X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-31097"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-31097
 
| Well ID: 37-005-31097
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.742905, -79.670405 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.742906, -79.670406 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Armstrong County, Pennsylvania|Armstrong]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[South Buffalo Township, Armstrong County, Pennsylvania|South Buffalo Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Armstrong_County,_Pennsylvania|Armstrong]]
 +
|-
 +
| Municipality: [[South Buffalo Township,_Armstrong_County,_Pennsylvania|South Buffalo Township]]
 
|-
 
|-
 
| Operator Name: [[XTO ENERGY INC]]
 
| Operator Name: [[XTO ENERGY INC]]
 
|-
 
|-
| Well Pad ID: [[144660|144660]]
+
| Well Pad ID: [[144660]]
 
|-
 
|-
 
| Farm/Lease Name: TERRY BOWSER A UNIT 3H
 
| Farm/Lease Name: TERRY BOWSER A UNIT 3H
 
|-
 
|-
| First Permit Date: 2012-08-31
+
| License Status: INACTIVE
|-
 
| Last Permit Date: 2012-08-31
 
 
|-
 
|-
| Spud Date: 2012-10-26
+
| Spud Date:  
 
|-
 
|-
| Unconventional: Yes
+
| Permit Date: 2012-08-31
 
|-
 
|-
| Horizontal: Yes
+
| Well Type: GAS
 
|-
 
|-
| Well Status: ACTIVE
+
| Unconventional Well: Y
 
|-
 
|-
| Violations: 0
+
| Configuration: Horizontal Well
 
|-
 
|-
| Latitude: 40.742905
+
| Conservation: No
 
|-
 
|-
| Longitude: -79.670405
+
| Latitude: 40.742906
 
|-
 
|-
 +
| Longitude: -79.670406
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Date
!scope="col" | GAS QUANTITY
+
!scope="col" | Event
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-2
+
| 2012-08-31
| style="text-align:right;" | 0.0
+
| New Permit Application
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2012-10-26
 +
| Performed Spud Operation
 
|-
 
|-
| 2013-1
+
| 2012-11-24
| style="text-align:right;" | 0.0
+
| Drilling Completion
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2013-02-07
 +
| Perforation
 
|-
 
|-
| 2013-2
+
| 2013-11-27
| style="text-align:right;" | 0.0
+
| DEVIATED
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| 2014-1
+
| 1
| style="text-align:right;" | 0.0
+
| 2013-03-13
| style="text-align:right;" | 0.0
+
| 2013-03-22
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 6,520
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 5,550,850
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
| 2014-2
+
|- valign="top"
| style="text-align:right;" | 0.0
+
| rowspan="23"| 1
| style="text-align:right;" | 0.0
+
| rowspan="1"| Sand (Proppant)
| style="text-align:right;" | 0.0
+
| rowspan="1"| Nabors
| style="text-align:right;" | 0.0
+
| rowspan="1"| Proppant
| style="text-align:right;" | 0.0
+
| Silica Substrate
| style="text-align:right;" | 0.0
+
| NA
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 10.5778
 +
| style="text-align: right;" | 5,518,700.0
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="5"| Acid Corrosion Inhibitor, A12
 +
| rowspan="5"| Nabors
 +
| rowspan="5"| Corrosion Inhibitor
 +
| Isopropyl Alcohol
 +
| 67-63-0
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.000209455
 +
| style="text-align: right;" | 109.278
 
|-
 
|-
| 2015-02
+
| Propargyl Alcohol
| style="text-align:right;" | 0.0
+
| 107-19-7
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 30
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.000209455
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 109.278
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| Proprietary Component
 +
| NA
 +
| style="text-align: right;" | 7
 +
| style="text-align: right;" | 0.00004887
 +
| style="text-align: right;" | 25.498
 
|-
 
|-
| 2015-01
+
| Short Chained glycol ether
| style="text-align:right;" | 0.0
+
| 112-34-5
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 30
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.000209455
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 109.278
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| Other -(non hazardous)
 +
| NA
 +
| style="text-align: right;" | 3
 +
| style="text-align: right;" | 0.00002095
 +
| style="text-align: right;" | 10.928
 
