X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-019-22119"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-019-22119
 
| Well ID: 37-019-22119
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.829947, -79.888453 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.829947, -79.888453 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: HINCH SMITH UNIT 6H
 
| Farm/Lease Name: HINCH SMITH UNIT 6H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2013-10-23
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2013-08-15
 
| Permit Date: 2013-08-15
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.829947
 
| Latitude: 40.829947
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2013-08-15
 +
| New Permit Application
 +
|-
 +
| 2013-10-23
 +
| Performed Spud Operation
 +
|-
 +
| 2014-02-23
 +
| Drilling Completion
 +
|-
 +
| 2014-06-05
 +
| Perforation
 +
|-
 +
| 2015-02-17
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 62: Line 92:
 
| 2014-06-30
 
| 2014-06-30
 
| 2014-08-20
 
| 2014-08-20
| style="text-align: right;" | 5883
+
| style="text-align: right;" | 5,883
| style="text-align: right;" | 4,585,360.0
+
| style="text-align: right;" | 4,585,360
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 344: Line 374:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 411: Line 452:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| style="text-align: right;" | 44,262.96
+
| style="text-align: right;" | 107,857.01
| style="text-align: right;" | 90
+
| style="text-align: right;" | 304
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 5.21
+
| style="text-align: right;" | 25.85
| style="text-align: right;" | 59
+
| style="text-align: right;" | 210
 
|-
 
|-
 
|}
 
|}
Line 436: Line 477:
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Drill Cuttings (in Tons)
+
| Drill Cuttings
 
| style="text-align: right;" | 611.00 Tons
 
| style="text-align: right;" | 611.00 Tons
 
| LANDFILL
 
| LANDFILL
Line 443: Line 484:
 
| 2014
 
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Fracing Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 118.00 Bbl
+
| style="text-align: right;" | 1,732.53 Bbl
| INJECTION DISPOSAL WELL
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| 34-133-24096
+
| WMGR123NW009
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Fracing Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
 
| style="text-align: right;" | 2,001.30 Bbl
 
| style="text-align: right;" | 2,001.30 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
Line 457: Line 498:
 
| 2014
 
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Fracing Fluid Waste (in Barrels)
+
| Drill Cuttings
| style="text-align: right;" | 1,732.53 Bbl
+
| style="text-align: right;" | 387.53 Tons
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| LANDFILL
| WMGR123NW009
+
| 100403
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Drill Cuttings (in Tons)
+
| Fracing Fluid Waste
| style="text-align: right;" | 387.53 Tons
+
| style="text-align: right;" | 118.00 Bbl
| LANDFILL
+
| INJECTION DISPOSAL WELL
| 100403
+
| 34-133-24096
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 322.00 Bbl
 
| style="text-align: right;" | 322.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
Line 478: Line 519:
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 444.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 5,672.00 Bbl
 
| style="text-align: right;" | 5,672.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
Line 485: Line 533:
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 1,270.40 Bbl
+
| style="text-align: right;" | 120.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-24096
+
| 34-133-20114
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 120.00 Bbl
+
| style="text-align: right;" | 1,270.40 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-20114
+
| 34-133-24096
 
|-
 
|-
| 2015
+
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 444.00 Bbl
+
| style="text-align: right;" | 1,259.00 Bbl
| INJECTION DISPOSAL WELL
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| 34-133-21076
+
| WMGR123NW009
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Soil Contaminated by Oil & Gas Related Spills
| style="text-align: right;" | 120.00 Bbl
+
| style="text-align: right;" | 0.03 Tons
| INJECTION DISPOSAL WELL
+
| RESIDUAL WASTE PROCESSING FACILITY
| 34-133-24096
+
| 101674
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Soil Contaminated by Oil
| style="text-align: right;" | 1,043.00 Bbl
+
| style="text-align: right;" | 0.03 Tons
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123NW009
+
| 101674
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 120.00 Bbl
 
| style="text-align: right;" | 120.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-21076
+
| 34-133-24096
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 111.00 Bbl
+
| style="text-align: right;" | 120.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-24189
+
| 34-133-21076
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 1,259.00 Bbl
+
| style="text-align: right;" | 1,043.00 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
| WMGR123NW009
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
+
| Produced Fluid
| style="text-align: right;" | 0.03 Tons
+
| style="text-align: right;" | 111.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| INJECTION DISPOSAL WELL
| 101674
+
| 34-133-24189
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 120.00 Bbl
+
| style="text-align: right;" | 177.92 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-24096
+
| 34-133-24189
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 177.92 Bbl
+
| style="text-align: right;" | 120.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-24189
+
| 34-133-24096
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 512.00 Bbl
 
| style="text-align: right;" | 512.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 569: Line 617:
 
| 2018
 
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Other Oil & Gas Wastes
 
| style="text-align: right;" | 5.00 Bbl
 
| style="text-align: right;" | 5.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 576: Line 624:
 
| 2018
 
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 975.50 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2018
 
