If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-019-22445 | | Well ID: 37-019-22445 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.822772, -79.752464 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 17: | Line 17: | ||
| Well Pad ID: [[152624]] | | Well Pad ID: [[152624]] | ||
|- | |- | ||
− | | Farm/Lease Name: GALAN A UNIT | + | | Farm/Lease Name: GALAN A UNIT |
|- | |- | ||
| License Status: Active | | License Status: Active | ||
|- | |- | ||
− | | Spud Date: 2015-07- | + | | Spud Date: 2015-07-28 |
|- | |- | ||
| Permit Date: 2015-06-23 | | Permit Date: 2015-06-23 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
|- | |- | ||
| Configuration: Horizontal Well | | Configuration: Horizontal Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 40.822772 | | Latitude: 40.822772 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2015-06-23 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2015-07-27 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2015-09-04 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2016-04-21 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-05-11 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-05-11 | ||
+ | | Performed Stage 1 of Stimulation | ||
+ | |- | ||
+ | | 2016-05-12 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-05-12 | ||
+ | | Performed Stage 2 of Stimulation | ||
+ | |- | ||
+ | | 2016-05-13 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-05-13 | ||
+ | | Performed Stage 3 of Stimulation | ||
+ | |- | ||
+ | | 2016-05-14 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-05-14 | ||
+ | | Performed Stage 4 of Stimulation | ||
+ | |- | ||
+ | | 2016-05-16 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-05-16 | ||
+ | | Performed Stage 5 of Stimulation | ||
+ | |- | ||
+ | | 2016-05-17 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-05-17 | ||
+ | | Performed Stage 6 of Stimulation | ||
+ | |- | ||
+ | | 2016-05-18 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-05-18 | ||
+ | | Performed Stage 7 of Stimulation | ||
+ | |- | ||
+ | | 2016-05-19 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-05-19 | ||
+ | | Performed Stage 8 of Stimulation | ||
+ | |- | ||
+ | | 2016-05-20 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-05-20 | ||
+ | | Performed Stage 10 of Stimulation | ||
+ | |- | ||
+ | | 2016-05-20 | ||
+ | | Performed Stage 9 of Stimulation | ||
+ | |- | ||
+ | | 2016-05-21 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-05-21 | ||
+ | | Performed Stage 11 of Stimulation | ||
+ | |- | ||
+ | | 2016-05-23 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-05-23 | ||
+ | | Performed Stage 12 of Stimulation | ||
+ | |- | ||
+ | | 2016-05-24 | ||
+ | | Performed Stage 13 of Stimulation | ||
+ | |- | ||
+ | | 2016-05-25 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-05-25 | ||
+ | | Performed Stage 14 of Stimulation | ||
+ | |- | ||
+ | | 2016-05-26 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-05-26 | ||
+ | | Performed Stage 15 of Stimulation | ||
+ | |- | ||
+ | | 2016-05-26 | ||
+ | | Performed Stage 16 of Stimulation | ||
+ | |- | ||
+ | | 2016-05-27 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-05-27 | ||
+ | | Performed Stage 17 of Stimulation | ||
+ | |- | ||
+ | | 2016-05-28 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-05-28 | ||
+ | | Performed Stage 18 of Stimulation | ||
+ | |- | ||
+ | | 2016-05-31 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-05-31 | ||
+ | | Performed Stage 19 of Stimulation | ||
+ | |- | ||
+ | | 2016-05-31 | ||
+ | | Performed Stage 20 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-01 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-01 | ||
+ | | Performed Stage 21 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-02 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-02 | ||
+ | | Performed Stage 22 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-02 | ||
+ | | Performed Stage 23 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-03 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-03 | ||
+ | | Performed Stage 24 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-04 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-04 | ||