|-
 
|-
| 2015-03
+
|- valign="top"
| style="text-align:right;" | 0.0
+
| rowspan="2"| Hydrochloric Acid (7.5%)
| style="text-align:right;" | 0.0
+
| rowspan="2"| PPG Industries
| style="text-align:right;" | 0.0
+
| rowspan="2"| Acidizing
| style="text-align:right;" | 0.0
+
| Hydrochloric Acid
| style="text-align:right;" | 0.0
+
| 7647-01-0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 7.5
 +
| style="text-align: right;" | 0.0120922
 +
| style="text-align: right;" | 6308.82
 
|-
 
|-
|}
+
| Other - (non-hazardous)
For data sources see<ref>{{cite web
+
| NA
| title = Oil and Gas Historical Production Report
+
| style="text-align: right;" | 92.5
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| style="text-align: right;" | 0.149137
| date = 2015-05-26
+
| style="text-align: right;" | 77808.8
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-2
+
|- valign="top"
| DRILL CUTTINGS
+
| rowspan="3"| Biocide KR-153SL
| style="text-align:right;" | 16.92
+
| rowspan="3"| Nabors
| Tons
+
| rowspan="3"| Biocide
| LANDFILL
+
| Other -(non hazardous)
| 100403
+
| NA
| SENECA LANDFILL (AKA VOGEL LANDFILL)
+
| style="text-align: right;" | 30
| EVANS CITY
+
| style="text-align: right;" | 0.00636402
| PA
+
| style="text-align: right;" | 3320.27
 
|-
 
|-
|}
+
| Polyethylene Glycol
For data sources see<ref>{{cite web
+
| 25322-68-3
| title = Oil and Gas Historical Waste Report
+
| style="text-align: right;" | 50
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| style="text-align: right;" | 0.0106067
| date = 2015-05-26
+
| style="text-align: right;" | 5533.78
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | INSPECTION ID
 
!scope="col" | DATE
 
!scope="col" | DESCRIPTION
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
| 2102838
+
| 2,2-Dibromo-3-nitrilo-propionamide
| 2012-09-26
+
| 10222-01-2
| No Violations Noted
+
| style="text-align: right;" | 20
| Meeting onsite with Operator to discuss the construction plan and timeline of the Terry Bowser A Unit well pad.  At the time of inspection the well pad and access road had been surveyed but no earth movement had been conducted.  After reviewing the plan the Department and Operator discussed the precaution regarding the HQ watershed and stream.  The Department suggests all ABACT perimeter controls are installed prior to earth disturbance and the Operator monitor the site weekly and after significant precipitation event to ensure the site stability in maintained.
+
| style="text-align: right;" | 0.00424268
|  
+
| style="text-align: right;" | 2213.51
|
 
|  
 
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="2"| Hydrochloric Acid (15%)
 +
| rowspan="2"| PPG Industries
 +
| rowspan="2"| Acidizing
 +
| Hydrochloric Acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.057774
 +
| style="text-align: right;" | 30142.1
 
|-
 
|-
| 2111668
+
| Other - (non-hazardous)
| 2012-10-31
+
| NA
| No Violations Noted
+
| style="text-align: right;" | 85
| At the time of inspection the Operator was in the process of moving equipment onto the well pad to start drilling.  Spud notice received by the Department on 10/24/2012.  The Department notes that after a significant rainfall event the BMP's associated with the wash rack located closest to the well pad are in need of routine maintenance. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the site stability in maintained.
+
| style="text-align: right;" | 0.327386
|  
+
| style="text-align: right;" | 170805
|  
 
|  
 
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="4"| Scale Inhibitor, TSC
 +
| rowspan="4"| Nabors
 +
| rowspan="4"| Scale Inhibitor
 +
| 2-Phosphonobutane-1,2,4-tricarboxylic acid, potassium salt
 +
| 93858-78-7
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.00153934
 +
| style="text-align: right;" | 803.11
 
