X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-031-24902"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-031-24902
 
| Well ID: 37-031-24902
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.309211, -79.599030 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.309211, -79.599030 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: MASTERS 14
 
| Farm/Lease Name: MASTERS 14
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 01/29/2009
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 4/16/2008
+
| Permit Date: 2008-04-16
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.309211
 
| Latitude: 41.309211
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2008-04-16
 +
| New Permit Application
 +
|-
 +
| 2009-01-29
 +
| Performed Spud Operation
 +
|-
 +
| 2009-02-03
 +
| Drilling Completion
 +
|-
 +
| 2015-12-02
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 124:
 
|-
 
|-
 
| 2008
 
| 2008
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 62.09
 
| style="text-align: right;" | 62.09
 
| style="text-align: right;" | 214
 
| style="text-align: right;" | 214
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 12.71
 
| style="text-align: right;" | 12.71
 
| style="text-align: right;" | 62
 
| style="text-align: right;" | 62
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 10.95
 
| style="text-align: right;" | 10.95
 
| style="text-align: right;" | 61
 
| style="text-align: right;" | 61
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 14.00
 
| style="text-align: right;" | 14.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 5.00
 
| style="text-align: right;" | 5.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 12.50
 
| style="text-align: right;" | 12.50
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 169: Line 232:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 174: Line 238:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2014-0
+
| 2014
| Produced Fluid (in Barrels)
+
| [[DANNIC ENERGY CORP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 270.00 Bbl
 
| style="text-align: right;" | 270.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0028428
 
| PA0028428
 
|-
 
|-
| 2016-0
+
| 2015
| Produced Fluid (in Barrels) RWC 802
+
| [[DANNIC ENERGY CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 6,720.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0028428
 +
|-
 +
| 2016
 +
| [[DANNIC ENERGY CORP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 160.00 Bbl
 
| style="text-align: right;" | 160.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0028428
 
| PA0028428
 
|-
 
|-
| 2017-0
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[DANNIC ENERGY CORP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0028428
 
| PA0028428
 
|-
 
|-
| 2018-0
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[DANNIC ENERGY CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 160.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0028428
 +
|-
 +
| 2019
 +
| [[DANNIC ENERGY CORP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 160.00 Bbl
 
| style="text-align: right;" | 160.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
Line 217: Line 299:
 
| 1758870
 
| 1758870
 
| Primary Facility
 
| Primary Facility
| 12/11/2008
+
| 2008-12-11
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 224: Line 306:
 
| 1771577
 
| 1771577
 
| Primary Facility
 
| Primary Facility
| 02/24/2009
+
| 2009-02-24
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 231: Line 313:
 
| 1772379
 
| 1772379
 
| Primary Facility
 
| Primary Facility
| 02/25/2009
+
| 2009-02-25
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 238: Line 320:
 
| 1795349
 
| 1795349
 
| Primary Facility
 
| Primary Facility
| 04/29/2009
+
| 2009-04-29
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 245: Line 327:
 
| 1818670
 
| 1818670
 
| Primary Facility
 
| Primary Facility
| 07/29/2009
+
| 2009-07-29
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 252: Line 334:
 
| 1821587
 
| 1821587
 
| Primary Facility
 
| Primary Facility
| 08/19/2009
+
| 2009-08-19
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 259: Line 341:
 
| 1824912
 
| 1824912
 
| Primary Facility
 
| Primary Facility
| 08/26/2009
+
| 2009-08-26
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 266: Line 348:
 
| 1841053
 
| 1841053
 
| Primary Facility
 
| Primary Facility
| 11/04/2009
+
| 2009-11-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 273: Line 355:
 
| 1848243
 
| 1848243
 
| Primary Facility
 
| Primary Facility
| 12/07/2009
+
| 2009-12-07
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 280: Line 362:
 
| 1853456
 
| 1853456
 
| Primary Facility
 
| Primary Facility
| 12/23/2009
+
| 2009-12-23
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 287: Line 369:
 
