== Well Details == | == Well Details == | ||
− | {| class="wikitable" width="95%" | + | {| class="wikitable welldetails" width="95%" |
− | | Well ID: 021-21176 | + | | Well ID: 37-021-21176 |
− | | style=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.281483, -78.690058 | width=100% | height=100% }} |
+ | |- | ||
+ | | Country: United States | ||
+ | |- | ||
+ | | State: Pennsylvania | ||
|- | |- | ||
− | | County: [[ | + | | County: [[Cambria_County,_Pennsylvania|Cambria]] |
|- | |- | ||
− | | Municipality: [[Adams Township, | + | | Municipality: [[Adams Township,_Cambria_County,_Pennsylvania|Adams Township]] |
|- | |- | ||
| Operator Name: [[CHEVRON APPALACHIA LLC]] | | Operator Name: [[CHEVRON APPALACHIA LLC]] | ||
+ | |- | ||
+ | | Well Pad ID: [[149074]] | ||
|- | |- | ||
| Farm/Lease Name: PMG RABY UNIT 2H | | Farm/Lease Name: PMG RABY UNIT 2H | ||
|- | |- | ||
− | | | + | | License Status: |
|- | |- | ||
− | | | + | | Spud Date: |
|- | |- | ||
− | | | + | | Permit Date: 2011-03-29 |
|- | |- | ||
− | | | + | | Well Type: GAS |
|- | |- | ||
− | | | + | | Unconventional Well: Y |
|- | |- | ||
− | | | + | | Configuration: Horizontal Well |
|- | |- | ||
− | | | + | | Conservation: No |
|- | |- | ||
| Latitude: 40.281483 | | Latitude: 40.281483 | ||
|- | |- | ||
| Longitude: -78.690058 | | Longitude: -78.690058 | ||
− | |||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | == Well | + | | title = Permits Issued Detail Report |
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Date |
− | !scope="col" | | + | !scope="col" | Event |
− | + | |- | |
− | + | | 2011-03-29 | |
− | + | | New Permit Application | |
+ | |- | ||
+ | | 2011-05-27 | ||
+ | | Performed Spud Operation | ||
|- | |- | ||
− | + | | 2011-07-07 | |
− | | 2011- | + | | Drilling Completion |
− | |||
− | |||
− | | | ||
|- | |- | ||
+ | | 2013-01-10 | ||
+ | | DEVIATED | ||
|- | |- | ||
− | | | + | |} |
− | | | + | For data sources see<ref>{{cite web |
− | | | + | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources |
− | | | + | | date = 2020-02-27 |
− | | | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources |
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
|- | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
|- | |- | ||
− | | | + | |}--> |
− | |||
− | |||
− | |||
− | + | <!--== Stimulation Data == | |
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
− | | | + | == Production Data == |
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator Name | ||
+ | !scope="col" | Gas Quantity (mcf) | ||
+ | !scope="col" | Gas Production Days | ||
+ | !scope="col" | Oil Quantity (bbl) | ||
+ | !scope="col" | Oil Production Days | ||
+ | !scope="col" | Water Quantity (bbl) | ||
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
+ | !scope="col" | Waste Type | ||
+ | !scope="col" | Quantity | ||
+ | !scope="col" | Disposal Method | ||
+ | !scope="col" | Waste Facility ID | ||
|- | |- | ||
+ | | 2011 | ||
+ | | [[CHIEF OIL & GAS LLC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 80.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | EPA ID: 748-163 | ||
|- | |- | ||
− | | | + | | 2011 |
− | | | + | | [[CHIEF OIL & GAS LLC]] |
− | | | + | | Drill Cuttings |
− | | | + | | style="text-align: right;" | 1,006.43 Tons |
− | | | + | | LANDFILL |
+ | | 100081 | ||
|- | |- | ||
+ | | 2011 | ||
+ | | [[CHIEF OIL & GAS LLC]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 2,890.00 Bbl | ||
+ | | LANDFILL | ||
+ | | NY STATE #32S11 | ||
|- | |- | ||
− | | | + | | 2015 |
− | | | + | | [[CHEVRON APPALACHIA LLC]] |
− | | | + | | Drilling Fluid Waste |
− | | | + | | style="text-align: right;" | 195.66 Bbl |
− | | | + | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) |
+ | | WMGR123SW001 | ||
|- | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Waste Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Inspection Category | ||
+ | !scope="col" | Inspection Date | ||
+ | !scope="col" | Inspection Type | ||
+ | !scope="col" | Inspection Result | ||
+ | !scope="col" | Inspection Comments | ||
|- | |- | ||
| 1978954 | | 1978954 | ||
+ | | Primary Facility | ||