|-
 
|-
| 2116169
+
| Propylene glycol
| 2012-10-31
+
| 57-55-6
| No Violations Noted
+
| style="text-align: right;" | 40
| Moving in UDI rig#61 at time of inspection.
+
| style="text-align: right;" | 0.00410489
|  
+
| style="text-align: right;" | 2141.63
|
 
|  
 
 
|-
 
|-
 +
| Anionic copolymer
 +
| NA
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.00153934
 +
| style="text-align: right;" | 803.11
 
|-
 
|-
| 2119407
+
| Other -(non hazardous)
| 2012-11-29
+
| NA
| In Compliance with Policy
+
| style="text-align: right;" | 15
| Site inspection performed as a follow-up to operator notification of a small spill of drilling mud alongside the access road.  The spill occurred while moving equipment off-site on 11/28/12 at 11AM and XTO reported the spill on 11/28/12 shortly after 11AM.  Spill was immediately cleaned up and no evidence was observed to indicate that further action was neccesary on the part of XTO to address the spill.  Site and access road E&S controls had been implemented as outlined in the ESCGP.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.
+
| style="text-align: right;" | 0.00153934
|  
+
| style="text-align: right;" | 803.11
|
 
|  
 
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="5"| Friction Reducer, WFR-3B
 +
| rowspan="5"| Nabors
 +
| rowspan="5"| Friction Reducer
 +
| Hydrotreated light distillates (10-30%)
 +
| 64742-47-8
 +
| style="text-align: right;" | 50
 +
| style="text-align: right;" | 0.0288999
 +
| style="text-align: right;" | 15077.8
 
|-
 
|-
| 2170145
+
| Propylene glycol
| 2013-05-23
+
| 57-55-6
| No Violations Noted
+
| style="text-align: right;" | 15
| Drilling appeared to have been completed, well was not equipped for production.  Twelve covered roll-off boxes located onsite.  These roll-off boxes did not have secondary containment.  If these roll-off boxes contain pollutional materials related to flowback or stimulation additives to comply with the Unconventional well secondary containment requirements roll-off boxes of this nature should be placed on some sort of containment.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.
+
| style="text-align: right;" | 0.00866996
|  
+
| style="text-align: right;" | 4523.34
|
 
|  
 
 
|-
 
|-
 +
| Ethoxylated oleylamine
 +
| 26635-93-8
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00288999
 +
| style="text-align: right;" | 1507.78
 
|-
 
|-
| 2197056
+
| Other -(non hazardous)
| 2013-08-19
+
| NA
| No Violations Noted
+
| style="text-align: right;" | 15
| Well appeared to be equipped for production.  Brine tank located onsite within containment. Brine tank appeared to be in sound condition.  There was no observed accelerated erosion in relation to the site or access road.
+
| style="text-align: right;" | 0.00866996
|  
+
| style="text-align: right;" | 4523.34
|
 
|  
 
 
|-
 
|-
 +
| Ethoxylated Alcohol Blend
 +
| NA
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.00866996
 +
| style="text-align: right;" | 4523.34
 
|-
 
|-
| 2339891
+
|- valign="top"
| 2015-01-30
+
| rowspan="1"| Water
| No Violations Noted
+
| rowspan="1"| XTO
| Well is regulatorily inactive. Brine tank located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
+
| rowspan="1"| Carrier/Base Fluid
|  
+
| Water
|
+
| 7732-18-5
|  
+
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 88.7858
 +
| style="text-align: right;" | 46,321,800.0
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =FracFocus Fracking Chemicals Database
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| date = 2019-04-02
| date = 2015-05-26
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | accessdate = 2019-06-19 }}</ref>
  | accessdate = 2015-05-27 }}</ref>
+
<!--== Stimulation Data ==
[[Category:Has Chemical Data]]
 
