X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-019-21686"

m
m
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
__TOC__
 
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-019-21686
 
| Well ID: 37-019-21686
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.675081, -79.751297 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.675081, -79.751297 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Butler County, Pennsylvania|Butler]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Buffalo Township, Butler County, Pennsylvania|Buffalo Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[XTO ENERGY INC|XTO ENERGY INC]]
+
| County: [[Butler_County,_Pennsylvania|Butler]]
 +
|-
 +
| Municipality: [[Buffalo Township,_Butler_County,_Pennsylvania|Buffalo Township]]
 +
|-
 +
| Operator Name: [[XTO ENERGY INC]]
 
|-
 
|-
 
| Well Pad ID: [[149696]]
 
| Well Pad ID: [[149696]]
Line 15: Line 19:
 
| Farm/Lease Name: THOMAS S PAJER ET AL 2H
 
| Farm/Lease Name: THOMAS S PAJER ET AL 2H
 
|-
 
|-
| First Permit Date: 2010-01-22
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2010-01-22
+
| Spud Date:  
 
|-
 
|-
| Spud Date: 2010-04-14
+
| Permit Date: 2010-01-22
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Producing: Yes
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: None
+
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.675081
 
| Latitude: 40.675081
 
|-
 
|-
 
| Longitude: -79.751297
 
| Longitude: -79.751297
|-
 
 
|}
 
|}
== Inspection Data ==
+
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Date
!scope="col" | DATE
+
!scope="col" | Event
!scope="col" | DESCRIPTION
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
 
|-
 
|-
| 1877665
+
| 2010-01-22
| 2010-04-16
+
| New Permit Application
| No Violations Noted
 
|
 
|  
 
 
|-
 
|-
 +
| 2010-04-14
 +
| Performed Spud Operation
 
|-
 
|-
| 1884272
+
| 2010-08-25
| 2010-05-13
+
| Drilling Completion
| No Violations Noted
 
|
 
|  
 
 
|-
 
|-
 +
| 2010-10-06
 +
| Perforation
 
|-
 
|-
| 1890752
+
| 2010-11-30
| 2010-06-02
+
| DEVIATED
| No Violations Noted
 
|
 
|  
 
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| 1905864
+
|}-->
| 2010-08-05
+
<!--==== Fluid Composition Data ====
| No Violations Noted
+
{| class="wikitable sortable" width="95%"
|  
+
!scope="col" | Job Number
|  
+
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
| 1908940
+
|}-->
| 2010-08-27
+
 
| No Violations Noted
 
|
 
|
 
|-
 
|-
 
| 1988635
 
| 2011-07-14
 
| No Violations Noted
 
|
 
|
 
|-
 
|}
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
|-
+
!scope="col" | Water Production Days
| 2012-2
 
| style="text-align:right;" | 305255.0
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2010
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 174,604.00
 +
| style="text-align: right;" | 81
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-1
+
| 2011
| style="text-align:right;" | 365629.0
+
| [[PHILLIPS EXPLORATION INC]]
| style="text-align:right;" | 182.0
+
| style="text-align: right;" | 936,604.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 362
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2012
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 670,884.00
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-2
+
| 2013
| style="text-align:right;" | 522798.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 183.0
+
| style="text-align: right;" | 467,614.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 327,709.00
 +
| style="text-align: right;" | 310
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-1
+
| 2015
| style="text-align:right;" | 413806.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 179.0
+
| style="text-align: right;" | 356,058.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 363
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 290,189.00
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-2
+
| 2017
| style="text-align:right;" | 174604.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 81.0
+
| style="text-align: right;" | 254,380.70
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 351
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 238,020.00
 +
| style="text-align: right;" | 337
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-3
+
| 2019
| style="text-align:right;" | 0.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 214,757.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 336
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
+
|-
!scope="col" | FACILITY CITY
+
| 2010
!scope="col" | FACILITY STATE
+
| [[PHILLIPS EXPLORATION INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,290.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 301353
 
|-
 
|-
| 2012-2
+
| 2011
| PRODUCED FLUID
+
| [[PHILLIPS EXPLORATION INC]]
| style="text-align:right;" | 116.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 720.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-059-24067
 
| 34-059-24067
| DEVCO UNIT #1 (SWIW #11) DAVID R HILL INC
 
| CAMBRIDGE
 
| OH
 
 
|-
 
|-
 +
| 2011
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 530.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 301353
 