| 2011-06-01 | | 2011-06-01 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| spud 5/27/11. sign present, ¿PMG RABY UNIT LEASE.¿ Unable to clearly located 2H permit number on sign or ES plan. Recommend that operator ¿clearly¿ identify well site with multiple permit numbers for each horizontal well being drilled as well as update ES plan to include each well. Temporary containment pad being installed. Rig onsite Appears temporary BMPs are installed&functioning according to plan. Observed sediment trap appeared full, recommend operator continue to monitor & maintain as necessary. No accelerated erosion or sedimentation issues noted, but did observed some (red) discoloration of soil* located behind job trailers and along soil pile; no active discharge or release of fluids observed during this inspection. Due to recent heavy rains and mulch onsite, a follow inspection will be conducted next week to further investigate/monitor/sample area of discoloration if observations illustrate a necessity to do so. No violations noted during this inspection. | | spud 5/27/11. sign present, ¿PMG RABY UNIT LEASE.¿ Unable to clearly located 2H permit number on sign or ES plan. Recommend that operator ¿clearly¿ identify well site with multiple permit numbers for each horizontal well being drilled as well as update ES plan to include each well. Temporary containment pad being installed. Rig onsite Appears temporary BMPs are installed&functioning according to plan. Observed sediment trap appeared full, recommend operator continue to monitor & maintain as necessary. No accelerated erosion or sedimentation issues noted, but did observed some (red) discoloration of soil* located behind job trailers and along soil pile; no active discharge or release of fluids observed during this inspection. Due to recent heavy rains and mulch onsite, a follow inspection will be conducted next week to further investigate/monitor/sample area of discoloration if observations illustrate a necessity to do so. No violations noted during this inspection. | ||
− | |||
− | |||
− | |||
|- | |- | ||
| 1979806 | | 1979806 | ||
+ | | Primary Facility | ||
| 2011-06-08 | | 2011-06-08 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 1985941 | | 1985941 | ||
+ | | Primary Facility | ||
| 2011-06-29 | | 2011-06-29 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection, no E&S or IW discharge issues at the site. Conductor pipe (20¿) set at 60 ft with 9 yds3 cement (Gas Block) grouted. Second Stringer (13 3/8¿) pipe ran to 590 ft with 415 sks gas block with 9 bbl returns. Third stringer (9 5/8) set at 1805 ft with 561 sks of gas block with 25 bbl return. Current depth was at 12,374 ft. Kick of was 8859 ft. Mud weight was at 12.5. Chief was planning to set pipe and cement on 7/2/11. | | At the time of inspection, no E&S or IW discharge issues at the site. Conductor pipe (20¿) set at 60 ft with 9 yds3 cement (Gas Block) grouted. Second Stringer (13 3/8¿) pipe ran to 590 ft with 415 sks gas block with 9 bbl returns. Third stringer (9 5/8) set at 1805 ft with 561 sks of gas block with 25 bbl return. Current depth was at 12,374 ft. Kick of was 8859 ft. Mud weight was at 12.5. Chief was planning to set pipe and cement on 7/2/11. | ||
− | |||
− | |||
|- | |- | ||
| 1985993 | | 1985993 | ||
+ | | Primary Facility | ||
| 2011-06-28 | | 2011-06-28 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection, no E&S or IW discharge issues at the site. Conductor pipe (20¿) set at 60 ft with 9 yds3 cement (Gas Block) grouted. Second Stringer (13 3/8¿) pipe ran to 590 ft with 415 sks gas block with 9 bbl returns. Third stringer (9 5/8) set at 1805 ft with 561 sks of gas block with 25 bbl return. Current depth was at 11,292 ft. UDI process of pulling drilling rods. | | At the time of inspection, no E&S or IW discharge issues at the site. Conductor pipe (20¿) set at 60 ft with 9 yds3 cement (Gas Block) grouted. Second Stringer (13 3/8¿) pipe ran to 590 ft with 415 sks gas block with 9 bbl returns. Third stringer (9 5/8) set at 1805 ft with 561 sks of gas block with 25 bbl return. Current depth was at 11,292 ft. UDI process of pulling drilling rods. | ||
− | |||
− | |||
|- | |- | ||
| 1986004 | | 1986004 | ||
+ | | Primary Facility | ||