==Chemical Data==
 
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | HF Fluid Concentration
+
!scope="col" | Stimulation Date
!scope="col" | Ingredient
+
!scope="col" | Phase Number
!scope="col" | Additive Concentration
+
!scope="col" | Chemical Agent
!scope="col" | Trade Name
+
!scope="col" | Volume (gal)
!scope="col" | Purpose
+
!scope="col" | Treating Pressure (psi)
!scope="col" | CAS number
+
!scope="col" | Breakdown Pressure (psi)
!scope="col" | Supplier
 
 
|-
 
|-
| 0.149137
+
|}-->
| Other - (non-hazardous)
+
 
| 92.5
+
== Production Data ==
| Hydrochloric Acid (7.5%)
+
{| class="wikitable sortable" width="95%"
| Acidizing
+
!scope="col" | Period
| NA
+
!scope="col" | Operator Name
| PPG Industries
+
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
 +
| 2012
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 0.0120922
+
| 2013
| Hydrochloric Acid
+
| [[XTO ENERGY INC]]
| 7.5
+
| style="text-align: right;" | 0.00
| Hydrochloric Acid (7.5%)
+
| style="text-align: right;" | 0
| Acidizing
+
| style="text-align: right;" | 0.00
| 7647-01-0
+
| style="text-align: right;" | 0
| PPG Industries
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 0.327386
+
| 2015
| Other - (non-hazardous)
+
| [[XTO ENERGY INC]]
| 85.0
+
| style="text-align: right;" | 0.00
| Hydrochloric Acid (15%)
+
| style="text-align: right;" | 0
| Acidizing
+
| style="text-align: right;" | 0.00
| NA
+
| style="text-align: right;" | 0
| PPG Industries
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 773,015.00
 +
| style="text-align: right;" | 331
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 0.057774
+
| 2017
| Hydrochloric Acid
+
| [[XTO ENERGY INC]]
| 15.0
+
| style="text-align: right;" | 1,242,188.00
| Hydrochloric Acid (15%)
+
| style="text-align: right;" | 365
| Acidizing
+
| style="text-align: right;" | 0.00
| 7647-01-0
+
| style="text-align: right;" | 0
| PPG Industries
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 859,453.75
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 0.00153934
+
| 2019
| Other -(non hazardous)
+
| [[XTO ENERGY INC]]
| 15.0
+
| style="text-align: right;" | 594,510.40
| Scale Inhibitor
+
| style="text-align: right;" | 348
| Nabors
+
| style="text-align: right;" | 0.00
| NA
+
| style="text-align: right;" | 0
| TSC
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 
|-
 
|-
| 0.0
+
| 2012
| 2-Phosphonobutane-1
+
| [[XTO ENERGY INC]]
| 4.0
+
| Drill Cuttings
| Scale Inhibitor
+
| style="text-align: right;" | 16.92 Tons
| Nabors
+
| LANDFILL
| 2
+
| 100403
| TSC
 
 
|-
 
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 634.20 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
| 0.00153934
+
| 2016
| Anionic copolymer
+
| [[XTO ENERGY INC]]
| 15.0
+
| Produced Fluid
| Scale Inhibitor
+
| style="text-align: right;" | 424.00 Bbl
| Nabors
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| NA
+
| WMGR123NW009
| TSC
 
 
|-
 
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
 +
| style="text-align: right;" | 1,709.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
| 0.00410489
+
| 2017
| Propylene glycol
+
| [[XTO ENERGY INC]]
| 40.0
+
| Produced Fluid
| Scale Inhibitor
+
| style="text-align: right;" | 243.70 Bbl
| Nabors
+
| INJECTION DISPOSAL WELL
| 57-55-6
+
| 34-133-24096
|  TSC
 
 
|-
 
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
 +
| style="text-align: right;" | 118.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 
|-
 
|-
| 10.5778
+
| 2017
| Silica Substrate
+
| [[XTO ENERGY INC]]
| 100.0
+
| Produced Fluid
| Sand (Proppant)
+
| style="text-align: right;" | 110.00 Bbl
| Proppant
+
| RESIDUAL WASTE PROCESSING FACILITY
| NA
+
| WMGR123SW005
| Nabors
 