|-
 
|-
| 2012-2
+
| 2011
| PRODUCED FLUID
+
| [[PHILLIPS EXPLORATION INC]]
| style="text-align:right;" | 853.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 100.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PAD013826847
+
| 34-133-20114
| MCCUTCHEON ENTERPRISE
 
| APOLLO
 
| PA
 
|-
 
|-
 
| 2012-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 117.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-151-2-2783
 
| NUIMANS # 1 (PETROX, INC)
 
| MINERVA
 
| OH
 
 
|-
 
|-
|-
+
| 2011
| 2012-2
+
| [[PHILLIPS EXPLORATION INC]]
| PRODUCED FLUID
+
| Produced Fluid
| style="text-align:right;" | 161.0
+
| style="text-align: right;" | 850.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0254185
 
| PA0254185
| RESERVED ENVIRONMENTAL SERVICES
 
| MOUNT PLEASANT
 
| PA
 
 
|-
 
|-
 +
| 2012
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 200.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 
|-
 
|-
| 2012-2
+
| 2012
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 84.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 252.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|  34-133-24189
| SALTY'S DISPOSAL - MEYERS #2 (SWIW #33)
 
| ATWATER
 
| OH
 
 
|-
 
|-
 +
| 2012
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 117.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-151-22783
 
|-
 
|-
| 2012-2
+
| 2012
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 100.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 1,470.00 Bbl
| INJECTION DISPOSAL WELL
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 34-133-24096
+
| 101674
| SALTYS DISPOSAL - GROSELLE INECTION WELL # 2
 
| GARRETTSVILLE
 
| OH
 
 
|-
 
|-
 +
| 2012
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 161.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0254185
 
|-
 
|-
| 2012-2
+
| 2012
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 84.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 84.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-133-21076
 
| 34-133-21076
| SALTYS DISPOSAL - MYERS INECTION WELL #1
 
| PARIS
 
| OH
 
 
|-
 
|-
 +
| 2012
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 116.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-059-24067
 
|-
 
|-
| 2010-2
+
| 2013
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 2290.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 482.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PAR000519462
+
| 101674
| ADVANCED WASTE SERVICES OF PA (NEW CASTLE)
+
|-
| NEW CASTLE
+
| 2013
| PA
+
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 98.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW009
 +
|-
 +
| 2013
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 100.00 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0254185
 
|-
 
|-
 +
| 2013
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 100.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0254185
 
|-
 
|-
| 2011-1
+
| 2014
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 430.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 43.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| PAR000519462
+
| WMGR123SW005
| ADVANCED WASTE SERVICES OF PA (NEW CASTLE)
 
| NEW CASTLE
 
| PA
 
 
|-
 
|-
 +
| 2014
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 336.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW009
 
|-
 
|-
| 2011-1
+
| 2014
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 260.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 80.00 Bbl
| INJECTION DISPOSAL WELL
+
| CENT WASTE TRT FAC NPDES
| 34-059-24067
+
| PA0254185
| DEVCO UNIT (SWIW #11) DAVID R HILL INC
 
| CAMBRIDGE
 
| OH
 
 
|-
 
|-
 +
| 2014
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 80.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0254185
 
|-
 
|-
| 2011-2
+
| 2015
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 100.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 545.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| PAR000519462
+
| WMGR123NW009
| ADVANCED WASTE SERVICES OF PA (NEW CASTLE)
 
| NEW CASTLE
 
| PA
 
 
|-
 
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Basic Sediment
 +
| style="text-align: right;" | 7.40 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
| 2011-2
+
| 2016
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 460.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 274.00 Bbl
| INJECTION DISPOSAL WELL
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| 34-059-24067
+
| WMGR123NW009
| DEVCO UNIT (SWIW #11) DAVID R HILL INC
 
| CAMBRIDGE
 
| OH
 
 
|-
 
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 255.80 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
| 2011-2
+
| 2017
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 850.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 321.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| RESIDUAL WASTE PROCESSING FACILITY
| PA0254185
+
| WMGR123NW009
| RESERVED ENVIRONMENTAL SERVICES
 
| MOUNT PLEASANT
 
| PA
 
 
|-
 
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 410.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
| 2011-2
+
| 2019
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 100.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 47.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| INJECTION DISPOSAL WELL
| 34-133-20114
+
| 34-133-24189
| SALTY'S DISPOSAL - WILCOX #1
 