| 2011-06-21 | | 2011-06-21 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection, no E&S or IW discharge issues at the site. Conductor pipe (20¿) set at 60 ft with 9 yds3 cement (Gas Block) grouted. Second Stringer (13 3/8¿) pipe ran to 590 ft with 415 sks gas block with 9 bbl returns. Current depth was at 4826 ft. Chief set 9 5/8 at 1805 ft with 561 sks of gas block with 25 bbl return. Proposed KOP was at 8859 ft.. Meeting held with Highland water sewer and Chief representatives. | | At the time of inspection, no E&S or IW discharge issues at the site. Conductor pipe (20¿) set at 60 ft with 9 yds3 cement (Gas Block) grouted. Second Stringer (13 3/8¿) pipe ran to 590 ft with 415 sks gas block with 9 bbl returns. Current depth was at 4826 ft. Chief set 9 5/8 at 1805 ft with 561 sks of gas block with 25 bbl return. Proposed KOP was at 8859 ft.. Meeting held with Highland water sewer and Chief representatives. | ||
− | |||
− | |||
|- | |- | ||
| 1986039 | | 1986039 | ||
+ | | Primary Facility | ||
| 2011-06-09 | | 2011-06-09 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection, no E&S or IW discharge issues at the site. Conductor pipe (20¿) set at 60 ft with 9 yds3 cement (Gas Block) grouted. Second Stringer (13 3/8¿) pipe ran to 590 ft with 415 sks gas block with 9 bbl returns. Current depth was at 988 ft. Chief proposed to set 9 5/8 at 1800 ft. Chief ran cement bond logs on each cement job. | | At the time of inspection, no E&S or IW discharge issues at the site. Conductor pipe (20¿) set at 60 ft with 9 yds3 cement (Gas Block) grouted. Second Stringer (13 3/8¿) pipe ran to 590 ft with 415 sks gas block with 9 bbl returns. Current depth was at 988 ft. Chief proposed to set 9 5/8 at 1800 ft. Chief ran cement bond logs on each cement job. | ||
− | |||
− | |||
|- | |- | ||
| 1986051 | | 1986051 | ||
+ | | Primary Facility | ||
| 2011-06-01 | | 2011-06-01 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection, no E&S or IW discharge issues at the site. Site located at the wind farm located in Adams Twp, Gallitzin State Park. Security guard present. Inspected site. Site sign and E&S plan present. Chief setting up UDI 60 rig. Alternate plan approved by PADEP for 2H well. | | At the time of inspection, no E&S or IW discharge issues at the site. Site located at the wind farm located in Adams Twp, Gallitzin State Park. Security guard present. Inspected site. Site sign and E&S plan present. Chief setting up UDI 60 rig. Alternate plan approved by PADEP for 2H well. | ||
− | |||
|- | |- | ||
+ | | 2004426 | ||
+ | | Primary Facility | ||
+ | | 2011-09-13 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | During this inspection, Chevron Regulatory Compliance Personnel and WQS Marc Maestra present. Well ID sign, ES plan onsite. Well tag present. Site gated and locked. Well drilled not yet in production. Access road and entrance adequately rocked. Soil pile seeded/mulched. Slopes secured with erosion blankets exhibiting growth. BMPs installed according to plan.no accelerated erosion or sedimentation issues noted. Although red staining near soil pile and near toe slope of pad is observed-again this was attributed to decomposition of mulch/ tress used during pad construction. While on site all parties noted that soil near sediment trap appears discolored with a ¿red/black¿ hue and the liquid contents of sediment trap appear dark in nature as well- it is also observed that large quantity of leaves present in trap. Operator plans to investigate/sample discoloration of both the soil and liquid fraction from near sed trap. 10-20-11: Bases on site inspection and review of operator results it does not appear discoloration is due to spill or release. | ||
+ | |- | ||
+ | | 2016194 | ||
+ | | Primary Facility | ||
+ | | 2011-11-01 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection, no E&S or IW discharge issues at the site. Site sign and E&S plan present. Well marker not present. Spud called on 10/31/11. Called Chevron to request well marker placed prior to drilling activity. | ||
+ | |- | ||
+ | | 2020137 | ||
+ | | Primary Facility | ||
+ | | 2011-11-17 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection, well ID sign and Es plan present. Share access road stable. Rig onsite actively drilling top hole on 3h, 2h and 1H previously drilled yet not in production. Secondary containment installed beneath rig as well as tanks. Tanks located onsite appear structurally sound. Bmp's installed and functioning according to ES plan. Presviously disturbed areas appear to be seeded and muclhed with observed growth. Operator shall continue to monitor and maintain all bmp's until final/permanent restoration is achieved. | ||
