X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-019-21924"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-019-21924
 
| Well ID: 37-019-21924
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.806047, -79.876314 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.806047, -79.876314 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: HOLY TRINITY MONASTERY A UNIT 4H
 
| Farm/Lease Name: HOLY TRINITY MONASTERY A UNIT 4H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2012-06-18
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2012-01-12
 
| Permit Date: 2012-01-12
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.806047
 
| Latitude: 40.806047
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2012-01-12
 +
| New Permit Application
 +
|-
 +
| 2012-06-18
 +
| Performed Spud Operation
 +
|-
 +
| 2012-07-09
 +
| Drilling Completion
 +
|-
 +
| 2012-09-05
 +
| Perforation
 +
|-
 +
| 2014-03-26
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 62: Line 92:
 
| 2013-01-25
 
| 2013-01-25
 
| 2013-01-25
 
| 2013-01-25
| style="text-align: right;" | 5949.0
+
| style="text-align: right;" | 5,949
| style="text-align: right;" | 5510981.0
+
| style="text-align: right;" | 5,510,981
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
|-
 
|-
Line 308: Line 338:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 384: Line 425:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 158,137.99
 +
| style="text-align: right;" | 184
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 0.00
+
| style="text-align: right;" | 1.66
| style="text-align: right;" | 0
+
| style="text-align: right;" | 25
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
|}
 
|}
Line 409: Line 450:
 
| 2012
 
| 2012
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Drill Cuttings (in Tons)
+
| Drill Cuttings
 
| style="text-align: right;" | 905.92 Tons
 
| style="text-align: right;" | 905.92 Tons
 
| LANDFILL
 
| LANDFILL
Line 416: Line 457:
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Fracing Fluid Waste (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 515.00 Bbl
+
| style="text-align: right;" | 5,967.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0254185
 
| PA0254185
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Fracturing Fluid Waste
| style="text-align: right;" | 522.00 Bbl
+
| style="text-align: right;" | 193.47 Tons
| INJECTION DISPOSAL WELL
+
| LANDFILL
| 34-133-21076
+
| 100585
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 5,967.00 Bbl
+
| style="text-align: right;" | 515.00 Bbl
| CENT WASTE TRT FAC NPDES DISCHARGE
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0254185
 
| PA0254185
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 206.00 Bbl
+
| style="text-align: right;" | 5,967.00 Bbl
| INJECTION DISPOSAL WELL
+
| CENT WASTE TRT FAC NPDES
| 34-155-21438
+
| PA0254185
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 541.00 Bbl
+
| style="text-align: right;" | 555.00 Bbl
| INJECTION DISPOSAL WELL
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 34-133-24096
+
| 101674
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 1,033.00 Bbl
 
| style="text-align: right;" | 1,033.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
Line 458: Line 499:
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Fracturing Fluid Waste (in Tons)
+
| Produced Fluid
| style="text-align: right;" | 193.47 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2013
 
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels)
 
 
| style="text-align: right;" | 779.00 Bbl
 
| style="text-align: right;" | 779.00 Bbl
 
| RESIDUAL WASTE TRANSFER FACILITY
 
| RESIDUAL WASTE TRANSFER FACILITY
Line 472: Line 506:
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Fracing Fluid Waste (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 555.00 Bbl
+
| style="text-align: right;" | 522.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| INJECTION DISPOSAL WELL
| 101674
+
| 34-133-21076
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 85.00 Bbl
 
| style="text-align: right;" | 85.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|  34-133-24189
 
|-
 
|-
| 2014
+
| 2013
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 206.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21438
 +
|-
 +
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 94.00 Bbl
+
| style="text-align: right;" | 541.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23732
+
| 34-133-24096
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 1,306.45 Bbl
 
| style="text-align: right;" | 1,306.45 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 500: Line 541:
 
| 2014
 
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 5,179.99 Bbl
+
| style="text-align: right;" | 62.00 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| CENT WASTE TRT FAC NPDES DISCHARGE
| WMGR123NW009
+
| PA0254185
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 109.48 Bbl
 
| style="text-align: right;" | 109.48 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 514: Line 555:
 
| 2014
 
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 62.00 Bbl
 
| style="text-align: right;" | 62.00 Bbl
| CENT WASTE TRT FAC NPDES DISCHARGE
+
| CENT WASTE TRT FAC NPDES
 
