X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-019-22390"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-019-22390
 
| Well ID: 37-019-22390
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.843075, -79.831247 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.843075, -79.831247 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: KOZIK BROTHERS B UNIT 7H
 
| Farm/Lease Name: KOZIK BROTHERS B UNIT 7H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2015-06-04
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2015-02-27
 
| Permit Date: 2015-02-27
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.843075
 
| Latitude: 40.843075
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2015-02-27
 +
| New Permit Application
 +
|-
 +
| 2015-06-04
 +
| Performed Spud Operation
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 62: Line 83:
 
| 2015-11-01
 
| 2015-11-01
 
| 2015-11-10
 
| 2015-11-10
| style="text-align: right;" | 6072
+
| style="text-align: right;" | 6,072
| style="text-align: right;" | 13,096,400.0
+
| style="text-align: right;" | 13,096,400
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 392: Line 413:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 441: Line 473:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| style="text-align: right;" | 177,838.91
+
| style="text-align: right;" | 681,552.96
| style="text-align: right;" | 90
+
| style="text-align: right;" | 363
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 7.50
+
| style="text-align: right;" | 35.41
| style="text-align: right;" | 90
+
| style="text-align: right;" | 243
 
|-
 
|-
 
|}
 
|}
Line 466: Line 498:
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Drilling Fluid Waste (in Barrels)
+
| Drill Cuttings
 +
| style="text-align: right;" | 1,387.27 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| Drilling Fluid Waste
 
| style="text-align: right;" | 323.00 Bbl
 
| style="text-align: right;" | 323.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NW009
 
| WMGR123NW009
 
|-
 
|-
| 2015
+
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 12,889.05 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW009
 +
|-
 +
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Drill Cuttings (in Tons)
+
| Filter Socks
| style="text-align: right;" | 1,387.27 Tons
+
| style="text-align: right;" | 0.05 Tons
 
| LANDFILL
 
| LANDFILL
| 100585
+
| 100403
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 330.00 Bbl
 
| style="text-align: right;" | 330.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 487: Line 533:
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 6,784.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2016
 
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
 
| style="text-align: right;" | 120.00 Bbl
 
| style="text-align: right;" | 120.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 501: Line 540:
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Fracturing Fluid Waste
| style="text-align: right;" | 227.30 Bbl
+
| style="text-align: right;" | 69.78 Tons
| INJECTION DISPOSAL WELL
+
| RESIDUAL WASTE TRANSFER FACILITY
| 34-133-24189
+
| 101674
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Filter Socks (in Tons) RWC 812
+
| Produced Fluid
| style="text-align: right;" | 0.05 Tons
+
| style="text-align: right;" | 6,784.00 Bbl
| LANDFILL
+
| RESIDUAL WASTE PROCESSING FACILITY
| 100403
 
|-
 
| 2016
 
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 12,889.05 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
 
| WMGR123NW009
 
| WMGR123NW009
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Fracturing Fluid Waste (in Tons) RWC 805
+
| Produced Fluid
| style="text-align: right;" | 69.78 Tons
+
| style="text-align: right;" | 227.30 Bbl
| RESIDUAL WASTE TRANSFER FACILITY
+
| INJECTION DISPOSAL WELL
| 101674
+
| 34-133-24189
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 2,678.17 Bbl
+
| style="text-align: right;" | 2,303.36 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-24189
+
| 34-133-21076
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 422.00 Bbl
 
| style="text-align: right;" | 422.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 543: Line 575:
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 1,034.93 Bbl
+
| style="text-align: right;" | 2,678.17 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-24096
+
| 34-133-24189
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 12,437.57 Bbl
 
| style="text-align: right;" | 12,437.57 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 557: Line 589:
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 2,303.36 Bbl
+
| style="text-align: right;" | 1,034.93 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 80.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-21076
+
| 34-133-24189
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 10,996.76 Bbl
 
| style="text-align: right;" | 10,996.76 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 571: Line 610:
 
| 2018
 
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 752.74 Bbl
 
| style="text-align: right;" | 752.74 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
| 34-133-24096
 
|-
 
|-
| 2018
+
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 80.00 Bbl
+
| style="text-align: right;" | 4,163.96 Bbl
| INJECTION DISPOSAL WELL
+
| RESIDUAL WASTE PROCESSING FACILITY
| 34-133-24189
+
| WMGR123NW009
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 363.00 Bbl
+
| style="text-align: right;" | 2,482.86 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-21076
+
| 34-133-24096
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 668.00 Bbl
+
| style="text-align: right;" | 1,545.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|  34-133-24189
Line 599: Line 638:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 1,159.00 Bbl
+
| style="text-align: right;" | 1,087.45 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2019
 
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 374.86 Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-24096
+
| 34-133-21076
 
|-
 
|-
 
|}
 
|}

Latest revision as of 21:56, 21 May 2020

Well Details

Well ID: 37-019-22390
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Summit Township
Operator Name: XTO ENERGY INC
Well Pad ID: 144652
Farm/Lease Name: KOZIK BROTHERS B UNIT 7H
License Status:
Spud Date:
Permit Date: 2015-02-27
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.843075
Longitude: -79.831247

For data sources see[1][2][3]