 
|-
 
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,585.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
| 0.00288999
+
| 2017
| Ethoxylated oleylamine
+
| [[XTO ENERGY INC]]
| 5.0
+
| Produced Fluid
| Friction Reducer
+
| style="text-align: right;" | 330.00 Bbl
| Nabors
+
| INJECTION DISPOSAL WELL
| 26635-93-8
+
34-133-24189
WFR-3B
 
 
|-
 
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,256.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
| 0.00866996
+
| 2018
| Other -(non hazardous)
+
| [[XTO ENERGY INC]]
| 15.0
+
| Produced Fluid
| Friction Reducer
+
| style="text-align: right;" | 120.00 Bbl
| Nabors
+
| INJECTION DISPOSAL WELL
| NA
+
34-133-24189
WFR-3B
 
 
|-
 
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 864.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
| 0.00866996
+
| 2019
| Ethoxylated Alcohol Blend
+
| [[XTO ENERGY INC]]
| 15.0
+
| Produced Fluid
| Friction Reducer
+
| style="text-align: right;" | 213.00 Bbl
| Nabors
+
| INJECTION DISPOSAL WELL
| NA
+
| 34-133-24096
| WFR-3B
 
 
|-
 
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 159.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
|  34-133-24189
 
|-
 
|-
| 0.00866996
+
|}
| Propylene glycol
+
For data sources see<ref>{{cite web
| 15.0
+
| title =Oil and Gas Waste Reports
| Friction Reducer
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| Nabors
+
| date = 2019-03-31
| 57-55-6
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
| WFR-3B
+
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 +
| 2102838
 +
| Primary Facility
 +
| 2012-09-26
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Meeting onsite with Operator to discuss the construction plan and timeline of the Terry Bowser A Unit well pad.  At the time of inspection the well pad and access road had been surveyed but no earth movement had been conducted.  After reviewing the plan the Department and Operator discussed the precaution regarding the HQ watershed and stream.  The Department suggests all ABACT perimeter controls are installed prior to earth disturbance and the Operator monitor the site weekly and after significant precipitation event to ensure the site stability in maintained.
 
|-
 
|-
| 0.0288999
+
| 2111668
| Hydrotreated light distillates (10-30%)
+
| Primary Facility
| 50.0
+
| 2012-10-31
| Friction Reducer
+
| Routine/Complete Inspection
| Nabors
+
| No Violations Noted
| 64742-47-8
+
| At the time of inspection the Operator was in the process of moving equipment onto the well pad to start drilling.  Spud notice received by the Department on 10/24/2012. The Department notes that after a significant rainfall event the BMP's associated with the wash rack located closest to the well pad are in need of routine maintenance. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the site stability in maintained.
WFR-3B
 
 
|-
 
|-
 +
| 2116169
 +
| Primary Facility
 +
| 2012-10-31
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Moving in UDI rig#61 at time of inspection.
 
|-
 
|-
| 0.000209455
+
| 2119407
| Isopropyl Alcohol
+
| Primary Facility
| 30.0
+
| 2012-11-29
| Acid Corrosion Inhibitor
+
| Incident- Response to Accident or Event
| Nabors
+
| In Compliance with Policy
| 67-63-0
+
| Site inspection performed as a follow-up to operator notification of a small spill of drilling mud alongside the access road.  The spill occurred while moving equipment off-site on 11/28/12 at 11AM and XTO reported the spill on 11/28/12 shortly after 11AM.  Spill was immediately cleaned up and no evidence was observed to indicate that further action was neccesary on the part of XTO to address the spill.  Site and access road E&S controls had been implemented as outlined in the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
| A12
 
 
|-
 
|-
 +
| 2170145
 +
| Primary Facility
 +
| 2013-05-23
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Drilling appeared to have been completed, well was not equipped for production.  Twelve covered roll-off boxes located onsite.  These roll-off boxes did not have secondary containment.  If these roll-off boxes contain pollutional materials related to flowback or stimulation additives to comply with the Unconventional well secondary containment requirements roll-off boxes of this nature should be placed on some sort of containment.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.
 