+ | | Performed Stage 25 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-06 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-06-06 | ||
+ | | Performed Stage 26 of Stimulation | ||
+ | |- | ||
+ | | 2016-06-06 | ||
+ | | Performed Stage 27 of Stimulation | ||
+ | |- | ||
+ | | 2017-01-03 | ||
+ | | Deviated | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
== Fracking Activities == | == Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 62: | Line 236: | ||
| 2016-05-11 | | 2016-05-11 | ||
| 2016-06-06 | | 2016-06-06 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 6,153 |
− | | style="text-align: right;" | 14,693,800 | + | | style="text-align: right;" | 14,693,800 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 374: | Line 548: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-06-19 }}</ref> | | accessdate = 2019-06-19 }}</ref> | ||
+ | == Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | | 2016-05-11 | ||
+ | | style="text-align: right;" | 1 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 7,349 | ||
+ | | style="text-align: right;" | 4,576 | ||
+ | |- | ||
+ | | 2016-05-12 | ||
+ | | style="text-align: right;" | 2 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 7,639 | ||
+ | | style="text-align: right;" | 6,325 | ||
+ | |- | ||
+ | | 2016-05-13 | ||
+ | | style="text-align: right;" | 3 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 7,551 | ||
+ | | style="text-align: right;" | 6,115 | ||
+ | |- | ||
+ | | 2016-05-14 | ||
+ | | style="text-align: right;" | 4 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 7,481 | ||
+ | | style="text-align: right;" | 5,475 | ||
+ | |- | ||
+ | | 2016-05-16 | ||
+ | | style="text-align: right;" | 5 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 7,682 | ||
+ | | style="text-align: right;" | 5,502 | ||
+ | |- | ||
+ | | 2016-05-17 | ||
+ | | style="text-align: right;" | 6 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 7,304 | ||
+ | | style="text-align: right;" | 6,226 | ||
+ | |- | ||
+ | | 2016-05-18 | ||
+ | | style="text-align: right;" | 7 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 7,885 | ||
+ | | style="text-align: right;" | 6,101 | ||
+ | |- | ||
+ | | 2016-05-19 | ||
+ | | style="text-align: right;" | 8 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 7,169 | ||
+ | | style="text-align: right;" | 6,099 | ||
+ | |- | ||
+ | | 2016-05-20 | ||
+ | | style="text-align: right;" | 9 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 6,933 | ||
+ | | style="text-align: right;" | 5,288 | ||
+ | |- | ||
+ | | 2016-05-20 | ||
+ | | style="text-align: right;" | 10 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 7,358 | ||
+ | | style="text-align: right;" | 6,779 | ||
+ | |- | ||
+ | | 2016-05-21 | ||
+ | | style="text-align: right;" | 11 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 7,046 | ||
+ | | style="text-align: right;" | 6,929 | ||
+ | |- | ||
+ | | 2016-05-23 | ||
+ | | style="text-align: right;" | 12 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 7,438 | ||
+ | | style="text-align: right;" | 6,222 | ||
+ | |- | ||
+ | | 2016-05-24 | ||
+ | | style="text-align: right;" | 13 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 6,872 | ||
+ | | style="text-align: right;" | 6,337 | ||
+ | |- | ||
+ | | 2016-05-25 | ||
+ | | style="text-align: right;" | 14 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 6,812 | ||
+ | | style="text-align: right;" | 5,642 | ||
+ | |- | ||
+ | | 2016-05-26 | ||
+ | | style="text-align: right;" | 15 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 7,224 | ||
+ | | style="text-align: right;" | 6,155 | ||
+ | |- | ||
+ | | 2016-05-26 | ||
+ | | style="text-align: right;" | 16 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 6,900 | ||
+ | | style="text-align: right;" | 6,011 | ||
+ | |- | ||
+ | | 2016-05-27 | ||
+ | | style="text-align: right;" | 17 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 7,278 | ||
+ | | style="text-align: right;" | 6,205 | ||
+ | |- | ||
+ | | 2016-05-28 | ||
+ | | style="text-align: right;" | 18 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 6,713 | ||