+ | |- | ||
+ | | 2020357 | ||
+ | | Primary Facility | ||
+ | | 2011-11-17 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection, no E&S or IW discharge issues at the site. Site sign and E&S plan present. Well head located in secure fence. | ||
+ | |- | ||
+ | | 2020380 | ||
+ | | Primary Facility | ||
+ | | 2011-11-15 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection, no E&S or IW discharge issues at the site. Site sign and E&S plan present. Well head located in secure fence. | ||
|- | |- | ||
| 2049816 | | 2049816 | ||
+ | | Primary Facility | ||
| 2012-03-01 | | 2012-03-01 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production. | | At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production. | ||
− | |||
− | |||
|- | |- | ||
| 2058699 | | 2058699 | ||
+ | | Primary Facility | ||
| 2012-04-03 | | 2012-04-03 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production. | | At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production. | ||
− | |||
− | |||
|- | |- | ||
| 2067286 | | 2067286 | ||
+ | | Primary Facility | ||
| 2012-05-01 | | 2012-05-01 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production. | | At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production. | ||
− | |||
− | |||
|- | |- | ||
| 2093081 | | 2093081 | ||
+ | | Primary Facility | ||
| 2012-06-12 | | 2012-06-12 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production. | | At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production. | ||
− | |||
|- | |- | ||
− | | | + | | 2148495 |
− | + | | Primary Facility | |
− | + | | 2013-03-07 | |
− | + | | Routine/Complete Inspection | |
− | + | | No Violations Noted | |
− | + | | On-site meeting with Chevron rep Curtis Small. | |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 2385510 |
− | | | + | | Primary Facility |
− | | | + | | 2015-06-30 |
− | | | + | | Routine/Complete Inspection |
− | + | | No Violations Noted | |
− | + | | At the time of inspection, site sign present. Well head located in secure fence. As per the reviewed plan, Chevron reviewed previous cement and casing for well 1H. All cement for casing was cemented to surface. A mechanical plug was set at 8600 feet. The BOP was tested at 250 psi for 5 minutes. The remaining casing from 8600 feet was cemented to 1500 feet where it will be brought to surface on additional cement | |
− | |||
|- | |- | ||
+ | | 2401231 | ||
+ | | Primary Facility | ||
+ | | 2015-07-08 | ||
+ | | Plugging(Includes Plugged/Mined Through) | ||
+ | | No Violations Noted | ||
+ | | Chevron contracted Nabors to plug well. Packer set at 1380 feet. Well was flushed to 1700 feet. A total of 100 sack of Class A was used to cement well to surface | ||
|- | |- | ||
− | | | + | | 2407456 |
− | | | + | | Primary Facility |
− | | | + | | 2015-09-04 |
− | + | | Routine/Complete Inspection | |
− | | | + | | No Violations Noted |
− | | | + | | Inspection conducted with Operator representative Matt Barch. At time of inspection, wells 2H, 1H, and 3H all appear plugged. Aboveground monuments installed on each well with permit numbers affixed. According to records, drilling occurred 5/28/2011-7/7/2011, inactive status approved 3/8/2012, and per electronic notification submitted by Operator, plugging was scheduled to commence on 6/29/2015. |
− | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} | ||
− | == | + | <!--==== Violations Commited ==== |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Violation ID |
− | + | !scope="col" | Violation Date | |
− | + | !scope="col" | Date Resolved | |
− | !scope="col" | | + | !scope="col" | Violation Code |
− | !scope="col" | | + | !scope="col" | Violation Type |
− | !scope="col" | | + | !scope="col" | Violation Comments |
− | !scope="col" | | ||
− | !scope="col" | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
+ | |}--> | ||
+ | <!--==== Penalties Applied ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Penalty ID | ||
+ | !scope="col" | Penalty Code | ||
+ | !scope="col" | Penalty Status | ||
+ | !scope="col" | Penalty Date | ||
+ | !scope="col" | Enforcement Date | ||
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
|- | |- | ||
− | | | + | |}--> |
− | + | For data sources see<ref>{{cite web | |
− | | | + | | title =Oil and Gas Compliance Report |