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
 
| style="text-align: right;" | 74.00 Bbl
 
| style="text-align: right;" | 74.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2019
+
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 450.00 Bbl
+
| style="text-align: right;" | 975.50 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
| WMGR123NW009
Line 597: Line 638:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 119.00 Bbl
+
| style="text-align: right;" | 305.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
| 34-133-24096
Line 604: Line 645:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 328.00 Bbl
+
| style="text-align: right;" | 531.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|  34-133-24189
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,202.42 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 217.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 
|-
 
|-
 
|}
 
|}

Latest revision as of 21:29, 21 May 2020

Well Details

Well ID: 37-019-22119
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Butler Township
Operator Name: XTO ENERGY INC
Well Pad ID: 145480
Farm/Lease Name: HINCH SMITH UNIT 6H
License Status:
Spud Date:
Permit Date: 2013-08-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.829947
Longitude: -79.888453

For data sources see[1][2][3]

Well History

Date Event
2013-08-15 New Permit Application
2013-10-23 Performed Spud Operation
2014-02-23 Drilling Completion
2014-06-05 Perforation
2015-02-17 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-06-30 2014-08-20 5,883 4,585,360 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCl Acid (0-7.5%), 22 Baume Nabors Completion and Production Services Bulk Acid 7647-01-0 100 0.022692 0
7647-01-0 100 0.016637 0
Water 7732-18-5 100 0.020334 0
Water 7732-18-5 100 0.103377 0
PA Specific 40/70 mesh Sand Nabors Completion and Production Services Sand - Bulk - Pennsylvania Iron Oxide 1309-37-1 0.1 0.003024 0
Titanium Oxide 13463-67-7 0.1 0.003024 0
Aluminum Oxide 1344-28-1 1.1 0.033268 0
Crystalline Silica, quartz 14808-60-7 99.9 3.02138 0
KR-153SL Nabors Completion and Production Services Biocides 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.003312 0
Polyethlyene-Glycol 25322-68-3 50 0.008279 0
Super TSC 2 LT Nabors Completion and Production Services Paraffin & Scale Additives Bis(hexamethylene)triamine Penta
(methylene phosphonic acid), Sodium Salt
35657-77-3 15 0.001295 0
Other Ingredients Nabors Completion and Production Services Other Ingredients Water 7732-18-5 40 0.022559 0
Petroleum distillate hydrotreated light 64742-47-8 35 0.019739 0
Water 7732-18-5 48 0.000763 0
Alcohol Ethoxylates Component 69227-21-0 5 0.00282 0
2-Butoxyethanol 111-76-2 13 0.000207 0
Water 7732-18-5 80 0.013247 0
Alcohol Ethoxylates component 68585-36-4 5 0.00282 0
38193-60-1 35 0.019739 0
Water 7732-18-5 90 0.007768 0
Sorbitan Monooleate 1338-43-8 5 0.00282 0
Ethylene Glycol 107-21-1 4 0.002256 0
Dioxane 123-91-1 1 0.00001600 0
Acid Inhibitor 2 (AI-2) Nabors Completion and Production Services Acid Corrosion Inhibitors Ethoxylated Nonylphenol 68412-54-4 13 0.000207 0
Glycol Ethers 111-46-6 40 0.000636 0
Isopropyl Alcohol 67-63-0 40 0.000636 0
Propargyl Alcohol 107-19-7 40 0.000636 0
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10 0.000159 0
Water XTO Energy/ExxonMobil Water Water 7732-18-5 100 89.7695 0
HCl Acid (12.5-18.0%), 22 Baume Nabors Completion and Production Services Bulk Acid Water 7732-18-5 100 0.103377 0
Water 7732-18-5 100 0.020334 0
7647-01-0 100 0.022692 0
7647-01-0 100 0.016637 0
PA Specific 30/50 mesh Sand Nabors Completion and Production Services Sand - Bulk - Pennsylvania Titanium Oxide 13463-67-7 0.1 0.00696 0
Iron Oxide 1309-37-1 0.1 0.00696 0
Crystalline Silica, quartz 14808-60-7 99.9 6.95289 0
Aluminum Oxide 1344-28-1 1.1 0.076558 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2014 XTO ENERGY INC 21,961.00 14 0.00 0 0.00 0
2015 XTO ENERGY INC 158,571.00 344 0.00 0 0.00 0
2016 XTO ENERGY INC 100,793.00 319 0.00 0 31.20 108
2017 XTO ENERGY INC 37,740.00 150 0.00 0 5.01 88
2018 XTO ENERGY INC 143,036.82 305 37.35 30 219.74 212
2019 XTO ENERGY INC 107,857.01 304 0.00 0 25.85 210