+ | | style="text-align: right;" | 6,475 | ||
+ | |- | ||
+ | | 2016-05-31 | ||
+ | | style="text-align: right;" | 19 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 7,421 | ||
+ | | style="text-align: right;" | 6,644 | ||
+ | |- | ||
+ | | 2016-05-31 | ||
+ | | style="text-align: right;" | 20 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 6,779 | ||
+ | | style="text-align: right;" | 6,199 | ||
+ | |- | ||
+ | | 2016-06-01 | ||
+ | | style="text-align: right;" | 21 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 6,306 | ||
+ | | style="text-align: right;" | 6,694 | ||
+ | |- | ||
+ | | 2016-06-02 | ||
+ | | style="text-align: right;" | 22 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 7,196 | ||
+ | | style="text-align: right;" | 6,844 | ||
+ | |- | ||
+ | | 2016-06-02 | ||
+ | | style="text-align: right;" | 23 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 6,550 | ||
+ | | style="text-align: right;" | 5,963 | ||
+ | |- | ||
+ | | 2016-06-03 | ||
+ | | style="text-align: right;" | 24 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 6,132 | ||
+ | | style="text-align: right;" | 6,312 | ||
+ | |- | ||
+ | | 2016-06-04 | ||
+ | | style="text-align: right;" | 25 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 7,213 | ||
+ | | style="text-align: right;" | 7,555 | ||
+ | |- | ||
+ | | 2016-06-06 | ||
+ | | style="text-align: right;" | 26 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 7,035 | ||
+ | | style="text-align: right;" | 6,039 | ||
+ | |- | ||
+ | | 2016-06-06 | ||
+ | | style="text-align: right;" | 27 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 12,267,752 | ||
+ | | style="text-align: right;" | 6,789 | ||
+ | | style="text-align: right;" | 8,039 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Completion Reports - Stimulations | ||
+ | | publisher = Pennsylvania Department of Conservation and Natural Resources | ||
+ | | date = 2020-03-02 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-03-02 }}</ref> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 423: | Line 802: | ||
| 2019 | | 2019 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 735,954.66 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 364 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 448: | Line 827: | ||
| 2015 | | 2015 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Drill Cuttings | + | | Drill Cuttings |
| style="text-align: right;" | 1,245.94 Tons | | style="text-align: right;" | 1,245.94 Tons | ||
| LANDFILL | | LANDFILL | ||
Line 455: | Line 834: | ||
| 2016 | | 2016 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Fracturing Fluid Waste | + | | Fracturing Fluid Waste |
| style="text-align: right;" | 6,140.00 Bbl | | style="text-align: right;" | 6,140.00 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
Line 462: | Line 841: | ||
| 2016 | | 2016 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Fracturing Fluid Waste | + | | Fracturing Fluid Waste |
+ | | style="text-align: right;" | 47.55 Tons | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | 101674 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Fracturing Fluid Waste | ||
| style="text-align: right;" | 71.70 Bbl | | style="text-align: right;" | 71.70 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123NW009 | | WMGR123NW009 | ||
|- | |- | ||
− | | | + | | 2017 |
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 5,897.56 Bbl |
− | | | + | | INJECTION DISPOSAL WELL |
− | | | + | | 34-133-21076 |
|- | |- | ||
| 2017 | | 2017 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 395.40 Bbl | | style="text-align: right;" | 395.40 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
Line 483: | Line 869: | ||
| 2017 | | 2017 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 11,551.34 Bbl | | style="text-align: right;" | 11,551.34 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 490: | Line 876: | ||
| 2017 | | 2017 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 4,350.74 Bbl | | style="text-align: right;" | 4,350.74 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 497: | Line 883: | ||
