If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
|||
(14 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
+ | __TOC__ | ||
== Well Details == | == Well Details == | ||
− | {| class="wikitable" width="95%" | + | {| class="wikitable welldetails" width="95%" |
− | | Well ID: 005-31097 | + | | Well ID: 37-005-31097 |
− | | style=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.742906, -79.670406 | width=100% | height=100% }} |
+ | |- | ||
+ | | Country: United States | ||
+ | |- | ||
+ | | State: Pennsylvania | ||
|- | |- | ||
− | | County: [[ | + | | County: [[Armstrong_County,_Pennsylvania|Armstrong]] |
|- | |- | ||
− | | Municipality: [[South Buffalo Township, | + | | Municipality: [[South Buffalo Township,_Armstrong_County,_Pennsylvania|South Buffalo Township]] |
|- | |- | ||
− | | Operator Name: [[XTO ENERGY INC| | + | | Operator Name: [[XTO ENERGY INC]] |
+ | |- | ||
+ | | Well Pad ID: [[144660]] | ||
|- | |- | ||
| Farm/Lease Name: TERRY BOWSER A UNIT 3H | | Farm/Lease Name: TERRY BOWSER A UNIT 3H | ||
|- | |- | ||
− | | | + | | License Status: INACTIVE |
+ | |- | ||
+ | | Spud Date: | ||
+ | |- | ||
+ | | Permit Date: 2012-08-31 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
+ | |- | ||
+ | | Unconventional Well: Y | ||
+ | |- | ||
+ | | Configuration: Horizontal Well | ||
|- | |- | ||
− | | | + | | Conservation: No |
|- | |- | ||
− | | | + | | Latitude: 40.742906 |
|- | |- | ||
− | | | + | | Longitude: -79.670406 |
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
|- | |- | ||
− | | | + | | 2012-08-31 |
+ | | New Permit Application | ||
|- | |- | ||
− | | | + | | 2012-10-26 |
+ | | Performed Spud Operation | ||
|- | |- | ||
− | | | + | | 2012-11-24 |
+ | | Drilling Completion | ||
|- | |- | ||
− | | | + | | 2013-02-07 |
+ | | Perforation | ||
|- | |- | ||
− | | | + | | 2013-11-27 |
+ | | DEVIATED | ||
|- | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | == | + | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources |
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | == Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | | 1 | ||
+ | | 2013-03-13 | ||
+ | | 2013-03-22 | ||
+ | | style="text-align: right;" | 6,520 | ||
+ | | style="text-align: right;" | 5,550,850 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | ==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="23"| 1 | ||
+ | | rowspan="1"| Sand (Proppant) | ||
+ | | rowspan="1"| Nabors | ||
+ | | rowspan="1"| Proppant | ||
+ | | Silica Substrate | ||
+ | | NA | ||
+ | | style="text-align: right;" | 100 | ||
+ | | style="text-align: right;" | 10.5778 | ||
+ | | style="text-align: right;" | 5,518,700.0 | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="5"| Acid Corrosion Inhibitor, A12 | ||
+ | | rowspan="5"| Nabors | ||
+ | | rowspan="5"| Corrosion Inhibitor | ||
+ | | Isopropyl Alcohol | ||
+ | | 67-63-0 | ||
+ | | style="text-align: right;" | 30 | ||
+ | | style="text-align: right;" | 0.000209455 | ||
+ | | style="text-align: right;" | 109.278 | ||
+ | |- | ||
+ | | Propargyl Alcohol | ||
+ | | 107-19-7 | ||
+ | | style="text-align: right;" | 30 | ||
+ | | style="text-align: right;" | 0.000209455 | ||
+ | | style="text-align: right;" | 109.278 | ||
+ | |- | ||
+ | | Proprietary Component | ||
+ | | NA | ||
+ | | style="text-align: right;" | 7 | ||
+ | | style="text-align: right;" | 0.00004887 | ||
+ | | style="text-align: right;" | 25.498 | ||
+ | |- | ||
+ | | Short Chained glycol ether | ||
+ | | 112-34-5 | ||
+ | | style="text-align: right;" | 30 | ||
+ | | style="text-align: right;" | 0.000209455 | ||
+ | | style="text-align: right;" | 109.278 | ||
+ | |- | ||
+ | | Other -(non hazardous) | ||
+ | | NA | ||
+ | | style="text-align: right;" | 3 | ||
+ | | style="text-align: right;" | 0.00002095 | ||
+ | | style="text-align: right;" | 10.928 | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="2"| Hydrochloric Acid (7.5%) | ||
+ | | rowspan="2"| PPG Industries | ||
+ | | rowspan="2"| Acidizing | ||
+ | | Hydrochloric Acid | ||
+ | | 7647-01-0 | ||
+ | | style="text-align: right;" | 7.5 | ||
+ | | style="text-align: right;" | 0.0120922 | ||
+ | | style="text-align: right;" | 6308.82 | ||
+ | |- | ||
+ | | Other - (non-hazardous) | ||
+ | | NA | ||
+ | | style="text-align: right;" | 92.5 | ||
+ | | style="text-align: right;" | 0.149137 | ||
+ | | style="text-align: right;" | 77808.8 | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="3"| Biocide KR-153SL | ||
+ | | rowspan="3"| Nabors | ||
+ | | rowspan="3"| Biocide | ||
+ | | Other -(non hazardous) | ||
+ | | NA | ||
+ | | style="text-align: right;" | 30 | ||
+ | | style="text-align: right;" | 0.00636402 | ||
+ | | style="text-align: right;" | 3320.27 | ||
+ | |- | ||
+ | | Polyethylene Glycol | ||