|-
 
|-
| 2.09455e-05
+
| 2197056
| Other -(non hazardous)
+
| Primary Facility
| 3.0
+
| 2013-08-19
| Acid Corrosion Inhibitor
+
| Routine/Complete Inspection
| Nabors
+
| No Violations Noted
| NA
+
| Well appeared to be equipped for production.  Brine tank located onsite within containment. Brine tank appeared to be in sound condition. There was no observed accelerated erosion in relation to the site or access road.
A12
 
 
|-
 
|-
 +
| 2339891
 +
| Primary Facility
 +
| 2015-01-30
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well is regulatorily inactive.  Brine tank located onsite and they appeared to be in sound condition.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.
 
|-
 
|-
| 0.000209455
+
| 2400249
| Propargyl Alcohol
+
| Primary Facility
| 30.0
+
| 2015-08-19
| Acid Corrosion Inhibitor
+
| Routine/Complete Inspection
| Nabors
+
| No Violations Noted
| 107-19-7
+
| Well appeared to be equipped for , but not in production.  Brine tank located onsite and it appeared to be in sound condition. Site had been temporarily stabilized and there was no observed accelerated erosion or sedimentation in relation to the site or access road.
A12
 
 
|-
 
|-
 +
| 2443614
 +
| Primary Facility
 +
| 2016-01-26
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well appeared to be equipped for production.  Brine tank located onsite and it appeared to be in sound condition.  Site had been temporarily stabilized and there was no observed accelerated erosion or sedimentation in relation to the site or access road.
 
|-
 
|-
| 0.000209455
+
| 2481549
| Short Chained glycol ether
+
| Primary Facility
| 30.0
+
| 2016-05-05
| Acid Corrosion Inhibitor
+
| Routine/Complete Inspection
| Nabors
+
| No Violations Noted
| 112-34-5
+
| Well appeared to be equipped for production.  Brine tank located onsite and it appeared to be in sound condition. Site had been temporarily stabilized and there was no observed accelerated erosion or sedimentation in relation to the site or access road.
A12
 
 
|-
 
|-
 +
| 2491292
 +
| Primary Facility
 +
| 2016-06-07
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well tagged-in production. Well head casing-equipment-produced fluid tank-dike looked ok.
 
|-
 
|-
| 4.88728e-05
+
| 2539017
| Proprietary Component
+
| Primary Facility
| 7.0
+
| 2016-11-23
| Acid Corrosion Inhibitor
+
| Site Restoration
| Nabors
+
| No Violations Noted
| NA
+
| Well appeared to be equipped for production.  Brine tank located onsite and it appeared to be in sound condition.  Site had been effectively restored to the PCSM plan contained within the associated ESCGP, save for ongoing issues related to runoff from the neighboring golf course. Vegetation had attained 70 %uniform coverage.
A12
 
 
|-
 
|-
 +
| 2592386
 +
| Primary Facility
 +
| 2017-05-11
 +
| Site Restoration
 +
| No Violations Noted
 +
| Well appeared to be equipped for production.  Brine tank located onsite within secondary containment. Both the tank and containment appeared to be in sound condition.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.  Vegetative cover had attained 70% uniform coverage and the well-site had been properly restored.
 
|-
 
|-
| 20.0
+
| 2661105
| 2
+
| Primary Facility
| 10222.0
+
| 2017-11-16
| Biocide KR-153SL
+
| Routine/Complete Inspection
| Biocide
+
| No Violations Noted
| 2-Dibromo-3-nitrilo-
+
| At time of inspection, well drilled and appears equipped for production. Well site surrounded by fence.
| Nabors
 
 
|-
 
|-
 +
| 2793780
 +
| Primary Facility
 +
| 2018-10-24
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and large steel fluid collection tank look ok.
 
|-
 
|-
| 0.0106067
+
|}
| Polyethylene Glycol
+
<!--==== Violations Commited ====
| 50.0
+
{| class="wikitable sortable" width="95%"
| Biocide KR-153SL
+
!scope="col" | Inspection ID
| Biocide
+
!scope="col" | Violation ID
| 25322-68-3
+
!scope="col" | Violation Date
| Nabors
+
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 
|-
 