| 2017 | | 2017 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 14,265.58 Bbl | | style="text-align: right;" | 14,265.58 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123NW009 | | WMGR123NW009 | ||
|- | |- | ||
− | | | + | | 2018 |
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 368.22 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-133-24189 | ||
+ | |- | ||
+ | | 2018 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 237.00 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34-133- | + | | 34-133-24096 |
|- | |- | ||
| 2018 | | 2018 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 110.00 Bbl | | style="text-align: right;" | 110.00 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
Line 518: | Line 911: | ||
| 2018 | | 2018 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 7,764.83 Bbl | | style="text-align: right;" | 7,764.83 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
Line 525: | Line 918: | ||
| 2018 | | 2018 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 209.65 Bbl | | style="text-align: right;" | 209.65 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 546: | Line 925: | ||
| 2019 | | 2019 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2,970.76 Bbl |
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123NW009 | | WMGR123NW009 | ||
Line 553: | Line 932: | ||
| 2019 | | 2019 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2,470.00 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | | + | | 34-133-24096 |
+ | |- | ||
+ | | 2019 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 645.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-133-21076 | ||
|- | |- | ||
| 2019 | | 2019 | ||
| [[XTO ENERGY INC]] | | [[XTO ENERGY INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,425.00 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34-133- | + | | 34-133-24189 |
|- | |- | ||
|} | |} |
Well ID: 37-019-22445 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.822772,"lon":-79.752464,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Clearfield Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 152624 | |
Farm/Lease Name: GALAN A UNIT | |
License Status: Active | |
Spud Date: 2015-07-28 | |
Permit Date: 2015-06-23 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.822772 | |
Longitude: -79.752464 |
Date | Event |
---|---|
2015-06-23 | New Permit Application |
2015-07-27 | Performed Spud Operation |
2015-09-04 | Drilling Completion |
2016-04-21 | Perforation |
2016-05-11 | Perforation |
2016-05-11 | Performed Stage 1 of Stimulation |
2016-05-12 | Perforation |
2016-05-12 | Performed Stage 2 of Stimulation |
2016-05-13 | Perforation |
2016-05-13 | Performed Stage 3 of Stimulation |
2016-05-14 | Perforation |
2016-05-14 | Performed Stage 4 of Stimulation |
2016-05-16 | Perforation |
2016-05-16 | Performed Stage 5 of Stimulation |
2016-05-17 | Perforation |
2016-05-17 | Performed Stage 6 of Stimulation |
2016-05-18 | Perforation |
2016-05-18 | Performed Stage 7 of Stimulation |
2016-05-19 | Perforation |
2016-05-19 | Performed Stage 8 of Stimulation |
2016-05-20 | Perforation |
2016-05-20 | Performed Stage 10 of Stimulation |
2016-05-20 | Performed Stage 9 of Stimulation |
2016-05-21 | Perforation |
2016-05-21 | Performed Stage 11 of Stimulation |
2016-05-23 | Perforation |
2016-05-23 | Performed Stage 12 of Stimulation |
2016-05-24 | Performed Stage 13 of Stimulation |
2016-05-25 | Perforation |
2016-05-25 | Performed Stage 14 of Stimulation |
2016-05-26 | Perforation |
2016-05-26 | Performed Stage 15 of Stimulation |
2016-05-26 | Performed Stage 16 of Stimulation |
2016-05-27 | Perforation |
2016-05-27 | Performed Stage 17 of Stimulation |
2016-05-28 | Perforation |
2016-05-28 | Performed Stage 18 of Stimulation |
2016-05-31 | Perforation |
2016-05-31 | Performed Stage 19 of Stimulation |
2016-05-31 | Performed Stage 20 of Stimulation |
2016-06-01 | Perforation |
2016-06-01 | Performed Stage 21 of Stimulation |
2016-06-02 | Perforation |
2016-06-02 | Performed Stage 22 of Stimulation |
2016-06-02 | Performed Stage 23 of Stimulation |
2016-06-03 | Perforation |
2016-06-03 | Performed Stage 24 of Stimulation |
2016-06-04 | Perforation |