+ | | 25322-68-3 | ||
+ | | style="text-align: right;" | 50 | ||
+ | | style="text-align: right;" | 0.0106067 | ||
+ | | style="text-align: right;" | 5533.78 | ||
+ | |- | ||
+ | | 2,2-Dibromo-3-nitrilo-propionamide | ||
+ | | 10222-01-2 | ||
+ | | style="text-align: right;" | 20 | ||
+ | | style="text-align: right;" | 0.00424268 | ||
+ | | style="text-align: right;" | 2213.51 | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="2"| Hydrochloric Acid (15%) | ||
+ | | rowspan="2"| PPG Industries | ||
+ | | rowspan="2"| Acidizing | ||
+ | | Hydrochloric Acid | ||
+ | | 7647-01-0 | ||
+ | | style="text-align: right;" | 15 | ||
+ | | style="text-align: right;" | 0.057774 | ||
+ | | style="text-align: right;" | 30142.1 | ||
+ | |- | ||
+ | | Other - (non-hazardous) | ||
+ | | NA | ||
+ | | style="text-align: right;" | 85 | ||
+ | | style="text-align: right;" | 0.327386 | ||
+ | | style="text-align: right;" | 170805 | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="4"| Scale Inhibitor, TSC | ||
+ | | rowspan="4"| Nabors | ||
+ | | rowspan="4"| Scale Inhibitor | ||
+ | | 2-Phosphonobutane-1,2,4-tricarboxylic acid, potassium salt | ||
+ | | 93858-78-7 | ||
+ | | style="text-align: right;" | 15 | ||
+ | | style="text-align: right;" | 0.00153934 | ||
+ | | style="text-align: right;" | 803.11 | ||
+ | |- | ||
+ | | Propylene glycol | ||
+ | | 57-55-6 | ||
+ | | style="text-align: right;" | 40 | ||
+ | | style="text-align: right;" | 0.00410489 | ||
+ | | style="text-align: right;" | 2141.63 | ||
+ | |- | ||
+ | | Anionic copolymer | ||
+ | | NA | ||
+ | | style="text-align: right;" | 15 | ||
+ | | style="text-align: right;" | 0.00153934 | ||
+ | | style="text-align: right;" | 803.11 | ||
+ | |- | ||
+ | | Other -(non hazardous) | ||
+ | | NA | ||
+ | | style="text-align: right;" | 15 | ||
+ | | style="text-align: right;" | 0.00153934 | ||
+ | | style="text-align: right;" | 803.11 | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="5"| Friction Reducer, WFR-3B | ||
+ | | rowspan="5"| Nabors | ||
+ | | rowspan="5"| Friction Reducer | ||
+ | | Hydrotreated light distillates (10-30%) | ||
+ | | 64742-47-8 | ||
+ | | style="text-align: right;" | 50 | ||
+ | | style="text-align: right;" | 0.0288999 | ||
+ | | style="text-align: right;" | 15077.8 | ||
+ | |- | ||
+ | | Propylene glycol | ||
+ | | 57-55-6 | ||
+ | | style="text-align: right;" | 15 | ||
+ | | style="text-align: right;" | 0.00866996 | ||
+ | | style="text-align: right;" | 4523.34 | ||
+ | |- | ||
+ | | Ethoxylated oleylamine | ||
+ | | 26635-93-8 | ||
+ | | style="text-align: right;" | 5 | ||
+ | | style="text-align: right;" | 0.00288999 | ||
+ | | style="text-align: right;" | 1507.78 | ||
+ | |- | ||
+ | | Other -(non hazardous) | ||
+ | | NA | ||
+ | | style="text-align: right;" | 15 | ||
+ | | style="text-align: right;" | 0.00866996 | ||
+ | | style="text-align: right;" | 4523.34 | ||
+ | |- | ||
+ | | Ethoxylated Alcohol Blend | ||
+ | | NA | ||
+ | | style="text-align: right;" | 15 | ||
+ | | style="text-align: right;" | 0.00866996 | ||
+ | | style="text-align: right;" | 4523.34 | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="1"| Water | ||
+ | | rowspan="1"| XTO | ||
+ | | rowspan="1"| Carrier/Base Fluid | ||
+ | | Water | ||
+ | | 7732-18-5 | ||
+ | | style="text-align: right;" | 100 | ||
+ | | style="text-align: right;" | 88.7858 | ||
+ | | style="text-align: right;" | 46,321,800.0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =FracFocus Fracking Chemicals Database | ||
+ | | date = 2019-04-02 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-06-19 }}</ref> | ||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator Name | ||
+ | !scope="col" | Gas Quantity (mcf) | ||
+ | !scope="col" | Gas Production Days | ||
+ | !scope="col" | Oil Quantity (bbl) | ||
+ | !scope="col" | Oil Production Days | ||
+ | !scope="col" | Water Quantity (bbl) | ||
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 773,015.00 | ||
+ | | style="text-align: right;" | 331 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 1,242,188.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 859,453.75 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 594,510.40 | ||
+ | | style="text-align: right;" | 348 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
+ | !scope="col" | Waste Type | ||
+ | !scope="col" | Quantity | ||
+ | !scope="col" | Disposal Method | ||
+ | !scope="col" | Waste Facility ID | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Drill Cuttings | ||
+ | | style="text-align: right;" | 16.92 Tons | ||
+ | | LANDFILL | ||
+ | | 100403 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 634.20 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NW009 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 424.00 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123NW009 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | |||
