X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-31316"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-31316
 
| Well ID: 37-005-31316
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.686847, -79.681331 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.686847, -79.681331 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: TRILOGY B 2H
 
| Farm/Lease Name: TRILOGY B 2H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2018-09-17
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2018-03-12
 
| Permit Date: 2018-03-12
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.686847
 
| Latitude: 40.686847
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2018-03-12
 +
| New Permit Application
 +
|-
 +
| 2018-09-17
 +
| Performed Spud Operation
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 92:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 87: Line 119:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| style="text-align: right;" | 0.00
+
| style="text-align: right;" | 1,581,925.88
| style="text-align: right;" | 0
+
| style="text-align: right;" | 135
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 112: Line 144:
 
| 2018
 
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Drill Cuttings (in Tons) RWC 810
+
| Drilling Fluid Waste
 +
| style="text-align: right;" | 480.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Drill Cuttings
 
| style="text-align: right;" | 634.70 Tons
 
| style="text-align: right;" | 634.70 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100585
 
| 100585
 
|-
 
|-
| 2018
+
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 1,039.25 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,271.15 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Unused Fracturing Fluid Waste
 +
| style="text-align: right;" | 13.33 Tons
 +
| LANDFILL
 +
| 100434
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,205.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Other Oil & Gas Wastes
| style="text-align: right;" | 480.00 Bbl
+
| style="text-align: right;" | 345.67 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
| WMGR123NW009
Line 126: Line 193:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Drill Cuttings (in Tons) RWC 810
+
| Drill Cuttings
| style="text-align: right;" | 970.65 Tons
+
| style="text-align: right;" | 117.68 Tons
 
| LANDFILL
 
| LANDFILL
| 100585
+
| 100172
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,792.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
|  34-133-24189
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,019.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Waste Water Treatment Sludge
 +
| style="text-align: right;" | 122.13 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 101674
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 52,888.17 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Synthetic Liner Materials (in Tons) RWC 806
+
| Other Oil & Gas Wastes
| style="text-align: right;" | 3.56 Tons
+
| style="text-align: right;" | 50.00 Bbl
| LANDFILL
+
| REUSE (AT WELL PAD)
| 100585
+
|  
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Drill Cuttings (in Tons) RWC 810
+
| Synthetic Liner Materials
| style="text-align: right;" | 117.68 Tons
+
| style="text-align: right;" | 53.50 Tons
 
| LANDFILL
 
| LANDFILL
| 100172
+
| 100585
 
|-
 
|-
 
|}
 
|}

Latest revision as of 08:35, 21 May 2020

Well Details

Well ID: 37-005-31316
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Freeport Borough
Operator Name: XTO ENERGY INC
Well Pad ID: 155139
Farm/Lease Name: TRILOGY B 2H
License Status:
Spud Date:
Permit Date: 2018-03-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.686847
Longitude: -79.681331

For data sources see[1][2][3]

Well History

Date Event
2018-03-12 New Permit Application
2018-09-17 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 XTO ENERGY INC 1,581,925.88 135 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 XTO ENERGY INC Drilling Fluid Waste 480.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Drill Cuttings 634.70 Tons LANDFILL 100585
2019 XTO ENERGY INC Drill Cuttings 1,039.25 Tons LANDFILL 100585
2019 XTO ENERGY INC Produced Fluid 1,271.15 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Unused Fracturing Fluid Waste 13.33 Tons LANDFILL 100434
2019 XTO ENERGY INC Produced Fluid 1,205.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Other Oil & Gas Wastes 345.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Drill Cuttings 117.68 Tons LANDFILL 100172
2019 XTO ENERGY INC Produced Fluid 1,792.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 1,019.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Waste Water Treatment Sludge 122.13 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2019 XTO ENERGY INC Produced Fluid 52,888.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Other Oil & Gas Wastes 50.00 Bbl REUSE (AT WELL PAD)
2019 XTO ENERGY INC Synthetic Liner Materials 53.50 Tons LANDFILL 100585

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2778284 Primary Facility 2018-09-21 Drilling/Alteration No Violations Noted This well was spudded to 40' and had 40' of 30" pipe installed and cemented back to surface. All equipment on site looked ok.
2778803 Primary Facility 2018-09-24 Drilling/Alteration No Violations Noted This well was spudded to a depth of 40' and had 40' of 30" conductor pipe cemented to surface inside a cellar which measures 10' in diameter by 8' deep. All equipment on site looked ok.

On this return date, the well bore hole had been deepened to 68' and the Rig had run 68' of 24" pipe, cemented it to surface and covered the well cellar with a steel plate until the next Rig returns to continue the drilling operation. The well log record and all equipment on site looked ok.

2790011 Primary Facility 2018-10-17 Drilling/Alteration No Violations Noted This well was spudded to 42' and had 42' of 40" pipe installed and cemented back to surface inside an 8'x10' cellar. All equipment on site looked ok.

On this return date, the top hole rig was on site drilling at 1383' at the time of this inspection. All well log information and equipment on site looks ok.

2821634 Primary Facility 2019-01-03 Drilling/Alteration No Violations Noted The top hole portion of this well has been drilled and the well casing is capped off waiting on the finishing rig to arrive. The well head casing and all equipment on site looks ok.
2853390 Primary Facility 2019-03-12 Drilling/Alteration No Violations Noted At the time of inspection, Patterson 579 was drilling 8 3/4" hole in the curve. Once they land the curve, they will switch to a 8 1/2" bit. The BOP was tested on 3/10. Containment appeared to be in good condition, with fuel and mud within double containment.

For data sources see[7]

References