2016-06-04 | Performed Stage 25 of Stimulation |
2016-06-06 | Perforation |
2016-06-06 | Performed Stage 26 of Stimulation |
2016-06-06 | Performed Stage 27 of Stimulation |
2017-01-03 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-05-11 | 2016-06-06 | 6,153 | 14,693,800 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | XTO Energy/ExxonMobil | Carrier | Water | 7732-18-5 | 100 | 90.2528 | 0 |
Sand | C&J Well Services | Sand - Bulk - Pennsylvania | Titanium Oxide | 13463-67-7 | 0.1 | 0.004855 | 0 | |
Iron Oxide | 1309-37-1 | 0.1 | 0.002392 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 0.824693 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 4.85018 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.009081 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 2.3899 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.000826 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.000826 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.002392 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.053405 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.004855 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.026315 | 0 | ||||
Other Ingredients | C&J Well Services | Other Ingredients | Poly(oxy-1,2-ethanediyl), a-hydro-w-hydroxy-, mono-C10-14-alkyl esthers, phosphates |
68585-36-4 | 3 | 0.002732 | 0 | |
CJENERGY-Surfactant-00025 | Proprietary | 3 | 0.002732 | 0 | ||||
CJENERGY-Surfactant-00026 | Proprietary | 1 | 0.000911 | 0 | ||||
2-Propenamide as residual | 79-06-1 | 0.1 | 0.00009100 | 0 | ||||
Water | 7732-18-5 | 92.5 | 0.70315 | 0 | ||||
CJENERGY-Polymer-00024 | Proprietary | 35 | 0.031876 | 0 | ||||
Water | 7732-18-5 | 96 | 0.017428 | 0 | ||||
Water | 7732-18-5 | 31 | 0.028233 | 0 | ||||
Alcohols, C12-18, ethoxylated propoxylated | 69227-21-0 | 2 | 0.001821 | 0 | ||||
Water | 7732-18-5 | 85 | 0.03002 | 0 | ||||
CI-3 | C&J Well Services | Acid Corrosion Inhibitors | Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 15 | 0.112384 | 0 | |
2-Butoxyethanol | 111-76-2 | 15 | 0.112384 | 0 | ||||
1-OCTANOL | 111-87-5 | 2.5 | 0.018731 | 0 | ||||
Isopropyl Alcohol | 67-63-0 | 2.5 | 0.018731 | 0 | ||||
Triethyl Phosphate | 78-40-0 | 2.5 | 0.018731 | 0 | ||||
Nonyphenol (branched), ethoxylated | 127087-87-0 | 5 | 0.037461 | 0 | ||||
Ethylene Glycol | 107-21-1 | 40 | 0.299692 | 0 | ||||
Cinnamaldehyde | 104-55-2 | 15 | 0.112384 | 0 | ||||
1-DECANOL | 112-30-1 | 5 | 0.037461 | 0 | ||||
Dimethylformamide | 68-12-2 | 20 | 0.149846 | 0 | ||||
BIO-CLEAR 2000 | C&J Well Services | Biocides | 2,2-Dibromo-3-nitrilo-propionamide (DBNPA) | 10222-01-2 | 30 | 0.006122 | 0 | |
FR-16 PA-Only | C&J Well Services | PA-Proprietary | Ethylene Glycol | 107-21-1 | 5 | 0.004554 | 0 | |
Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 45 | 0.040983 | 0 | ||||
HC-7.5 | C&J Well Services | Bulk Acid | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.057012 | 0 | |
SI-6 PA-Only | C&J Well Services | PA-Proprietary | Methanol | 67-56-1 | 1 | 0.000182 | 0 | |
Monoethanolamine hydrochloride | 2002-24-6 | 2 | 0.000363 | 0 | ||||
CJENERGY-Phosphate-00040 | Proprietary | 6 | 0.001089 | 0 | ||||
Ammonium Chloride | 12125-02-9 | 2 | 0.000363 | 0 | ||||
HC-15 | C&J Well Services | Bulk Acid | Hydrochloric Acid | 7647-01-0 | 15 | 0.005298 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-05-11 | 1 | SAND | 12,267,752 | 7,349 | 4,576 |
2016-05-12 | 2 | SAND | 12,267,752 | 7,639 | 6,325 |
2016-05-13 | 3 | SAND | 12,267,752 | 7,551 | 6,115 |
2016-05-14 | 4 | SAND | 12,267,752 | 7,481 | 5,475 |
2016-05-16 | 5 | SAND | 12,267,752 | 7,682 | 5,502 |
2016-05-17 | 6 | SAND | 12,267,752 | 7,304 | 6,226 |
2016-05-18 | 7 | SAND | 12,267,752 | 7,885 | 6,101 |
2016-05-19 | 8 | SAND | 12,267,752 | 7,169 | 6,099 |
2016-05-20 | 9 | SAND | 12,267,752 | 6,933 | 5,288 |
2016-05-20 | 10 | SAND | 12,267,752 | 7,358 | 6,779 |
2016-05-21 | 11 | SAND | 12,267,752 | 7,046 | 6,929 |
2016-05-23 | 12 | SAND | 12,267,752 | 7,438 | 6,222 |
2016-05-24 | 13 | SAND | 12,267,752 | 6,872 | 6,337 |
2016-05-25 | 14 | SAND | 12,267,752 | 6,812 | 5,642 |
2016-05-26 | 15 | SAND | 12,267,752 | 7,224 | 6,155 |
2016-05-26 | 16 | SAND | 12,267,752 | 6,900 | 6,011 |