+ | | style="text-align: right;" | 1,709.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NW009 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 243.70 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-133-24096 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | |||
+ | | style="text-align: right;" | 118.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-133-24096 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 110.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 2,585.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NW009 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 330.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-133-24189 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 2,256.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NW009 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 120.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-133-24189 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 864.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NW009 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 213.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-133-24096 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 159.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-133-24189 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Waste Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
+ | !scope="col" | Inspection Comments | ||
|- | |- | ||
| 2102838 | | 2102838 | ||
+ | | Primary Facility | ||
| 2012-09-26 | | 2012-09-26 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Meeting onsite with Operator to discuss the construction plan and timeline of the Terry Bowser A Unit well pad. At the time of inspection the well pad and access road had been surveyed but no earth movement had been conducted. After reviewing the plan the Department and Operator discussed the precaution regarding the HQ watershed and stream. The Department suggests all ABACT perimeter controls are installed prior to earth disturbance and the Operator monitor the site weekly and after significant precipitation event to ensure the site stability in maintained. | | Meeting onsite with Operator to discuss the construction plan and timeline of the Terry Bowser A Unit well pad. At the time of inspection the well pad and access road had been surveyed but no earth movement had been conducted. After reviewing the plan the Department and Operator discussed the precaution regarding the HQ watershed and stream. The Department suggests all ABACT perimeter controls are installed prior to earth disturbance and the Operator monitor the site weekly and after significant precipitation event to ensure the site stability in maintained. | ||
− | |||
− | |||
|- | |- | ||
| 2111668 | | 2111668 | ||
+ | | Primary Facility | ||
| 2012-10-31 | | 2012-10-31 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection the Operator was in the process of moving equipment onto the well pad to start drilling. Spud notice received by the Department on 10/24/2012. The Department notes that after a significant rainfall event the BMP's associated with the wash rack located closest to the well pad are in need of routine maintenance. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the site stability in maintained. | | At the time of inspection the Operator was in the process of moving equipment onto the well pad to start drilling. Spud notice received by the Department on 10/24/2012. The Department notes that after a significant rainfall event the BMP's associated with the wash rack located closest to the well pad are in need of routine maintenance. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the site stability in maintained. | ||
− | |||
− | |||
|- | |- | ||
| 2116169 | | 2116169 | ||
+ | | Primary Facility | ||
| 2012-10-31 | | 2012-10-31 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| Moving in UDI rig#61 at time of inspection. | | Moving in UDI rig#61 at time of inspection. | ||
− | |||
− | |||
|- | |- | ||
| 2119407 | | 2119407 | ||
+ | | Primary Facility | ||
| 2012-11-29 | | 2012-11-29 | ||
+ | | Incident- Response to Accident or Event | ||
| In Compliance with Policy | | In Compliance with Policy | ||