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 
|-
 
|-
| 0.00636402
+
|}-->
| Other -(non hazardous)
+
For data sources see<ref>{{cite web
| 30.0
+
| title =Oil and Gas Compliance Report
| Biocide KR-153SL
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| Biocide
+
| date = 2019-05-20
| NA
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
| Nabors
+
| accessdate = 2019-05-21 }}</ref>
|-
+
==References==
|-
+
<references/>
| 88.7858
 
| Water
 
| 100.0
 
| Water
 
| Carrier/Base Fluid
 
| 7732-18-5
 
| XTO
 
|-
 
|}
 
For data sources see<ref>{{cite web | title = FracFocus Chemical Disclosure Registry |publisher = [http://www.fracfocusdata.org/DisclosureSearch/]| date = 2015-08-10 | url = http://wellwiki.org/wiki/Well_Chemicals_Data_Sources | accessdate = 2015-08-10 }}</ref>
 
== References ==
 
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 08:15, 21 May 2020

Well Details

Well ID: 37-005-31097
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Buffalo Township
Operator Name: XTO ENERGY INC
Well Pad ID: 144660
Farm/Lease Name: TERRY BOWSER A UNIT 3H
License Status: INACTIVE
Spud Date:
Permit Date: 2012-08-31
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.742906
Longitude: -79.670406

For data sources see[1][2][3]

Well History

Date Event
2012-08-31 New Permit Application
2012-10-26 Performed Spud Operation
2012-11-24 Drilling Completion
2013-02-07 Perforation
2013-11-27 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-03-13 2013-03-22 6,520 5,550,850 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Nabors Proppant Silica Substrate NA 100 10.5778 5,518,700.0
Acid Corrosion Inhibitor, A12 Nabors Corrosion Inhibitor Isopropyl Alcohol 67-63-0 30 0.000209455 109.278
Propargyl Alcohol 107-19-7 30 0.000209455 109.278
Proprietary Component NA 7 0.00004887 25.498
Short Chained glycol ether 112-34-5 30 0.000209455 109.278
Other -(non hazardous) NA 3 0.00002095 10.928
Hydrochloric Acid (7.5%) PPG Industries Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0120922 6308.82
Other - (non-hazardous) NA 92.5 0.149137 77808.8
Biocide KR-153SL Nabors Biocide Other -(non hazardous) NA 30 0.00636402 3320.27
Polyethylene Glycol 25322-68-3 50 0.0106067 5533.78
2,2-Dibromo-3-nitrilo-propionamide 10222-01-2 20 0.00424268 2213.51
Hydrochloric Acid (15%) PPG Industries Acidizing Hydrochloric Acid 7647-01-0 15 0.057774 30142.1
Other - (non-hazardous) NA 85 0.327386 170805
Scale Inhibitor, TSC Nabors Scale Inhibitor 2-Phosphonobutane-1,2,4-tricarboxylic acid, potassium salt 93858-78-7 15 0.00153934 803.11
Propylene glycol 57-55-6 40 0.00410489 2141.63
Anionic copolymer NA 15 0.00153934 803.11
Other -(non hazardous) NA 15 0.00153934 803.11
Friction Reducer, WFR-3B Nabors Friction Reducer Hydrotreated light distillates (10-30%) 64742-47-8 50 0.0288999 15077.8
Propylene glycol 57-55-6 15 0.00866996 4523.34
Ethoxylated oleylamine 26635-93-8 5 0.00288999 1507.78
Other -(non hazardous) NA 15 0.00866996 4523.34
Ethoxylated Alcohol Blend NA 15 0.00866996 4523.34
Water XTO Carrier/Base Fluid Water 7732-18-5 100 88.7858 46,321,800.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2013 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2014 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2015 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2016 XTO ENERGY INC 773,015.00 331 0.00 0 0.00 0
2017 XTO ENERGY INC 1,242,188.00 365 0.00 0 0.00 0
2018 XTO ENERGY INC 859,453.75 365 0.00 0 0.00 0
2019 XTO ENERGY INC 594,510.40 348 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 XTO ENERGY INC Drill Cuttings 16.92 Tons LANDFILL 100403
2016 XTO ENERGY INC Produced Fluid 634.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 424.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2017 XTO ENERGY INC 1,709.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 243.70 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC 118.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 2,585.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 330.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Produced Fluid 2,256.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 864.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 213.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 159.00 Bbl INJECTION DISPOSAL WELL 34-133-24189