2016-05-27 | 17 | SAND | 12,267,752 | 7,278 | 6,205 |
2016-05-28 | 18 | SAND | 12,267,752 | 6,713 | 6,475 |
2016-05-31 | 19 | SAND | 12,267,752 | 7,421 | 6,644 |
2016-05-31 | 20 | SAND | 12,267,752 | 6,779 | 6,199 |
2016-06-01 | 21 | SAND | 12,267,752 | 6,306 | 6,694 |
2016-06-02 | 22 | SAND | 12,267,752 | 7,196 | 6,844 |
2016-06-02 | 23 | SAND | 12,267,752 | 6,550 | 5,963 |
2016-06-03 | 24 | SAND | 12,267,752 | 6,132 | 6,312 |
2016-06-04 | 25 | SAND | 12,267,752 | 7,213 | 7,555 |
2016-06-06 | 26 | SAND | 12,267,752 | 7,035 | 6,039 |
2016-06-06 | 27 | SAND | 12,267,752 | 6,789 | 8,039 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 1,036,998.00 | 354 | 0.00 | 0 | 71.66 | 231 |
2018 | XTO ENERGY INC | 774,031.31 | 345 | 1.25 | 29 | 6.24 | 149 |
2019 | XTO ENERGY INC | 735,954.66 | 364 | 0.00 | 0 | 0.83 | 28 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | XTO ENERGY INC | Drill Cuttings | 1,245.94 Tons | LANDFILL | 100585 |
2016 | XTO ENERGY INC | Fracturing Fluid Waste | 6,140.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | XTO ENERGY INC | Fracturing Fluid Waste | 47.55 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2016 | XTO ENERGY INC | Fracturing Fluid Waste | 71.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 5,897.56 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 395.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 11,551.34 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 4,350.74 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 14,265.58 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 368.22 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 237.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Produced Fluid | 7,764.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 209.65 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 2,970.76 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 2,470.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 645.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 1,425.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2393266 | Primary Facility | 2015-07-27 | Drilling/Alteration | No Violations Noted | |
2393918 | Primary Facility | 2015-07-28 | Routine/Partial Inspection | No Violations Noted | |
2397122 | Primary Facility | 2015-08-06 | Drilling/Alteration | No Violations Noted | |
2405017 | Primary Facility | 2015-09-02 | Drilling/Alteration | No Violations Noted | |
2405022 | Primary Facility | 2015-09-03 | Drilling/Alteration | No Violations Noted | |
2486237 | Primary Facility | 2016-05-18 | Complaint Inspection | No Violations Noted | |
2535907 | Primary Facility | 2016-11-14 | Administrative/File Review | No Violations Noted | |
2544148 | Primary Facility | 2016-12-02 | Routine/Partial Inspection | No Violations Noted | |
2583107 | Primary Facility | 2017-04-05 | Routine/Partial Inspection | No Violations Noted | |
2681464 | Primary Facility | 2018-01-10 | Routine/Complete Inspection | No Violations Noted | On 1/10/2018, WQS Brian MacQuarrie onsite. Site sign posted and maintained at entrance. Three wells properly tagged and in production. Four 400 bbl production tanks in containment. Snow on ground. No apparent issues. |
2698866 | Primary Facility | 2018-02-27 | Routine/Partial Inspection | No Violations Noted | On site for a routine partial inspection.
All wells on site are in production. Well tags in place. Wellheads fenced and protected with a jersey barrier. Production equipment, tank battery & GPUs, on containment. Combustor on site. Production equipment fenced. Sound wall installed on pad. Gathering pipeline connected to wells, with a pipeline launcher/receiver on pad. All temporary E/S controls removed. PCSM plan implemented & PCSM BMPs installed. Site is 100% vegetated. |
2835575 | Primary Facility | 2019-02-04 | Routine/Partial Inspection | No Violations Noted | On 2/4/2019, WQS Brian MacQuarrie onsite. Site sign posted at entrance to site. Access road maintained. Three wells in production, 2H(019-22445), 6H(019-22446) and 10H(019-22454). Tank battery consists of four 400 bbl tanks installed within containment. Post construction BMPs maintained. |
For data sources see[9]