If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-005-30390 | | Well ID: 37-005-30390 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.867101, -79.548496 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: SAMUEL W MONTGOMERY 2-109 | | Farm/Lease Name: SAMUEL W MONTGOMERY 2-109 | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
| Permit Date: 2009-06-30 | | Permit Date: 2009-06-30 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
|- | |- | ||
| Configuration: Vertical Well | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: Yes | ||
|- | |- | ||
| Latitude: 40.867101 | | Latitude: 40.867101 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2009-06-30 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2010-04-02 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2010-04-09 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2010-05-12 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2013-05-15 | ||
+ | | NEWLY DRILLED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 71: | Line 101: | ||
!scope="col" | Job Percentage by Mass | !scope="col" | Job Percentage by Mass | ||
!scope="col" | Mass Used (lb) | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
|- | |- | ||
|}--> | |}--> | ||
Line 168: | Line 209: | ||
| 2019 | | 2019 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 8,475.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 351 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 193: | Line 234: | ||
| 2010 | | 2010 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 725.00 Bbl | | style="text-align: right;" | 725.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
Line 200: | Line 241: | ||
| 2011 | | 2011 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 95.00 Bbl | | style="text-align: right;" | 95.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
Line 214: | Line 248: | ||
| 2011 | | 2011 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 90.00 Bbl | | style="text-align: right;" | 90.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| 34-049-23127 | | 34-049-23127 | ||
|- | |- | ||
− | | | + | | 2011 |
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 310.00 Bbl |
− | | | + | | CENTRALIZED TREATMENT PLANT FOR RECYCLE |
− | | | + | | PA0101508 |
|- | |- | ||
| 2012 | | 2012 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 100.00 Bbl | | style="text-align: right;" | 100.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| WMGR123SW008 | | WMGR123SW008 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[SNYDER BROS INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 80.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-21893 | ||
|- | |- | ||
| 2013 | | 2013 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 96.00 Bbl | | style="text-align: right;" | 96.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 242: | Line 283: | ||
| 2014 | | 2014 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
+ | | style="text-align: right;" | 93.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-21438 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[SNYDER BROS INC]] | ||
+ | | Produced Fluid | ||
| style="text-align: right;" | 30.00 Bbl | | style="text-align: right;" | 30.00 Bbl | ||
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
| WMGR123NW009 | | WMGR123NW009 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2015 | | 2015 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 93.00 Bbl | | style="text-align: right;" | 93.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 263: | Line 304: | ||
| 2016 | | 2016 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 198.00 Bbl | | style="text-align: right;" | 198.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 270: | Line 311: | ||
| 2016 | | 2016 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 262.00 Bbl | | style="text-align: right;" | 262.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 277: | Line 318: | ||
| 2017 | | 2017 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 893.00 Bbl | | style="text-align: right;" | 893.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 284: | Line 325: | ||
| 2017 | | 2017 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | |
+ | | style="text-align: right;" | 593.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-23223 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[SNYDER BROS INC]] | ||
+ | |||
+ | | style="text-align: right;" | 251.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-23196 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[SNYDER BROS INC]] | ||
+ | | Produced Fluid | ||
| style="text-align: right;" | 485.00 Bbl | | style="text-align: right;" | 485.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 291: | Line 346: | ||
| 2018 | | 2018 | ||
| [[SNYDER BROS INC]] | | [[SNYDER BROS INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 411.00 Bbl | | style="text-align: right;" | 411.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-099-23158 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[SNYDER BROS INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 70.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| 34-099-23158 | | 34-099-23158 |
Well ID: 37-005-30390 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.867101,"lon":-79.548496,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: East Franklin Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 147435 | |
Farm/Lease Name: SAMUEL W MONTGOMERY 2-109 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-06-30 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.867101 | |
Longitude: -79.548496 |
Date | Event |
---|---|
2009-06-30 | New Permit Application |
2010-04-02 | Performed Spud Operation |
2010-04-09 | Drilling Completion |
2010-05-12 | Perforation |
2013-05-15 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | SNYDER BROS INC | 27,729.50 | 159 | 0.00 | 0 | 0.00 | 0 |
2011 | SNYDER BROS INC | 31,276.00 | 291 | 0.00 | 0 | 0.00 | 0 |
2012 | SNYDER BROS INC | 24,976.00 | 355 | 0.00 | 0 | 0.00 | 0 |
2013 | SNYDER BROS INC | 24,540.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2014 | SNYDER BROS INC | 21,560.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2015 | SNYDER BROS INC | 9,529.00 | 198 | 0.00 | 0 | 0.00 | 0 |
2016 | SNYDER BROS INC | 13,384.00 | 229 | 0.00 | 0 | 0.00 | 0 |
2017 | SNYDER BROS INC | 17,805.00 | 343 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 11,071.00 | 354 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 8,475.00 | 351 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | SNYDER BROS INC | Produced Fluid | 725.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | SNYDER BROS INC | Produced Fluid | 95.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 525-1 |
2011 | SNYDER BROS INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-049-23127 |
2011 | SNYDER BROS INC | Produced Fluid | 310.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2012 | SNYDER BROS INC | Produced Fluid | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW008 |
2012 | SNYDER BROS INC | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2013 | SNYDER BROS INC | Produced Fluid | 96.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2014 | SNYDER BROS INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | SNYDER BROS INC | Produced Fluid | 30.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | SNYDER BROS INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2016 | SNYDER BROS INC | Produced Fluid | 198.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2016 | SNYDER BROS INC | Produced Fluid | 262.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2017 | SNYDER BROS INC | Produced Fluid | 893.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2017 | SNYDER BROS INC | 593.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 | |
2017 | SNYDER BROS INC | 251.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 | |
2017 | SNYDER BROS INC | Produced Fluid | 485.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | SNYDER BROS INC | Produced Fluid | 411.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | SNYDER BROS INC | Produced Fluid | 70.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1879932 | Primary Facility | 2010-04-21 | Drilling/Alteration | No Violations Noted | MARCELLUS - drilling completed awaiting frac/E&S ok/ID&pit ok |
1882551 | Primary Facility | 2010-04-07 | Routine/Complete Inspection | No Violations Noted | Drill rig is on-site. Pit appears to be in sound condition. The Site ID sign and E&S plan are present. E&S controls such as silt fence and rocked culverts have been installed. There is no evidence of accelerated erosion or sedimentation on the access road or well site. |
2004236 | Primary Facility | 2011-09-21 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and appeared to be in sound condition. Site had been properly restored and no accelerated erosion or sedimentation was observed in relation to the access road or well-site. |
2082743 | Primary Facility | 2012-07-12 | Site Restoration | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The associated well apparatus and brine tanks located onsite appear to be in sound condition. The site is restored and meets the 70% uniform vegetative coverage criteria. |
2234836 | Primary Facility | 2014-01-08 | Routine/Complete Inspection | No Violations Noted | Well operating and properly identified. |
2393377 | Primary Facility | 2015-07-29 | Routine/Complete Inspection | No Violations Noted | Well was not equipped for production. Well was disconnected from well production apparatus located onsite at the time of the inspection. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2496652 | Primary Facility | 2016-06-23 | Routine/Complete Inspection | No Violations Noted | Well was tagged and in production. Annulus was shut. Well head casing-producton set equipment-2 grounded 100 bbl fiberglass tanks looked ok. |
For data sources see[7]