| ROOTSTOWN
 
| OH
 
 
|-
 
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 162.50 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
| 2012-1
+
| 2019
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 100.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 55.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
| 34-133-24096
| GROSELLE #2 - SALTYS DISPOSAL WELLS LP
 
| GARRETTSVILLE
 
| OH
 
 
|-
 
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 2.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 1877665
 +
| Primary Facility
 +
| 2010-04-16
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
|
 +
|-
 +
| 1884272
 +
| Primary Facility
 +
| 2010-05-13
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
|
 
|-
 
|-
| 2012-1
+
| 1890752
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 617.0
+
| 2010-06-02
| Bbl
+
| Routine/Complete Inspection
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| No Violations Noted
| PAD013826847
+
|  
| MCCUTCHEON ENTERPRISE
+
|-
| APOLLO
+
| 1905864
| PA
+
| Primary Facility
 +
| 2010-08-05
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
|  
 
|-
 
|-
 +
| 1908940
 +
| Primary Facility
 +
| 2010-08-27
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
|
 
|-
 
|-
| 2012-1
+
| 1988635
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 168.0
+
| 2011-07-14
| Bbl
+
| Routine/Partial Inspection
| INJECTION DISPOSAL WELL
+
| No Violations Noted
|  34-133-24189
+
|  
| SALTY'S DISPOSAL - MEYERS #2 (SWIW #33)
 
| ATWATER
 
| OH
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 20:45, 21 May 2020

Well Details

Well ID: 37-019-21686
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Buffalo Township
Operator Name: XTO ENERGY INC
Well Pad ID: 149696
Farm/Lease Name: THOMAS S PAJER ET AL 2H
License Status:
Spud Date:
Permit Date: 2010-01-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.675081
Longitude: -79.751297

For data sources see[1][2][3]

Well History

Date Event
2010-01-22 New Permit Application
2010-04-14 Performed Spud Operation
2010-08-25 Drilling Completion
2010-10-06 Perforation
2010-11-30 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PHILLIPS EXPLORATION INC 174,604.00 81 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 936,604.00 362 0.00 0 0.00 0
2012 XTO ENERGY INC 670,884.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 467,614.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 327,709.00 310 0.00 0 0.00 0
2015 XTO ENERGY INC 356,058.00 363 0.00 0 0.00 0
2016 XTO ENERGY INC 290,189.00 366 0.00 0 0.00 0
2017 XTO ENERGY INC 254,380.70 351 0.00 0 0.00 0
2018 XTO ENERGY INC 238,020.00 337 0.00 0 0.00 0
2019 XTO ENERGY INC 214,757.00 336 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PHILLIPS EXPLORATION INC Produced Fluid 2,290.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 PHILLIPS EXPLORATION INC Produced Fluid 720.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2011 PHILLIPS EXPLORATION INC Produced Fluid 530.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 PHILLIPS EXPLORATION INC Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-133-20114
2011 PHILLIPS EXPLORATION INC Produced Fluid 850.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 200.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2012 XTO ENERGY INC Produced Fluid 252.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012 XTO ENERGY INC Produced Fluid 117.00 Bbl INJECTION DISPOSAL WELL 34-151-22783
2012 XTO ENERGY INC Produced Fluid 1,470.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2012 XTO ENERGY INC Produced Fluid 161.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 84.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2012 XTO ENERGY INC Produced Fluid 116.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2013 XTO ENERGY INC Produced Fluid 482.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2013 XTO ENERGY INC Produced Fluid 98.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2013 XTO ENERGY INC Produced Fluid 100.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2013 XTO ENERGY INC Produced Fluid 100.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014 XTO ENERGY INC Produced Fluid 43.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Produced Fluid 336.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 80.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 XTO ENERGY INC Produced Fluid 80.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2015 XTO ENERGY INC Produced Fluid 545.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Basic Sediment 7.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 274.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 255.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 321.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 410.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 47.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 162.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 55.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Other Oil & Gas Wastes 2.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1877665 Primary Facility 2010-04-16 Drilling/Alteration No Violations Noted
1884272 Primary Facility 2010-05-13 Drilling/Alteration No Violations Noted
1890752 Primary Facility 2010-06-02 Routine/Complete Inspection No Violations Noted
1905864 Primary Facility 2010-08-05 Drilling/Alteration No Violations Noted
1908940 Primary Facility 2010-08-27 Drilling/Alteration No Violations Noted
1988635 Primary Facility 2011-07-14 Routine/Partial Inspection No Violations Noted

For data sources see[7]

References