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2102838 Primary Facility 2012-09-26 Routine/Complete Inspection No Violations Noted Meeting onsite with Operator to discuss the construction plan and timeline of the Terry Bowser A Unit well pad. At the time of inspection the well pad and access road had been surveyed but no earth movement had been conducted. After reviewing the plan the Department and Operator discussed the precaution regarding the HQ watershed and stream. The Department suggests all ABACT perimeter controls are installed prior to earth disturbance and the Operator monitor the site weekly and after significant precipitation event to ensure the site stability in maintained.
2111668 Primary Facility 2012-10-31 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator was in the process of moving equipment onto the well pad to start drilling. Spud notice received by the Department on 10/24/2012. The Department notes that after a significant rainfall event the BMP's associated with the wash rack located closest to the well pad are in need of routine maintenance. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the site stability in maintained.
2116169 Primary Facility 2012-10-31 Drilling/Alteration No Violations Noted Moving in UDI rig#61 at time of inspection.
2119407 Primary Facility 2012-11-29 Incident- Response to Accident or Event In Compliance with Policy Site inspection performed as a follow-up to operator notification of a small spill of drilling mud alongside the access road. The spill occurred while moving equipment off-site on 11/28/12 at 11AM and XTO reported the spill on 11/28/12 shortly after 11AM. Spill was immediately cleaned up and no evidence was observed to indicate that further action was neccesary on the part of XTO to address the spill. Site and access road E&S controls had been implemented as outlined in the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2170145 Primary Facility 2013-05-23 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed, well was not equipped for production. Twelve covered roll-off boxes located onsite. These roll-off boxes did not have secondary containment. If these roll-off boxes contain pollutional materials related to flowback or stimulation additives to comply with the Unconventional well secondary containment requirements roll-off boxes of this nature should be placed on some sort of containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2197056 Primary Facility 2013-08-19 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite within containment. Brine tank appeared to be in sound condition. There was no observed accelerated erosion in relation to the site or access road.
2339891 Primary Facility 2015-01-30 Routine/Complete Inspection No Violations Noted Well is regulatorily inactive. Brine tank located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2400249 Primary Facility 2015-08-19 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for , but not in production. Brine tank located onsite and it appeared to be in sound condition. Site had been temporarily stabilized and there was no observed accelerated erosion or sedimentation in relation to the site or access road.
2443614 Primary Facility 2016-01-26 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been temporarily stabilized and there was no observed accelerated erosion or sedimentation in relation to the site or access road.
2481549 Primary Facility 2016-05-05 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been temporarily stabilized and there was no observed accelerated erosion or sedimentation in relation to the site or access road.
2491292 Primary Facility 2016-06-07 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-equipment-produced fluid tank-dike looked ok.
2539017 Primary Facility 2016-11-23 Site Restoration No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been effectively restored to the PCSM plan contained within the associated ESCGP, save for ongoing issues related to runoff from the neighboring golf course. Vegetation had attained 70 %uniform coverage.
2592386 Primary Facility 2017-05-11 Site Restoration No Violations Noted Well appeared to be equipped for production. Brine tank located onsite within secondary containment. Both the tank and containment appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Vegetative cover had attained 70% uniform coverage and the well-site had been properly restored.
2661105 Primary Facility 2017-11-16 Routine/Complete Inspection No Violations Noted At time of inspection, well drilled and appears equipped for production. Well site surrounded by fence.
2793780 Primary Facility 2018-10-24 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and large steel fluid collection tank look ok.

For data sources see[8]

References