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 XTO ENERGY INC Drill Cuttings 611.00 Tons LANDFILL 100403
2014 XTO ENERGY INC Fracing Fluid Waste 1,732.53 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Fracing Fluid Waste 2,001.30 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Drill Cuttings 387.53 Tons LANDFILL 100403
2014 XTO ENERGY INC Fracing Fluid Waste 118.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 322.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 444.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Produced Fluid 5,672.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2015 XTO ENERGY INC Produced Fluid 1,270.40 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 1,259.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Soil Contaminated by Oil & Gas Related Spills 0.03 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2016 XTO ENERGY INC Soil Contaminated by Oil 0.03 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2016 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Produced Fluid 1,043.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 111.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 177.92 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 512.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Other Oil & Gas Wastes 5.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 74.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XTO ENERGY INC Produced Fluid 975.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 305.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 531.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 1,202.42 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 217.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2215297 Primary Facility 2013-10-23 Drilling/Alteration No Violations Noted
2222782 Primary Facility 2013-11-14 Drilling/Alteration No Violations Noted
2224074 Primary Facility 2013-11-22 Drilling/Alteration No Violations Noted
2236851 Primary Facility 2014-01-14 Routine/Partial Inspection No Violations Noted
2249575 Primary Facility 2014-02-24 Drilling/Alteration No Violations Noted
2264967 Primary Facility 2014-04-23 Drilling/Alteration No Violations Noted
2316188 Primary Facility 2014-10-27 Routine/Partial Inspection No Violations Noted
2543515 Primary Facility 2016-12-07 Routine/Partial Inspection No Violations Noted
2651170 Primary Facility 2017-10-24 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Well has been drilled, completed, and in production. Well head is fenced, is protected with jersey barriers, and has a well tag. Production equipment (tank battery & GPU) on secondary containment. Combustor on site. Gathering pipeline header on site off the well pad. Site ID sign on site.

PCSM plan implemented & PCSM BMPs installed. Site has 100% vegetation.

2699780 Primary Facility 2018-02-27 Routine/Partial Inspection No Violations Noted On 02/27/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance. Ten wells installed and tagged. Nine in production. The 1H Permit No. 37-019-21878 currently in inactive status. Tank battery consists of eleven 400 bbl tanks installed within secondary steel containment structure. Freshwater impoundment installed and fenced in adjacent to well pad. No apparent issues.
2715720 Primary Facility 2018-04-04 Routine/Partial Inspection No Violations Noted At the time of inspection, well was producing. The tubing gauge was broken so no reading was taken. Well was properly labeled and the Emergency Response sign is posted at the lease entrance. There was a very large lined, steel dike that had 7 tanks on one side and 4 on the other. All except 1 are for produced water. Each tank is labeled for which well it is associated with. The separators are also labeled. There are 10 of these with line heaters and are between the tanks. There was also a lined impoundment along the lease road. It still had plenty of freeboard, even after the heavy rains.
2842810 Primary Facility 2019-02-21 Routine/Partial Inspection No Violations Noted On 2/21/2019, WQS Brian MacQuarrie onsite. While onsite meet Bill Rice (XTO-well tender). Ten wells in production; 1H (019-21878), 2H (019-21952), 3H (019-21953), 4H (019-21923), 5H (019-22159), 6H (019-22119), 7H (019-22120), 8H (019-22084), 9H (019-22085) and 10HB (019-22205). Tank battery consists of eleven 400 bbl tanks installed within containment structure ( ten tanks containing production water and one tank containing condensate). Ten gas processing units installed within containment structure. Freshwater impoundment fenced in and locked. Well sign and access road maintained. Previously disturbed areas vegetated and restored. Erosion and Sedimentation BMPs maintained.

For data sources see[8]

References