− | | | + | |publisher = [[Pennsylvania Department of Environmental Protection]] |
− | | | + | | date = 2019-05-20 |
− | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | |
− | + | | accessdate = 2019-05-21 }}</ref> | |
− | + | ==References== | |
− | + | <references/> | |
− | |||
− | | | ||
− | |||
− | |||
− | |||
− | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Pennsylvania Wells]] |
Well ID: 37-021-21176 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.281483,"lon":-78.690058,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Cambria | |
Municipality: Adams Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 149074 | |
Farm/Lease Name: PMG RABY UNIT 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-03-29 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.281483 | |
Longitude: -78.690058 |
Date | Event |
---|---|
2011-03-29 | New Permit Application |
2011-05-27 | Performed Spud Operation |
2011-07-07 | Drilling Completion |
2013-01-10 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 |
2011 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,006.43 Tons | LANDFILL | 100081 |
2011 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 2,890.00 Bbl | LANDFILL | NY STATE #32S11 |
2015 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 195.66 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1978954 | Primary Facility | 2011-06-01 | Routine/Complete Inspection | No Violations Noted | spud 5/27/11. sign present, ¿PMG RABY UNIT LEASE.¿ Unable to clearly located 2H permit number on sign or ES plan. Recommend that operator ¿clearly¿ identify well site with multiple permit numbers for each horizontal well being drilled as well as update ES plan to include each well. Temporary containment pad being installed. Rig onsite Appears temporary BMPs are installed&functioning according to plan. Observed sediment trap appeared full, recommend operator continue to monitor & maintain as necessary. No accelerated erosion or sedimentation issues noted, but did observed some (red) discoloration of soil* located behind job trailers and along soil pile; no active discharge or release of fluids observed during this inspection. Due to recent heavy rains and mulch onsite, a follow inspection will be conducted next week to further investigate/monitor/sample area of discoloration if observations illustrate a necessity to do so. No violations noted during this inspection. |
1979806 | Primary Facility | 2011-06-08 | Routine/Complete Inspection | No Violations Noted | |
1985941 | Primary Facility | 2011-06-29 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. Conductor pipe (20¿) set at 60 ft with 9 yds3 cement (Gas Block) grouted. Second Stringer (13 3/8¿) pipe ran to 590 ft with 415 sks gas block with 9 bbl returns. Third stringer (9 5/8) set at 1805 ft with 561 sks of gas block with 25 bbl return. Current depth was at 12,374 ft. Kick of was 8859 ft. Mud weight was at 12.5. Chief was planning to set pipe and cement on 7/2/11. |
1985993 | Primary Facility | 2011-06-28 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. Conductor pipe (20¿) set at 60 ft with 9 yds3 cement (Gas Block) grouted. Second Stringer (13 3/8¿) pipe ran to 590 ft with 415 sks gas block with 9 bbl returns. Third stringer (9 5/8) set at 1805 ft with 561 sks of gas block with 25 bbl return. Current depth was at 11,292 ft. UDI process of pulling drilling rods. |
1986004 | Primary Facility | 2011-06-21 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. Conductor pipe (20¿) set at 60 ft with 9 yds3 cement (Gas Block) grouted. Second Stringer (13 3/8¿) pipe ran to 590 ft with 415 sks gas block with 9 bbl returns. Current depth was at 4826 ft. Chief set 9 5/8 at 1805 ft with 561 sks of gas block with 25 bbl return. Proposed KOP was at 8859 ft.. Meeting held with Highland water sewer and Chief representatives. |
1986039 | Primary Facility | 2011-06-09 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. Conductor pipe (20¿) set at 60 ft with 9 yds3 cement (Gas Block) grouted. Second Stringer (13 3/8¿) pipe ran to 590 ft with 415 sks gas block with 9 bbl returns. Current depth was at 988 ft. Chief proposed to set 9 5/8 at 1800 ft. Chief ran cement bond logs on each cement job. |