| PA0254185
 
| PA0254185
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 101.00 Bbl
+
| style="text-align: right;" | 5,179.99 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR123SW005
+
| WMGR123NW009
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 120.30 Bbl
 
| style="text-align: right;" | 120.30 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-21438
 
| 34-155-21438
 
|-
 
|-
| 2015
+
| 2014
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 94.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23732
 +
|-
 +
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 2,268.70 Bbl
+
| style="text-align: right;" | 101.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR123NW009
+
| WMGR123SW005
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 793.30 Bbl
 
| style="text-align: right;" | 793.30 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 549: Line 597:
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 208.00 Bbl
 
| style="text-align: right;" | 208.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-133-21076
 
| 34-133-21076
 
|-
 
|-
| 2016
+
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 540.00 Bbl
+
| style="text-align: right;" | 2,268.70 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NW009
 
| WMGR123NW009
Line 563: Line 611:
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
+
| Produced Fluid
 +
| style="text-align: right;" | 198.96 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Soil Contaminated by Oil & Gas Related Spills
 
| style="text-align: right;" | 0.45 Tons
 
| style="text-align: right;" | 0.45 Tons
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 570: Line 625:
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 198.96 Bbl
+
| style="text-align: right;" | 759.00 Bbl
| INJECTION DISPOSAL WELL
+
| RESIDUAL WASTE PROCESSING FACILITY
| 34-133-21076
+
| WMGR123NW009
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 759.00 Bbl
+
| style="text-align: right;" | 540.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NW009
 
| WMGR123NW009
 
|-
 
|-
| 2017
+
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Soil Contaminated by Oil
| style="text-align: right;" | 97.00 Bbl
+
| style="text-align: right;" | 0.45 Tons
| INJECTION DISPOSAL WELL
+
| RESIDUAL WASTE PROCESSING FACILITY
| 34-133-24189
+
| 101674
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 90.00 Bbl
 
| style="text-align: right;" | 90.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 598: Line 653:
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 1,245.24 Bbl
 
| style="text-align: right;" | 1,245.24 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
| WMGR123NW009
 +
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 97.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
|  34-133-24189
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 385.00 Bbl
 
| style="text-align: right;" | 385.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 612: Line 674:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Basic Sediment (in Barrels) RWC 807
+
| Produced Fluid
 +
| style="text-align: right;" | 213.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
|  34-133-24189
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Basic Sediment
 
| style="text-align: right;" | 11.50 Bbl
 
| style="text-align: right;" | 11.50 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| ORDER 2014-04
 
| ORDER 2014-04
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 115.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 93.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 
|-
 
|-
 
|}
 
|}

Latest revision as of 21:09, 21 May 2020

Well Details

Well ID: 37-019-21924
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Penn Township
Operator Name: XTO ENERGY INC
Well Pad ID: 149700
Farm/Lease Name: HOLY TRINITY MONASTERY A UNIT 4H
License Status:
Spud Date:
Permit Date: 2012-01-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.806047
Longitude: -79.876314

For data sources see[1][2][3]

Well History

Date Event
2012-01-12 New Permit Application
2012-06-18 Performed Spud Operation
2012-07-09 Drilling Completion
2012-09-05 Perforation
2014-03-26 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-01-25 2013-01-25 5,949 5,510,981

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Clay Stabilizer - ClayChek G Shrieve Clay Stbilizer None None
Friction Reducer - MC MX-14-5 Multi-Chem Friction Reducer None None
Hydrochloric Acid (15-40) blended down to 15 7647-01-0 15.0 0.365
Hydrotreated light distillates (10-30) 64742-47-8 30.0 0.0223
Other -(non hazardous) 100.0 0.0095
Water 7732-18-5 30.0 0.013
Other -(non hazardous) 50.0 0.0011
Hydrochloric Acid (15-40) blended down to 175 7647-01-0 17.0 0.033
Not Hazardous 70.0 0.029
4,4 -Dimethyloxazolidine 51200-87-4 95.0 0.0089
3,4,4-Trimethyloxazolidine 75673-43-7 4.5 0.0004
2-Amino-2-Methyl-1-Propanol 124-68-5 0.5 None
Glutaraldehyde 111-30-8 60.0 0.003
Other -(non hazardous) 83.0 0.162
Other -(non hazardous) 85.0 2.0684
Hydrochloric Acid (15-40) blended down to 7.5 7647-01-0 7.5 0.0189
Other -(non hazardous) 70.0 0.0521
Short Chained Glycol Ether 112-34-5 50.0 0.0011
Other -(non hazardous) 40.0 0.002
Other -(non hazardous) 92.5 0.2326
Acid Corrosion Inhibitor - EcoAcid CI GeoSafe Corrosion Inhibitor 100.0 None
Biocide - MC 8650 Multi-Chem Biocide None None
Sand Proppant Sand 14808-60-7 100.0 7.4344
Water Water 7732-18-5 100.0 89.5438
Biocide - MC 8520 Multi-Chem Biocide None None
Acid - 15 HCl Acid PPG Acid None None
Scale Inhibitor - MC-MX-588-2 Multi-Chem Scale Inhibitor None None
Acid - 17 HCl Acid PPG Acid None None
Acid - 7.5 HCl Acid PPG Acid None None

