If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
|||
(15 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
+ | __TOC__ | ||
== Well Details == | == Well Details == | ||
− | {| class="wikitable" width="95%" | + | {| class="wikitable welldetails" width="95%" |
− | | Well ID: 015-22179 | + | | Well ID: 37-015-22179 |
− | | style=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.592419, -76.325569 | width=100% | height=100% }} |
+ | |- | ||
+ | | Country: United States | ||
+ | |- | ||
+ | | State: Pennsylvania | ||
|- | |- | ||
− | | County: [[ | + | | County: [[Bradford_County,_Pennsylvania|Bradford]] |
|- | |- | ||
− | | Municipality: [[Wilmot Township, | + | | Municipality: [[Wilmot Township,_Bradford_County,_Pennsylvania|Wilmot Township]] |
|- | |- | ||
| Operator Name: [[CHESAPEAKE APPALACHIA LLC]] | | Operator Name: [[CHESAPEAKE APPALACHIA LLC]] | ||
+ | |- | ||
+ | | Well Pad ID: [[145729]] | ||
|- | |- | ||
| Farm/Lease Name: CIRCLE H S BRA 2H | | Farm/Lease Name: CIRCLE H S BRA 2H | ||
|- | |- | ||
− | | | + | | License Status: PLUGGED & ABANDONED |
|- | |- | ||
− | | | + | | Spud Date: |
|- | |- | ||
− | | | + | | Permit Date: 2012-04-03 |
|- | |- | ||
− | | | + | | Well Type: GAS |
|- | |- | ||
− | | | + | | Unconventional Well: Y |
|- | |- | ||
− | | | + | | Configuration: Horizontal Well |
|- | |- | ||
− | | | + | | Conservation: No |
|- | |- | ||
| Latitude: 41.592419 | | Latitude: 41.592419 | ||
|- | |- | ||
| Longitude: -76.325569 | | Longitude: -76.325569 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2012-04-03 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2012-04-16 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2013-06-24 | ||
+ | | NEWLY DRILLED | ||
+ | |- | ||
+ | | 2013-09-25 | ||
+ | | FULLY PLUGGED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator Name | ||
+ | !scope="col" | Gas Quantity (mcf) | ||
+ | !scope="col" | Gas Production Days | ||
+ | !scope="col" | Oil Quantity (bbl) | ||
+ | !scope="col" | Oil Production Days | ||
+ | !scope="col" | Water Quantity (bbl) | ||
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[CHESAPEAKE APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[CHESAPEAKE APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | == | + | | title =Oil and Gas Production Reports |
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Waste Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
+ | !scope="col" | Waste Type | ||
+ | !scope="col" | Quantity | ||
+ | !scope="col" | Disposal Method | ||
+ | !scope="col" | Waste Facility ID | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
+ | !scope="col" | Inspection Comments | ||
|- | |- | ||
| 2061083 | | 2061083 | ||
+ | | Primary Facility | ||
| 2012-04-19 | | 2012-04-19 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| 20" cond. set. Mousehole not cemented yet. Cond set on the N2H and 4 empty cellars. | | 20" cond. set. Mousehole not cemented yet. Cond set on the N2H and 4 empty cellars. | ||
− | |||
− | |||
|- | |- | ||
| 2062218 | | 2062218 | ||
+ | | Primary Facility | ||
| 2012-04-25 | | 2012-04-25 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
+ | |- | ||
+ | | 2196297 | ||
+ | | Primary Facility | ||
+ | | 2013-08-15 | ||
+ | | Plugging(Includes Plugged/Mined Through) | ||
+ | | No Violations Noted | ||
+ | | Well (Conductor) has been plugged. | ||
+ | |- | ||
+ | | 2209493 | ||
+ | | Primary Facility | ||
+ | | 2013-10-02 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
| | | | ||
|- | |- | ||
− | | | + | | 2355307 |
− | + | | Primary Facility | |
− | + | | 2015-03-19 | |
− | + | | Routine/Complete Inspection | |
− | + | | No Violations Noted | |
− | + | | Inspected site at 11:35 on 03/19/2015. No Chesapeake representatives were present. Sunny, breezy, ~40°F. | |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 2387312 |
− | | | + | | Primary Facility |
− | | | + | | 2015-07-09 |
− | + | | Routine/Complete Inspection | |
− | + | | No Violations Noted | |
− | + | | Arrived @ 13:05 with Compliance Specialist Tony Liguori. Weather: breezy and sunny. Chesapeake well tender Joel Mincer was also on site. 6 cellars on pad. The Circle H N Bra 2H was in production. The N Bra 3H, a plugged well, had a cellar filled with gravel. The other cellars were water-filled, no bubbles. 2H (015-22178): 13-3/8” x 9-5/8”: plumbing open to production tank, 9-5/8” x 5-1/2”: plumbing not open to production tank, 9 psi on digital gauge | |
− | |||
|- | |- | ||
+ | | 2696487 | ||
+ | | Primary Facility | ||
+ | | 2018-02-21 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Arrived at 14:20. 1 producing well and 1 plugged conductor on 6-slot setup. Circle HNBra 2H 015-22178: Water in cellar, no bubbles. Top gauge: 19105 pdi. 9 5/8 X 13 3/8" annulus shut-in. 0 psi digital. 5 1/2 X 9 5/8" annulus has 9 psi. | ||
|- | |- | ||
− | | | + | | 2829904 |
− | | | + | | Primary Facility |
− | | | + | | 2019-01-17 |
− | | | + | | Routine/Complete Inspection |
− | + | | No Violations Noted | |
− | + | | Chesapeake Appalachia submitted a Well Site Restoration Report (WSRR) for the Circle H pad. The WSRR was received by the Department on 1/14/19. Arrived onsite at 11:26; the weather was ~20°F and calm. The gate was open when I arrived, however the access road also joins another pad. | |
