If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(5 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-005-30824 | | Well ID: 37-005-30824 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.825097, -79.475550 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Pennsylvania |
|- | |- | ||
− | | | + | | County: [[Armstrong_County,_Pennsylvania|Armstrong]] |
|- | |- | ||
− | | | + | | Municipality: [[Rayburn Township,_Armstrong_County,_Pennsylvania|Rayburn Township]] |
|- | |- | ||
− | | | + | | Operator Name: [[EXCO RESOURCES PA LLC]] |
|- | |- | ||
− | | | + | | Well Pad ID: |
|- | |- | ||
− | | | + | | Farm/Lease Name: SCHRECENGOST PAD 8 UNIT 1H |
|- | |- | ||
− | | | + | | License Status: |
|- | |- | ||
− | | | + | | Spud Date: |
+ | |- | ||
+ | | Permit Date: 2011-05-05 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
+ | |- | ||
+ | | Unconventional Well: Y | ||
+ | |- | ||
+ | | Configuration: Horizontal Well | ||
+ | |- | ||
+ | | Conservation: Yes | ||
|- | |- | ||
| Latitude: 40.825097 | | Latitude: 40.825097 | ||
|- | |- | ||
− | | Longitude: -79. | + | | Longitude: -79.475550 |
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2011-05-05 | ||
+ | | New Permit Application | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator Name | ||
+ | !scope="col" | Gas Quantity (mcf) | ||
+ | !scope="col" | Gas Production Days | ||
+ | !scope="col" | Oil Quantity (bbl) | ||
+ | !scope="col" | Oil Production Days | ||
+ | !scope="col" | Water Quantity (bbl) | ||
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[EXCO RESOURCES PA INC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Waste Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
+ | !scope="col" | Waste Type | ||
+ | !scope="col" | Quantity | ||
+ | !scope="col" | Disposal Method | ||
+ | !scope="col" | Waste Facility ID | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
+ | !scope="col" | Inspection Comments | ||
|- | |- | ||
| 1975194 | | 1975194 | ||
+ | | Primary Facility | ||
| 2011-05-20 | | 2011-05-20 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Site inspection performed as a result of phone conversation with Ted Parrish regarding additional erosion controls related to capturing and conveying springs so as to insure the stability of the constructed well pad and to minimize accelerated erosion & sedimentation. In addition the site construction contractor had voluntarily ceased earth moving activities due to the weather conditions and saturation of the soils. Contractor stated that the piping for the springs and remaining sediment trap construction will begin in earnest Saturday May 21st. Observed no evidence of accelerated erosion or off-site transport of sediment. All erosion controls had been implemented so far in line with the E&S plan included with ESCGP ESX10-005-004. | | Site inspection performed as a result of phone conversation with Ted Parrish regarding additional erosion controls related to capturing and conveying springs so as to insure the stability of the constructed well pad and to minimize accelerated erosion & sedimentation. In addition the site construction contractor had voluntarily ceased earth moving activities due to the weather conditions and saturation of the soils. Contractor stated that the piping for the springs and remaining sediment trap construction will begin in earnest Saturday May 21st. Observed no evidence of accelerated erosion or off-site transport of sediment. All erosion controls had been implemented so far in line with the E&S plan included with ESCGP ESX10-005-004. | ||
− | |||
− | |||
|- | |- | ||
| 1981431 | | 1981431 | ||
+ | | Primary Facility | ||
| 2011-06-17 | | 2011-06-17 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Construction was underway for the second of the two impoundments to be located onsite. The reminder of the site had been constructed and all E&S controls had been implemented as outlined in the ESCGP-1. No accelerated erosion or sedimentation was observed on the well-site or access road. The operator should inspect the erosion controls and sediment traps as outlined in the ESCGP-1 to insure their continued functionality. | | Construction was underway for the second of the two impoundments to be located onsite. The reminder of the site had been constructed and all E&S controls had been implemented as outlined in the ESCGP-1. No accelerated erosion or sedimentation was observed on the well-site or access road. The operator should inspect the erosion controls and sediment traps as outlined in the ESCGP-1 to insure their continued functionality. | ||
− | |||
− | |||
|- | |- | ||
| 2001552 | | 2001552 | ||
+ | | Primary Facility | ||
| 2011-09-08 | | 2011-09-08 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Drilling was ongoing at the time of the inspection. Inspection found a minor erosion issue related to the area below the impoundments. Consulted onsite with operator representative Ted Parrish and he informed WQS Higgins that an additional filter sock will be added to the two current socks in pyramid fashion, that additional rock will be added to the low point below the impoundments, in addition to seeding and mulching to provide temporary stabilization. In one of the well stimulation impoundments located onsite a small bubble was observed. There was minimal water observed in the pit and this was attributed to precipitation. Informed Mr. Parrish of the Department¿s concerns about this bubble, and suggested that it would be better to evaluate this issue and address it at this time than to let it prolong and possibly grow into a larger problem as the onsite impoundment is put into use. Requested that Mr. Parrish contact WQS Higgins via phone once EXCO has decided upon a course of action to address the impoundment issue. | | Drilling was ongoing at the time of the inspection. Inspection found a minor erosion issue related to the area below the impoundments. Consulted onsite with operator representative Ted Parrish and he informed WQS Higgins that an additional filter sock will be added to the two current socks in pyramid fashion, that additional rock will be added to the low point below the impoundments, in addition to seeding and mulching to provide temporary stabilization. In one of the well stimulation impoundments located onsite a small bubble was observed. There was minimal water observed in the pit and this was attributed to precipitation. Informed Mr. Parrish of the Department¿s concerns about this bubble, and suggested that it would be better to evaluate this issue and address it at this time than to let it prolong and possibly grow into a larger problem as the onsite impoundment is put into use. Requested that Mr. Parrish contact WQS Higgins via phone once EXCO has decided upon a course of action to address the impoundment issue. | ||
