X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-019-22398"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-019-22398
 
| Well ID: 37-019-22398
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.949039, -79.935839 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.949039, -79.935839 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: FLEEGER UNIT 4H
 
| Farm/Lease Name: FLEEGER UNIT 4H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2015-04-16
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2015-02-11
 
| Permit Date: 2015-02-11
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.949039
 
| Latitude: 40.949039
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2015-02-11
 +
| New Permit Application
 +
|-
 +
| 2015-04-16
 +
| Performed Spud Operation
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 92:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 123: Line 155:
 
| 2019
 
| 2019
 
| [[PENNENERGY RESOURCES LLC]]
 
| [[PENNENERGY RESOURCES LLC]]
| style="text-align: right;" | 119,089.00
+
| style="text-align: right;" | 456,430.00
| style="text-align: right;" | 86
+
| style="text-align: right;" | 357
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 614.00
+
| style="text-align: right;" | 2,120.00
| style="text-align: right;" | 86
+
| style="text-align: right;" | 357
 
|-
 
|-
 
|}
 
|}
Line 147: Line 179:
 
|-
 
|-
 
| 2015
 
| 2015
|  
+
| [[RE GAS DEV LLC]]
| Drill Cuttings (in Tons)
+
| Drill Cuttings
 
| style="text-align: right;" | 875.91 Tons
 
| style="text-align: right;" | 875.91 Tons
 
| LANDFILL
 
| LANDFILL
Line 154: Line 186:
 
|-
 
|-
 
| 2015
 
| 2015
|  
+
| [[RE GAS DEV LLC]]
| Fracturing Fluid Waste (in Tons)
+
| Fracturing Fluid Waste
 
| style="text-align: right;" | 3.95 Tons
 
| style="text-align: right;" | 3.95 Tons
 
| LANDFILL
 
| LANDFILL
Line 162: Line 194:
 
| 2016
 
| 2016
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 277.50 Bbl
 
| style="text-align: right;" | 277.50 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
Line 169: Line 201:
 
| 2016
 
| 2016
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Fracturing Fluid Waste
| style="text-align: right;" | 110.00 Bbl
+
| style="text-align: right;" | 37.05 Tons
| RESIDUAL WASTE PROCESSING FACILITY
+
| LANDFILL
| WMGR123SW019
+
| CID # 28726
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 60.00 Bbl
+
| style="text-align: right;" | 281.71 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 3192
+
| WMGR123SW019
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 281.71 Bbl
+
| style="text-align: right;" | 110.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW019
 
| WMGR123SW019
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Fracturing Fluid Waste (in Tons) RWC 805
+
| Produced Fluid
| style="text-align: right;" | 37.05 Tons
+
| style="text-align: right;" | 200.00 Bbl
| LANDFILL
+
| INJECTION DISPOSAL WELL
| CID # 28726
+
| 34-007-21847
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 200.00 Bbl
+
| style="text-align: right;" | 60.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 3192
 +
|-
 +
| 2017
 +
| [[RE GAS DEV LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 30.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-007-21847
+
| 34-099-23158
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 165.00 Bbl
 
| style="text-align: right;" | 165.00 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2017
+
| 2018
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 30.00 Bbl
+
| style="text-align: right;" | 90.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
| 34-099-23158
Line 218: Line 257:
 
| 2018
 
| 2018
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 312.00 Bbl
 
| style="text-align: right;" | 312.00 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018
+
| 2019
| [[RE GAS DEV LLC]]
+
| [[PENNENERGY RESOURCES LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 90.00 Bbl
+
| style="text-align: right;" | 491.83 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 826.82 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
| 34-099-23158

Latest revision as of 21:57, 21 May 2020

Well Details

Well ID: 37-019-22398
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Center Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 152198
Farm/Lease Name: FLEEGER UNIT 4H
License Status:
Spud Date:
Permit Date: 2015-02-11
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.949039
Longitude: -79.935839

For data sources see[1][2][3]

Well History

Date Event
2015-02-11 New Permit Application
2015-04-16 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 RE GAS DEV LLC 0.00 0 0.00 0 0.00 0
2016 RE GAS DEV LLC 656,820.98 288 0.00 0 5,158.71 288
2017 RE GAS DEV LLC 625,292.41 340 0.00 0 3,261.64 340
2018 PENNENERGY RESOURCES LLC 515,739.26 355 0.00 0 2,931.41 355
2019 PENNENERGY RESOURCES LLC 456,430.00 357 0.00 0 2,120.00 357

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 RE GAS DEV LLC Drill Cuttings 875.91 Tons LANDFILL 100585
2015 RE GAS DEV LLC Fracturing Fluid Waste 3.95 Tons LANDFILL CID # 28726
2016 RE GAS DEV LLC Produced Fluid 277.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RE GAS DEV LLC Fracturing Fluid Waste 37.05 Tons LANDFILL CID # 28726
2016 RE GAS DEV LLC Produced Fluid 281.71 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RE GAS DEV LLC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RE GAS DEV LLC Produced Fluid 200.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2016 RE GAS DEV LLC Produced Fluid 60.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192
2017 RE GAS DEV LLC Produced Fluid 30.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 RE GAS DEV LLC Produced Fluid 165.00 Bbl REUSE (AT WELL PAD)
2018 RE GAS DEV LLC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 RE GAS DEV LLC Produced Fluid 312.00 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 491.83 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 826.82 Bbl INJECTION DISPOSAL WELL 34-099-23158

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2364268 Primary Facility 2015-04-21 Routine/Partial Inspection No Violations Noted
2368200 Primary Facility 2015-05-07 Routine/Partial Inspection No Violations Noted
2397151 Primary Facility 2015-08-06 Drilling/Alteration No Violations Noted
2398706 Primary Facility 2015-08-11 Routine/Partial Inspection No Violations Noted
2511380 Primary Facility 2016-08-16 Administrative/File Review No Violations Noted
2729245 Primary Facility 2018-05-10 Routine/Partial Inspection No Violations Noted At the time of inspection, well was producing. Well integrity was in good condition, with no signs of any leaks or spills at the site. Well was properly labeled and the Emergency Response sign remains posted at the site entrance. There were 4 separators, 2 dual line heaters, and 5 tanks all within a lined, steel dike. 4 tanks were being used for produced water and the other for condensate. There was also a gas buster hooked up at the site. The pad is fenced in with a locked gate. Production is being reported to the Department.

For data sources see[7]

References