If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-015-23415 | | Well ID: 37-015-23415 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.593381, -76.596164 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: SGL-36 UNIT 3H | | Farm/Lease Name: SGL-36 UNIT 3H | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
| Permit Date: 2018-03-22 | | Permit Date: 2018-03-22 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
|- | |- | ||
| Configuration: Horizontal Well | | Configuration: Horizontal Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 41.593381 | | Latitude: 41.593381 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2018-03-22 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2018-12-06 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 71: | Line 92: | ||
!scope="col" | Job Percentage by Mass | !scope="col" | Job Percentage by Mass | ||
!scope="col" | Mass Used (lb) | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
|- | |- | ||
|}--> | |}--> | ||
Line 112: | Line 144: | ||
| 2019 | | 2019 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | Drill Cuttings | + | | Drilling Fluid Waste |
− | | style="text-align: right;" | 1, | + | | style="text-align: right;" | 363.33 Bbl |
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR119 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CHIEF OIL & GAS LLC]] | ||
+ | | Drill Cuttings | ||
+ | | style="text-align: right;" | 1,665.56 Tons | ||
| LANDFILL | | LANDFILL | ||
| 301358 | | 301358 | ||
Line 119: | Line 158: | ||
| 2019 | | 2019 | ||
| [[CHIEF OIL & GAS LLC]] | | [[CHIEF OIL & GAS LLC]] | ||
− | | | + | | Synthetic Liner Materials |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 10.44 Tons |
− | | | + | | LANDFILL |
− | | | + | | 301358 |
|- | |- | ||
|} | |} |
Well ID: 37-015-23415 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.593381,"lon":-76.596164,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Overton Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 155089 | |
Farm/Lease Name: SGL-36 UNIT 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2018-03-22 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.593381 | |
Longitude: -76.596164 |
Date | Event |
---|---|
2018-03-22 | New Permit Application |
2018-12-06 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2019 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 363.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2019 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,665.56 Tons | LANDFILL | 301358 |
2019 | CHIEF OIL & GAS LLC | Synthetic Liner Materials | 10.44 Tons | LANDFILL | 301358 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2769842 | Primary Facility | 2018-08-31 | Routine/Complete Inspection | No Violations Noted | All sediment traps constructed. Temporary e&s controls installed. The pad area remains under construction. No erosion noted. |
2816867 | Primary Facility | 2018-12-10 | Drilling/Alteration | No Violations Noted | Routine inspection with DEP OGI Andy Becher. Trey Villarreal, representative for Chief, met us upon arrival. A spud rig was spudding the second of four wells at the time of the inspection. All five well cellars had been installed. No fluids were present on location at the time of inspection. The protective fence near the entrance of the access road that had been missing at the time of the preop inspection was installed at the time of this inspection.
No E&S issues noted. Site is stable. No violations noted. |
2848429 | Primary Facility | 2019-03-04 | Drilling/Alteration | No Violations Noted | On March 4, 2019, Department representative Brad Kline conducted a routine site inspection at Chief Oil & Gas SGL 36 Pad. Met with Ty, Chief Company Man and Eric McClure, Environmental Specialist. Precision Drill Rig 659 was tripping out of well 4H at the time of inspection. Eric gave a tour around the pad. Chemicals were stored in secondary containment. There was no apparent puddles or sheens in containment. Snow cover did not allow for E&S controls to be evaluated.
No violations noted. |
For data sources see[7]