1986051 | Primary Facility | 2011-06-01 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. Site located at the wind farm located in Adams Twp, Gallitzin State Park. Security guard present. Inspected site. Site sign and E&S plan present. Chief setting up UDI 60 rig. Alternate plan approved by PADEP for 2H well. |
2004426 | Primary Facility | 2011-09-13 | Routine/Complete Inspection | No Violations Noted | During this inspection, Chevron Regulatory Compliance Personnel and WQS Marc Maestra present. Well ID sign, ES plan onsite. Well tag present. Site gated and locked. Well drilled not yet in production. Access road and entrance adequately rocked. Soil pile seeded/mulched. Slopes secured with erosion blankets exhibiting growth. BMPs installed according to plan.no accelerated erosion or sedimentation issues noted. Although red staining near soil pile and near toe slope of pad is observed-again this was attributed to decomposition of mulch/ tress used during pad construction. While on site all parties noted that soil near sediment trap appears discolored with a ¿red/black¿ hue and the liquid contents of sediment trap appear dark in nature as well- it is also observed that large quantity of leaves present in trap. Operator plans to investigate/sample discoloration of both the soil and liquid fraction from near sed trap. 10-20-11: Bases on site inspection and review of operator results it does not appear discoloration is due to spill or release. |
2016194 | Primary Facility | 2011-11-01 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. Site sign and E&S plan present. Well marker not present. Spud called on 10/31/11. Called Chevron to request well marker placed prior to drilling activity. |
2020137 | Primary Facility | 2011-11-17 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, well ID sign and Es plan present. Share access road stable. Rig onsite actively drilling top hole on 3h, 2h and 1H previously drilled yet not in production. Secondary containment installed beneath rig as well as tanks. Tanks located onsite appear structurally sound. Bmp's installed and functioning according to ES plan. Presviously disturbed areas appear to be seeded and muclhed with observed growth. Operator shall continue to monitor and maintain all bmp's until final/permanent restoration is achieved. |
2020357 | Primary Facility | 2011-11-17 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. Site sign and E&S plan present. Well head located in secure fence. |
2020380 | Primary Facility | 2011-11-15 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. Site sign and E&S plan present. Well head located in secure fence. |
2049816 | Primary Facility | 2012-03-01 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production. |
2058699 | Primary Facility | 2012-04-03 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production. |
2067286 | Primary Facility | 2012-05-01 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production. |
2093081 | Primary Facility | 2012-06-12 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production. |
2148495 | Primary Facility | 2013-03-07 | Routine/Complete Inspection | No Violations Noted | On-site meeting with Chevron rep Curtis Small. |
2385510 | Primary Facility | 2015-06-30 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, site sign present. Well head located in secure fence. As per the reviewed plan, Chevron reviewed previous cement and casing for well 1H. All cement for casing was cemented to surface. A mechanical plug was set at 8600 feet. The BOP was tested at 250 psi for 5 minutes. The remaining casing from 8600 feet was cemented to 1500 feet where it will be brought to surface on additional cement |
2401231 | Primary Facility | 2015-07-08 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Chevron contracted Nabors to plug well. Packer set at 1380 feet. Well was flushed to 1700 feet. A total of 100 sack of Class A was used to cement well to surface |
2407456 | Primary Facility | 2015-09-04 | Routine/Complete Inspection | No Violations Noted | Inspection conducted with Operator representative Matt Barch. At time of inspection, wells 2H, 1H, and 3H all appear plugged. Aboveground monuments installed on each well with permit numbers affixed. According to records, drilling occurred 5/28/2011-7/7/2011, inactive status approved 3/8/2012, and per electronic notification submitted by Operator, plugging was scheduled to commence on 6/29/2015. |
For data sources see[7]