| Site inspection performed as a follow-up to operator notification of a small spill of drilling mud alongside the access road. The spill occurred while moving equipment off-site on 11/28/12 at 11AM and XTO reported the spill on 11/28/12 shortly after 11AM. Spill was immediately cleaned up and no evidence was observed to indicate that further action was neccesary on the part of XTO to address the spill. Site and access road E&S controls had been implemented as outlined in the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. | | Site inspection performed as a follow-up to operator notification of a small spill of drilling mud alongside the access road. The spill occurred while moving equipment off-site on 11/28/12 at 11AM and XTO reported the spill on 11/28/12 shortly after 11AM. Spill was immediately cleaned up and no evidence was observed to indicate that further action was neccesary on the part of XTO to address the spill. Site and access road E&S controls had been implemented as outlined in the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. | ||
− | |||
|- | |- | ||
− | | | + | | 2170145 |
− | + | | Primary Facility | |
− | + | | 2013-05-23 | |
− | + | | Routine/Complete Inspection | |
− | + | | No Violations Noted | |
− | + | | Drilling appeared to have been completed, well was not equipped for production. Twelve covered roll-off boxes located onsite. These roll-off boxes did not have secondary containment. If these roll-off boxes contain pollutional materials related to flowback or stimulation additives to comply with the Unconventional well secondary containment requirements roll-off boxes of this nature should be placed on some sort of containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. | |
− | + | |- | |
− | + | | 2197056 | |
− | + | | Primary Facility | |
− | + | | 2013-08-19 | |
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Well appeared to be equipped for production. Brine tank located onsite within containment. Brine tank appeared to be in sound condition. There was no observed accelerated erosion in relation to the site or access road. | ||
+ | |- | ||
+ | | 2339891 | ||
+ | | Primary Facility | ||
+ | | 2015-01-30 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Well is regulatorily inactive. Brine tank located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. | ||
+ | |- | ||
+ | | 2400249 | ||
+ | | Primary Facility | ||
+ | | 2015-08-19 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Well appeared to be equipped for , but not in production. Brine tank located onsite and it appeared to be in sound condition. Site had been temporarily stabilized and there was no observed accelerated erosion or sedimentation in relation to the site or access road. | ||
+ | |- | ||
+ | | 2443614 | ||
+ | | Primary Facility | ||
+ | | 2016-01-26 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been temporarily stabilized and there was no observed accelerated erosion or sedimentation in relation to the site or access road. | ||
+ | |- | ||
+ | | 2481549 | ||
+ | | Primary Facility | ||
+ | | 2016-05-05 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been temporarily stabilized and there was no observed accelerated erosion or sedimentation in relation to the site or access road. | ||
+ | |- | ||
+ | | 2491292 | ||
+ | | Primary Facility | ||
+ | | 2016-06-07 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Well tagged-in production. Well head casing-equipment-produced fluid tank-dike looked ok. | ||
+ | |- | ||
+ | | 2539017 | ||
+ | | Primary Facility | ||
+ | | 2016-11-23 | ||
+ | | Site Restoration | ||
+ | | No Violations Noted | ||
+ | | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been effectively restored to the PCSM plan contained within the associated ESCGP, save for ongoing issues related to runoff from the neighboring golf course. Vegetation had attained 70 %uniform coverage. | ||
+ | |- | ||
+ | | 2592386 | ||
+ | | Primary Facility | ||
+ | | 2017-05-11 | ||
+ | | Site Restoration | ||
+ | | No Violations Noted | ||
+ | | Well appeared to be equipped for production. Brine tank located onsite within secondary containment. Both the tank and containment appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Vegetative cover had attained 70% uniform coverage and the well-site had been properly restored. | ||
+ | |- | ||
+ | | 2661105 | ||
+ | | Primary Facility | ||
+ | | 2017-11-16 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | At time of inspection, well drilled and appears equipped for production. Well site surrounded by fence. | ||
|- | |- | ||
− | | | + | | 2793780 |
− | | | + | | Primary Facility |
− | | | + | | 2018-10-24 |
− | | | + | | Routine/Complete Inspection |
− | | | + | | No Violations Noted |
− | | | + | | This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and large steel fluid collection tank look ok. |
− | |||
|- | |- | ||
|} | |} | ||
− | == | + | <!--==== Violations Commited ==== |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Violation ID |
− | + | !scope="col" | Violation Date | |
− | !scope="col" | | + | !scope="col" | Date Resolved |