Well History

Date Event
2015-02-27 New Permit Application
2015-06-04 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-11-01 2015-11-10 6,072 13,096,400 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SI-4 C&J Well Services Paraffin & Scale Additives Bis(hexamethylene triaminepenta
(methylenephosphonic acid))
Proprietary 10 0.001681 0
HCl Acid (12.5-18.0%), 22 Baume C&J Well Services Bulk Acid Water 7732-18-5 87.5 0.031283 0
Hydrochloric Acid 7647-01-0 18 0.006435 0
Other Ingredients C&J Well Services Other Ingredients Surfactant Blend Proprietary 1 0.000599 0
Surfactant Blend Proprietary 3 0.001796 0
2-Propenamide as residual 79-06-1 0.1 0.00006000 0
Monobromo-3-nitrilopropionamide 1113-55-9 1 0.000212 0
Copolymer Proprietary 35 0.020952 0
Proprietary Proprietary 0.02 0 0
2,2-Dibromomalonamide 73003-80-2 1 0.000212 0
Water 7732-18-5 48 0.000285 0
Water 7732-18-5 96 0.016137 0
Poly(oxy-1,2-ethanediyl), a-hydro-w-hydroxy-,
mono-C10-14-alkyl esthers, phosphates
68585-36-4 3 0.001796 0
Alcohols, C12-18, ethoxylated propoxylated 69227-21-0 2 0.001197 0
Water 7732-18-5 92.5 0.507454 0
Water 7732-18-5 31 0.018558 0
Sodium Hydroxide 1310-73-2 1 0.000168 0
Glycol Ethers 111-46-6 40 0.000237 0
Proprietary Proprietary 0.99 0.00000600 0
Water 7732-18-5 32 0.006788 0
Acid Inhibitor 2 (AI-2) C&J Well Services Acid Corrosion Inhibitors Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10 0.00005900 0
Proprietary Proprietary 15 0.00008900 0
Isopropyl Alcohol 67-63-0 20 0.000119 0
Propargyl Alcohol 107-19-7 20 0.000119 0
2-Butoxyethanol 111-76-2 20 0.000119 0
FR-16 C&J Well Services Friction Reducer Distillates (Petroleum), Hydrotreated Light 64742-47-8 45 0.026939 0
Ethylene Glycol 107-21-1 5 0.002993 0
Sand C&J Well Services Sand - Bulk - Pennsylvania Aluminum Oxide 1344-28-1 1.1 0.011197 0
Crystalline Silica, quartz 14808-60-7 99.9 1.01688 0
Aluminum Oxide 1344-28-1 1.1 0.067112 0
Crystalline Silica, quartz 14808-60-7 99.9 3.00904 0
Crystalline Silica, quartz 14808-60-7 99.9 6.09501 0
Iron Oxide 1309-37-1 0.1 0.003012 0
Titanium Oxide 13463-67-7 0.1 0.003012 0
Aluminum Oxide 1344-28-1 1.1 0.033133 0
Iron Oxide 1309-37-1 0.1 0.001018 0
Titanium Oxide 13463-67-7 0.1 0.006101 0
Titanium Oxide 13463-67-7 0.1 0.001018 0
Iron Oxide 1309-37-1 0.1 0.006101 0
Water XTO Energy/ExxonMobil Water Water 7732-18-5 100 89.1861 0
HCl Acid (0-7.5%), 22 Baume C&J Well Services Bulk Acid Hydrochloric Acid 7647-01-0 7.5 0.041145 0
AQUCAR DB 20 C&J Well Services Biocides 2,2-Dibromo-3-nitrilo-propionamide (DBNPA) 10222-01-2 20 0.004242 0
Dibromoacetonitrile 3252-43-5 3 0.000636 0
Sodium bromide 7647-15-6 4 0.000848 0
Polyethylene glycol 25322-68-3 54.5 0.01156 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2016 XTO ENERGY INC 531,665.00 256 0.00 0 1,714.38 239
2017 XTO ENERGY INC 1,004,107.00 357 0.00 0 726.61 327
2018 XTO ENERGY INC 831,908.11 336 2.50 30 118.46 282
2019 XTO ENERGY INC 681,552.96 363 0.00 0 35.41 243

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 XTO ENERGY INC Drill Cuttings 1,387.27 Tons LANDFILL 100585
2015 XTO ENERGY INC Drilling Fluid Waste 323.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 12,889.05 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Filter Socks 0.05 Tons LANDFILL 100403
2016 XTO ENERGY INC Produced Fluid 330.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Fracturing Fluid Waste 69.78 Tons RESIDUAL WASTE TRANSFER FACILITY 101674
2016 XTO ENERGY INC Produced Fluid 6,784.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 227.30 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 2,303.36 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 422.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 2,678.17 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 12,437.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 1,034.93 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Produced Fluid 10,996.76 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 752.74 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 4,163.96 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 2,482.86 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 1,545.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 1,087.45 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2377854 Primary Facility 2015-06-09 Routine/Partial Inspection No Violations Noted
2383831 Primary Facility 2015-06-24 Drilling/Alteration No Violations Noted
2384725 Primary Facility 2015-07-02 Drilling/Alteration No Violations Noted
2386676 Primary Facility 2015-07-09 Routine/Partial Inspection No Violations Noted
2569616 Primary Facility 2017-02-28 Routine/Partial Inspection No Violations Noted
2692736 Primary Facility 2018-02-09 Routine/Partial Inspection No Violations Noted On 2//09/2018, WQS Brian MacQuarrie onsite. Site sign posted and maintained at entrance. Five wells properly tagged and in production. Six 400 bbl tanks installed within secondary containment. Five gas processing units installed within secondary containment. Snow on ground during inspection. No apparent issues.

For data sources see[8]

References