− | + | ||
+ | There was 1 properly tagged Marcellus well staged for production. There were 6 well cellars filled with ice. There was 1 GPU and sand separator, and 2 produced water tanks onsite and in secondary containment. | ||
+ | |||
+ | Much of the site was sufficiently vegetated. However, some areas of the containment berm lacked vegetation and showed the potential to develop accelerated erosion issues (Photos #1, 4, 5). At the time of inspection small areas scattered around the site had sparse vegetation. A large area near infiltration area #1 on the northern side of the pad contained a large amount of mossy and in some cases sparsely vegetated ground (Photo #2, 6). | ||
+ | |||
+ | It is recommended that the areas mentioned above be reseeded with the approved seed mixt | ||
|- | |- | ||
|} | |} | ||
− | == | + | <!--==== Violations Commited ==== |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Violation ID |
− | !scope="col" | | + | !scope="col" | Violation Date |
− | !scope="col" | | + | !scope="col" | Date Resolved |
− | !scope="col" | | + | !scope="col" | Violation Code |
− | !scope="col" | | + | !scope="col" | Violation Type |
− | !scope="col" | | + | !scope="col" | Violation Comments |
− | !scope="col" | | + | |- |
− | !scope="col" | | + | |}--> |
− | |} | + | <!--==== Penalties Applied ==== |
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Penalty ID | ||
+ | !scope="col" | Penalty Code | ||
+ | !scope="col" | Penalty Status | ||
+ | !scope="col" | Penalty Date | ||
+ | !scope="col" | Enforcement Date | ||
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
+ | |- | ||
+ | |}--> | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Compliance Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | ==References== | ||
+ | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Pennsylvania Wells]] |
Well ID: 37-015-22179 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.592419,"lon":-76.325569,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Wilmot Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 145729 | |
Farm/Lease Name: CIRCLE H S BRA 2H | |
License Status: PLUGGED & ABANDONED | |
Spud Date: | |
Permit Date: 2012-04-03 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.592419 | |
Longitude: -76.325569 |
Date | Event |
---|---|
2012-04-03 | New Permit Application |
2012-04-16 | Performed Spud Operation |
2013-06-24 | NEWLY DRILLED |
2013-09-25 | FULLY PLUGGED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2061083 | Primary Facility | 2012-04-19 | Drilling/Alteration | No Violations Noted | 20" cond. set. Mousehole not cemented yet. Cond set on the N2H and 4 empty cellars. |
2062218 | Primary Facility | 2012-04-25 | Routine/Complete Inspection | No Violations Noted | |
2196297 | Primary Facility | 2013-08-15 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Well (Conductor) has been plugged. |
2209493 | Primary Facility | 2013-10-02 | Routine/Complete Inspection | No Violations Noted | |
2355307 | Primary Facility | 2015-03-19 | Routine/Complete Inspection | No Violations Noted | Inspected site at 11:35 on 03/19/2015. No Chesapeake representatives were present. Sunny, breezy, ~40°F. |
2387312 | Primary Facility | 2015-07-09 | Routine/Complete Inspection | No Violations Noted | Arrived @ 13:05 with Compliance Specialist Tony Liguori. Weather: breezy and sunny. Chesapeake well tender Joel Mincer was also on site. 6 cellars on pad. The Circle H N Bra 2H was in production. The N Bra 3H, a plugged well, had a cellar filled with gravel. The other cellars were water-filled, no bubbles. 2H (015-22178): 13-3/8” x 9-5/8”: plumbing open to production tank, 9-5/8” x 5-1/2”: plumbing not open to production tank, 9 psi on digital gauge |
2696487 | Primary Facility | 2018-02-21 | Routine/Complete Inspection | No Violations Noted | Arrived at 14:20. 1 producing well and 1 plugged conductor on 6-slot setup. Circle HNBra 2H 015-22178: Water in cellar, no bubbles. Top gauge: 19105 pdi. 9 5/8 X 13 3/8" annulus shut-in. 0 psi digital. 5 1/2 X 9 5/8" annulus has 9 psi. |
2829904 | Primary Facility | 2019-01-17 | Routine/Complete Inspection | No Violations Noted | Chesapeake Appalachia submitted a Well Site Restoration Report (WSRR) for the Circle H pad. The WSRR was received by the Department on 1/14/19. Arrived onsite at 11:26; the weather was ~20°F and calm. The gate was open when I arrived, however the access road also joins another pad.
There was 1 properly tagged Marcellus well staged for production. There were 6 well cellars filled with ice. There was 1 GPU and sand separator, and 2 produced water tanks onsite and in secondary containment. Much of the site was sufficiently vegetated. However, some areas of the containment berm lacked vegetation and showed the potential to develop accelerated erosion issues (Photos #1, 4, 5). At the time of inspection small areas scattered around the site had sparse vegetation. A large area near infiltration area #1 on the northern side of the pad contained a large amount of mossy and in some cases sparsely vegetated ground (Photo #2, 6). It is recommended that the areas mentioned above be reseeded with the approved seed mixt |
For data sources see[6]