− | !scope="col" | | + | !scope="col" | Violation Code |
− | + | !scope="col" | Violation Type | |
− | !scope="col" | | + | !scope="col" | Violation Comments |
− | !scope="col" | | ||
− | !scope="col" | | ||
|- | |- | ||
− | | | + | |}--> |
− | | | + | <!--==== Penalties Applied ==== |
− | | | + | {| class="wikitable sortable" width="95%" |
− | | | + | !scope="col" | Violation ID |
− | | | + | !scope="col" | Penalty ID |
− | | | + | !scope="col" | Penalty Code |
− | | | + | !scope="col" | Penalty Status |
− | | | + | !scope="col" | Penalty Date |
− | | | + | !scope="col" | Enforcement Date |
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
|- | |- | ||
− | |} | + | |}--> |
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Compliance Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | ==References== | ||
+ | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Pennsylvania Wells]] | ||
+ | [[Category:FracFocus]] |
Well ID: 37-005-31097 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.742906,"lon":-79.670406,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: South Buffalo Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 144660 | |
Farm/Lease Name: TERRY BOWSER A UNIT 3H | |
License Status: INACTIVE | |
Spud Date: | |
Permit Date: 2012-08-31 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.742906 | |
Longitude: -79.670406 |
Date | Event |
---|---|
2012-08-31 | New Permit Application |
2012-10-26 | Performed Spud Operation |
2012-11-24 | Drilling Completion |
2013-02-07 | Perforation |
2013-11-27 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-03-13 | 2013-03-22 | 6,520 | 5,550,850 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (Proppant) | Nabors | Proppant | Silica Substrate | NA | 100 | 10.5778 | 5,518,700.0 |
Acid Corrosion Inhibitor, A12 | Nabors | Corrosion Inhibitor | Isopropyl Alcohol | 67-63-0 | 30 | 0.000209455 | 109.278 | |
Propargyl Alcohol | 107-19-7 | 30 | 0.000209455 | 109.278 | ||||
Proprietary Component | NA | 7 | 0.00004887 | 25.498 | ||||
Short Chained glycol ether | 112-34-5 | 30 | 0.000209455 | 109.278 | ||||
Other -(non hazardous) | NA | 3 | 0.00002095 | 10.928 | ||||
Hydrochloric Acid (7.5%) | PPG Industries | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0120922 | 6308.82 | |
Other - (non-hazardous) | NA | 92.5 | 0.149137 | 77808.8 | ||||
Biocide KR-153SL | Nabors | Biocide | Other -(non hazardous) | NA | 30 | 0.00636402 | 3320.27 | |
Polyethylene Glycol | 25322-68-3 | 50 | 0.0106067 | 5533.78 | ||||
2,2-Dibromo-3-nitrilo-propionamide | 10222-01-2 | 20 | 0.00424268 | 2213.51 | ||||
Hydrochloric Acid (15%) | PPG Industries | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.057774 | 30142.1 | |
Other - (non-hazardous) | NA | 85 | 0.327386 | 170805 | ||||
Scale Inhibitor, TSC | Nabors | Scale Inhibitor | 2-Phosphonobutane-1,2,4-tricarboxylic acid, potassium salt | 93858-78-7 | 15 | 0.00153934 | 803.11 | |
Propylene glycol | 57-55-6 | 40 | 0.00410489 | 2141.63 | ||||
Anionic copolymer | NA | 15 | 0.00153934 | 803.11 | ||||
Other -(non hazardous) | NA | 15 | 0.00153934 | 803.11 | ||||
Friction Reducer, WFR-3B | Nabors | Friction Reducer | Hydrotreated light distillates (10-30%) | 64742-47-8 | 50 | 0.0288999 | 15077.8 | |
Propylene glycol | 57-55-6 | 15 | 0.00866996 | 4523.34 | ||||
Ethoxylated oleylamine | 26635-93-8 | 5 | 0.00288999 | 1507.78 | ||||
Other -(non hazardous) | NA | 15 | 0.00866996 | 4523.34 | ||||
Ethoxylated Alcohol Blend | NA | 15 | 0.00866996 | 4523.34 | ||||
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.7858 | 46,321,800.0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 773,015.00 | 331 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 1,242,188.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 859,453.75 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 594,510.40 | 348 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | XTO ENERGY INC | Drill Cuttings | 16.92 Tons | LANDFILL | 100403 |
2016 | XTO ENERGY INC | Produced Fluid | 634.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 424.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2017 | XTO ENERGY INC | 1,709.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 | |
2017 | XTO ENERGY INC | Produced Fluid | 243.70 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | 118.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 | |
