silt fence and rocked culverts have been installed. There is no evidence of accelerated erosion or sedimentation on the access road or well site.
1874932 Primary Facility 2010-03-26 Routine/Complete Inspection No Violations Noted Well site has been drilled, well is equipped for production. The tank appears to be sound. The tag was located. E&S controls such as silt fence and rocked culverts have been installed. There is no evidence of accelerated erosion or sedimentation on the access road or well site. The site needs to be seeded and mulched before restoration activities are complete.
2160823 Primary Facility 2013-04-08 Routine/Complete Inspection No Violations Noted Site was restored and equipped for production. No E&S issues were noted. Production equipment and both brine tanks appeared to be in good condition.
2211127 Primary Facility 2013-10-02 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2216884 Primary Facility 2013-10-28 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production and brine tanks were located onsite. Brine tanks appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the access road.
2339348 Primary Facility 2015-01-27 Routine/Complete Inspection No Violations Noted Producing gas. Tag & tank. Site snow covered.
2556488 Primary Facility 2017-01-30 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production, brine tanks located onsite. Brine tanks appeared to be in sound condition. No accelerated erosion or sedimentation observed in relation to the site or access road.
2612556 Primary Facility 2017-07-06 Routine/Complete Inspection No Violations Noted Well tagged-on-annulus open. Well head casing -production set equipment-grounded 100 bbl fiberglass tank look ok.

For data sources see[7]

References