X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-015-23433"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-015-23433
 
| Well ID: 37-015-23433
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.623389, -76.825156 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.623389, -76.825156 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status:  
 
| License Status:  
 
|-
 
|-
| Spud Date: 2019-05-04
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2018-07-27
 
| Permit Date: 2018-07-27
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.623389
 
| Latitude: 41.623389
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2018-07-27
 +
| New Permit Application
 +
|-
 +
| 2019-03-27
 +
| MOD
 +
|-
 +
| 2019-05-04
 +
| Performed Spud Operation
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 74: Line 98:
 
|}-->
 
|}-->
  
<!--== Production Data ==
+
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 +
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
Line 85: Line 120:
 
!scope="col" | Water Production Days
 
!scope="col" | Water Production Days
 
|-
 
|-
|}-->
+
| 2019
 
+
| [[ROCKDALE MARCELLUS LLC]]
<!--== Waste Data ==
+
| style="text-align: right;" | 148,556.00
 +
| style="text-align: right;" | 61
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
Line 96: Line 145:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
|}-->
+
| 2019
 
+
| [[ROCKDALE MARCELLUS LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 73.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC010
 +
|-
 +
| 2019
 +
| [[ROCKDALE MARCELLUS LLC]]
 +
| Synthetic Liner Materials
 +
| style="text-align: right;" | 19.90 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2019
 +
| [[ROCKDALE MARCELLUS LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 1,011.31 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2019
 +
| [[ROCKDALE MARCELLUS LLC]]
 +
| Soil Contaminated by Oil
 +
| style="text-align: right;" | 1.47 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2019
 +
| [[ROCKDALE MARCELLUS LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 111.66 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[ROCKDALE MARCELLUS LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 800.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[ROCKDALE MARCELLUS LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 115.00 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
| WMGR123NC036
 +
|-
 +
| 2019
 +
| [[ROCKDALE MARCELLUS LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 33.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR119
 +
|-
 +
| 2019
 +
| [[ROCKDALE MARCELLUS LLC]]
 +
| Soil Contaminated by Oil & Gas Related Spills
 +
| style="text-align: right;" | 1.47 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2019
 +
| [[ROCKDALE MARCELLUS LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 34.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC010
 +
|-
 +
| 2019
 +
| [[ROCKDALE MARCELLUS LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 14,033.01 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
| WMGR123NC036
 +
|-
 +
| 2019
 +
| [[ROCKDALE MARCELLUS LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 753.33 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
==== Inspections Performed ====
 
==== Inspections Performed ====

Latest revision as of 15:38, 21 May 2020

Well Details

Well ID: 37-015-23433
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Canton Township
Operator Name: ROCKDALE MARCELLUS LLC
Well Pad ID: 146672
Farm/Lease Name: CASTLE UNIT 113 4H
License Status:
Spud Date:
Permit Date: 2018-07-27
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.623389
Longitude: -76.825156

For data sources see[1][2][3]

Well History

Date Event
2018-07-27 New Permit Application
2019-03-27 MOD
2019-05-04 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 ROCKDALE MARCELLUS LLC 148,556.00 61 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2019 ROCKDALE MARCELLUS LLC Produced Fluid 73.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 ROCKDALE MARCELLUS LLC Synthetic Liner Materials 19.90 Tons LANDFILL 301358
2019 ROCKDALE MARCELLUS LLC Drill Cuttings 1,011.31 Tons LANDFILL 301358
2019 ROCKDALE MARCELLUS LLC Soil Contaminated by Oil 1.47 Tons LANDFILL 301358
2019 ROCKDALE MARCELLUS LLC Other Oil & Gas Wastes 111.66 Bbl REUSE (AT WELL PAD)
2019 ROCKDALE MARCELLUS LLC Drilling Fluid Waste 800.00 Bbl REUSE (AT WELL PAD)
2019 ROCKDALE MARCELLUS LLC Other Oil & Gas Wastes 115.00 Bbl STORAGE PENDING DISPOSAL OR REUSE WMGR123NC036
2019 ROCKDALE MARCELLUS LLC Drilling Fluid Waste 33.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2019 ROCKDALE MARCELLUS LLC Soil Contaminated by Oil & Gas Related Spills 1.47 Tons LANDFILL 301358
2019 ROCKDALE MARCELLUS LLC Drilling Fluid Waste 34.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 ROCKDALE MARCELLUS LLC Produced Fluid 14,033.01 Bbl STORAGE PENDING DISPOSAL OR REUSE WMGR123NC036
2019 ROCKDALE MARCELLUS LLC Produced Fluid 753.33 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2764594 Primary Facility 2018-08-15 Routine/Complete Inspection No Violations Noted I arrived onsite with Brock Zeisloft to examine the area of the encapsulated cuttings pit shown on the newly received ESCGP submission for construction of a new well pad. The location shown on the submission was well vegetated and showed no signs of a failed or leaking pit. The entire area surrounding the well pad was also well vegetated, and soil conductivity in all areas was less than .30 mS/cm. The production tank containment for the single tank on the site was filled to within 6-12" of the top of the wall with accumulated rainwater, and the wall of the containment was not level, varying by as much as 12" in different locations. I recommend that Rockdale remove all water from the containment and level up the wall. A 275 gallon chemical tote marked "Non-hazardous waste was present on the site in its own containment, and had 1-2" of fluid in the bottom. This containment was also in danger of overtopping. I recommend that Rockdale vac this containment and remove the tote from the site, as it is likel

For data sources see[7]

References