2017 | XTO ENERGY INC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 2,585.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 330.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 2,256.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 864.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 213.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 159.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2102838 | Primary Facility | 2012-09-26 | Routine/Complete Inspection | No Violations Noted | Meeting onsite with Operator to discuss the construction plan and timeline of the Terry Bowser A Unit well pad. At the time of inspection the well pad and access road had been surveyed but no earth movement had been conducted. After reviewing the plan the Department and Operator discussed the precaution regarding the HQ watershed and stream. The Department suggests all ABACT perimeter controls are installed prior to earth disturbance and the Operator monitor the site weekly and after significant precipitation event to ensure the site stability in maintained. |
2111668 | Primary Facility | 2012-10-31 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator was in the process of moving equipment onto the well pad to start drilling. Spud notice received by the Department on 10/24/2012. The Department notes that after a significant rainfall event the BMP's associated with the wash rack located closest to the well pad are in need of routine maintenance. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the site stability in maintained. |
2116169 | Primary Facility | 2012-10-31 | Drilling/Alteration | No Violations Noted | Moving in UDI rig#61 at time of inspection. |
2119407 | Primary Facility | 2012-11-29 | Incident- Response to Accident or Event | In Compliance with Policy | Site inspection performed as a follow-up to operator notification of a small spill of drilling mud alongside the access road. The spill occurred while moving equipment off-site on 11/28/12 at 11AM and XTO reported the spill on 11/28/12 shortly after 11AM. Spill was immediately cleaned up and no evidence was observed to indicate that further action was neccesary on the part of XTO to address the spill. Site and access road E&S controls had been implemented as outlined in the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2170145 | Primary Facility | 2013-05-23 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed, well was not equipped for production. Twelve covered roll-off boxes located onsite. These roll-off boxes did not have secondary containment. If these roll-off boxes contain pollutional materials related to flowback or stimulation additives to comply with the Unconventional well secondary containment requirements roll-off boxes of this nature should be placed on some sort of containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2197056 | Primary Facility | 2013-08-19 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite within containment. Brine tank appeared to be in sound condition. There was no observed accelerated erosion in relation to the site or access road. |
2339891 | Primary Facility | 2015-01-30 | Routine/Complete Inspection | No Violations Noted | Well is regulatorily inactive. Brine tank located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2400249 | Primary Facility | 2015-08-19 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for , but not in production. Brine tank located onsite and it appeared to be in sound condition. Site had been temporarily stabilized and there was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2443614 | Primary Facility | 2016-01-26 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been temporarily stabilized and there was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2481549 | Primary Facility | 2016-05-05 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been temporarily stabilized and there was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2491292 | Primary Facility | 2016-06-07 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-equipment-produced fluid tank-dike looked ok. |
2539017 | Primary Facility | 2016-11-23 | Site Restoration | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been effectively restored to the PCSM plan contained within the associated ESCGP, save for ongoing issues related to runoff from the neighboring golf course. Vegetation had attained 70 %uniform coverage. |
2592386 | Primary Facility | 2017-05-11 | Site Restoration | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite within secondary containment. Both the tank and containment appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Vegetative cover had attained 70% uniform coverage and the well-site had been properly restored. |
2661105 | Primary Facility | 2017-11-16 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well drilled and appears equipped for production. Well site surrounded by fence. |
2793780 | Primary Facility | 2018-10-24 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and large steel fluid collection tank look ok. |
For data sources see[8]