− | |||
− | |||
|- | |- | ||
| 2008789 | | 2008789 | ||
+ | | Primary Facility | ||
| 2011-07-28 | | 2011-07-28 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
− | | Construction of the site had been completed. Drill rig was in the process of being moved onsite and this should be completed within the next few days. One of the impoundments had the felt liner placed. All of the erosion controls had been implemented as outlined in the renderings in the ESCGP-1 for the site. No accelerated erosion or sedimentation was observed while onsite. Noted that vegetation had begun to take hold on the slopes associated with the site. | + | | Construction of the site had been completed. Drill rig was in the process of being moved onsite and this should be completed within the next few days. One of the impoundments had the felt liner placed. All of the erosion controls had been implemented as outlined in the renderings in the ESCGP-1 for the site. No accelerated erosion or sedimentation was observed while onsite. Noted that vegetation had begun to take hold on the slopes associated with the site. |
− | |||
|- | |- | ||
|} | |} | ||
− | == | + | <!--==== Violations Commited ==== |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Violation ID |
− | !scope="col" | | + | !scope="col" | Violation Date |
− | !scope="col" | | + | !scope="col" | Date Resolved |
− | !scope="col" | | + | !scope="col" | Violation Code |
− | !scope="col" | | + | !scope="col" | Violation Type |
− | !scope="col" | | + | !scope="col" | Violation Comments |
|- | |- | ||
− | | | + | |}--> |
− | + | <!--==== Penalties Applied ==== | |
− | + | {| class="wikitable sortable" width="95%" | |
− | | | + | !scope="col" | Violation ID |
− | + | !scope="col" | Penalty ID | |
− | + | !scope="col" | Penalty Code | |
− | + | !scope="col" | Penalty Status | |
− | + | !scope="col" | Penalty Date | |
− | + | !scope="col" | Enforcement Date | |
− | + | !scope="col" | Penalty Amount | |
− | + | !scope="col" | Amount Collected | |
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | |} | + | |}--> |
− | + | For data sources see<ref>{{cite web | |
− | + | | title =Oil and Gas Compliance Report | |
− | + | |publisher = [[Pennsylvania Department of Environmental Protection]] | |
− | + | | date = 2019-05-20 | |
− | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | |
− | + | | accessdate = 2019-05-21 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Pennsylvania Wells]] |
Well ID: 37-005-30824 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.825097,"lon":-79.47555,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Rayburn Township | |
Operator Name: EXCO RESOURCES PA LLC | |
Well Pad ID: | |
Farm/Lease Name: SCHRECENGOST PAD 8 UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-05-05 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.825097 | |
Longitude: -79.475550 |
Date | Event |
---|---|
2011-05-05 | New Permit Application |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | EXCO RESOURCES PA INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1975194 | Primary Facility | 2011-05-20 | Routine/Complete Inspection | No Violations Noted | Site inspection performed as a result of phone conversation with Ted Parrish regarding additional erosion controls related to capturing and conveying springs so as to insure the stability of the constructed well pad and to minimize accelerated erosion & sedimentation. In addition the site construction contractor had voluntarily ceased earth moving activities due to the weather conditions and saturation of the soils. Contractor stated that the piping for the springs and remaining sediment trap construction will begin in earnest Saturday May 21st. Observed no evidence of accelerated erosion or off-site transport of sediment. All erosion controls had been implemented so far in line with the E&S plan included with ESCGP ESX10-005-004. |
1981431 | Primary Facility | 2011-06-17 | Routine/Complete Inspection | No Violations Noted | Construction was underway for the second of the two impoundments to be located onsite. The reminder of the site had been constructed and all E&S controls had been implemented as outlined in the ESCGP-1. No accelerated erosion or sedimentation was observed on the well-site or access road. The operator should inspect the erosion controls and sediment traps as outlined in the ESCGP-1 to insure their continued functionality. |
2001552 | Primary Facility | 2011-09-08 | Routine/Complete Inspection | No Violations Noted | Drilling was ongoing at the time of the inspection. Inspection found a minor erosion issue related to the area below the impoundments. Consulted onsite with operator representative Ted Parrish and he informed WQS Higgins that an additional filter sock will be added to the two current socks in pyramid fashion, that additional rock will be added to the low point below the impoundments, in addition to seeding and mulching to provide temporary stabilization. In one of the well stimulation impoundments located onsite a small bubble was observed. There was minimal water observed in the pit and this was attributed to precipitation. Informed Mr. Parrish of the Department¿s concerns about this bubble, and suggested that it would be better to evaluate this issue and address it at this time than to let it prolong and possibly grow into a larger problem as the onsite impoundment is put into use. Requested that Mr. Parrish contact WQS Higgins via phone once EXCO has decided upon a course of action to address the impoundment issue. |
2008789 | Primary Facility | 2011-07-28 | Routine/Complete Inspection | No Violations Noted | Construction of the site had been completed. Drill rig was in the process of being moved onsite and this should be completed within the next few days. One of the impoundments had the felt liner placed. All of the erosion controls had been implemented as outlined in the renderings in the ESCGP-1 for the site. No accelerated erosion or sedimentation was observed while onsite. Noted that vegetation had begun to take hold on the slopes associated with the site. |
For data sources see[6]