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2013 XTO ENERGY INC 296,056.00 190 0.00 0 0.00 0
2014 XTO ENERGY INC 575,037.00 358 0.00 0 0.00 0
2015 XTO ENERGY INC 425,221.00 349 0.00 0 0.00 0
2016 XTO ENERGY INC 282,468.00 338 0.00 0 32.76 112
2017 XTO ENERGY INC 241,685.00 258 0.00 0 1.67 45
2018 XTO ENERGY INC 108,609.27 194 1.25 30 1.88 62
2019 XTO ENERGY INC 158,137.99 184 0.00 0 1.66 25

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 XTO ENERGY INC Drill Cuttings 905.92 Tons LANDFILL 100403
2013 XTO ENERGY INC Produced Fluid 5,967.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2013 XTO ENERGY INC Fracturing Fluid Waste 193.47 Tons LANDFILL 100585
2013 XTO ENERGY INC Fracing Fluid Waste 515.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Produced Fluid 5,967.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2013 XTO ENERGY INC Fracing Fluid Waste 555.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2013 XTO ENERGY INC Produced Fluid 1,033.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2013 XTO ENERGY INC Produced Fluid 779.00 Bbl RESIDUAL WASTE TRANSFER FACILITY 101674
2013 XTO ENERGY INC Produced Fluid 522.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 XTO ENERGY INC Produced Fluid 85.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2013 XTO ENERGY INC Produced Fluid 206.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2013 XTO ENERGY INC Produced Fluid 541.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 XTO ENERGY INC Produced Fluid 1,306.45 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 XTO ENERGY INC Produced Fluid 62.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014 XTO ENERGY INC Produced Fluid 109.48 Bbl INJECTION DISPOSAL WELL 34-155-23223
2014 XTO ENERGY INC Produced Fluid 62.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 XTO ENERGY INC Produced Fluid 5,179.99 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 120.30 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 XTO ENERGY INC Produced Fluid 94.00 Bbl INJECTION DISPOSAL WELL 34-155-23732
2014 XTO ENERGY INC Produced Fluid 101.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 793.30 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 208.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Produced Fluid 2,268.70 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 198.96 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Soil Contaminated by Oil & Gas Related Spills 0.45 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2016 XTO ENERGY INC Produced Fluid 759.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 540.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Soil Contaminated by Oil 0.45 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2017 XTO ENERGY INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 1,245.24 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 97.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Produced Fluid 385.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 213.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Basic Sediment 11.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2014-04
2019 XTO ENERGY INC Produced Fluid 115.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-133-24096

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2078006 Primary Facility 2012-06-21 Drilling/Alteration No Violations Noted
2080682 Primary Facility 2012-07-03 Drilling/Alteration No Violations Noted
2089191 Primary Facility 2012-08-06 Routine/Partial Inspection No Violations Noted
2099024 Primary Facility 2012-09-11 Routine/Partial Inspection No Violations Noted
2146192 Primary Facility 2013-03-06 Routine/Partial Inspection No Violations Noted
2169419 Primary Facility 2013-05-21 Routine/Partial Inspection No Violations Noted
2715727 Primary Facility 2018-04-04 Routine/Partial Inspection No Violations Noted At the time of inspection, well had 900 psi on the production casing gauge. Most recent production reported was in January of this year and well had been temporarily shut-in. Well was properly labeled and Emergency Response sign remains posted. There was a methanol tank next to the well. Cellar was filled with water, but no bubbling seen. There were 3 tanks and 2 line heaters within a lined, steel dike. Dike had quite a bit of water within it as well.

For data sources see[8]

References