| 1904464
 
| 1904464
 
| Primary Facility
 
| Primary Facility
| 08/04/2010
+
| 2010-08-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 294: Line 376:
 
| 1927198
 
| 1927198
 
| Primary Facility
 
| Primary Facility
| 11/12/2010
+
| 2010-11-12
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 301: Line 383:
 
| 2100234
 
| 2100234
 
| Primary Facility
 
| Primary Facility
| 09/10/2012
+
| 2012-09-10
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 308: Line 390:
 
| 2159416
 
| 2159416
 
| Primary Facility
 
| Primary Facility
| 04/16/2013
+
| 2013-04-16
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 315: Line 397:
 
| 2423279
 
| 2423279
 
| Primary Facility
 
| Primary Facility
| 11/09/2015
+
| 2015-11-09
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 341: Line 423:
 
| 553423
 
| 553423
 
| 12/11/2008
 
| 12/11/2008
| 04/29/2009
+
| 2008-12-11
 
| 102.4NOPLAN - No E&S plan developed, plan not on site
 
| 102.4NOPLAN - No E&S plan developed, plan not on site
 
| Administrative
 
| Administrative
Line 349: Line 431:
 
| 557046
 
| 557046
 
| 02/24/2009
 
| 02/24/2009
| 04/29/2009
+
| 2009-02-24
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
| Administrative
 
| Administrative
Line 357: Line 439:
 
| 562009
 
| 562009
 
| 04/29/2009
 
| 04/29/2009
| 08/26/2009
+
| 2009-04-29
 
| 102.4INADPLN - E&S Plan not adequate
 
| 102.4INADPLN - E&S Plan not adequate
 
| Administrative
 
| Administrative
Line 365: Line 447:
 
| 575015
 
| 575015
 
| 11/04/2009
 
| 11/04/2009
| 12/23/2009
+
| 2009-11-04
 
| 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging
 
| 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 373: Line 455:
 
| 592798
 
| 592798
 
| 08/04/2010
 
| 08/04/2010
| 02/28/2012
+
| 2010-08-04
 
| 210UNPLUG - Failure to plug a well upon abandonment
 
| 210UNPLUG - Failure to plug a well upon abandonment
 
| Administrative
 
| Administrative
Line 381: Line 463:
 
| 592799
 
| 592799
 
| 08/04/2010
 
| 08/04/2010
| 11/12/2010
+
| 2010-08-04
 
| 78.62 - Improper encapsulation of waste
 
| 78.62 - Improper encapsulation of waste
 
| Administrative
 
| Administrative
Line 403: Line 485:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 05/08/2009
+
| 2009-05-08
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 412: Line 494:
 
| Administrative Close Out
 
| Administrative Close Out
 
|  
 
|  
| 04/17/2015
+
| 2015-04-17
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 421: Line 503:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 08/26/2009
+
| 2009-08-26
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 430: Line 512:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 09/10/2009
+
| 2009-09-10
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 439: Line 521:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 12/23/2009
+
| 2009-12-23
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 448: Line 530:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 12/23/2009
+
| 2009-12-23
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 457: Line 539:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 04/16/2013
+
| 2013-04-16
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 466: Line 548:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 04/16/2013
+
| 2013-04-16
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 475: Line 557:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 04/16/2013
+
| 2013-04-16
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 486: Line 568:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 17:37, 22 May 2020

Well Details

Well ID: 37-031-24902
Loading map...
Country: United States
State: Pennsylvania
County: Clarion
Municipality: Ashland Township
Operator Name: DANNIC ENERGY CORP
Well Pad ID:
Farm/Lease Name: MASTERS 14
License Status:
Spud Date:
Permit Date: 2008-04-16
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.309211
Longitude: -79.599030

For data sources see[1][2][3]

Well History

Date Event
2008-04-16 New Permit Application
2009-01-29 Performed Spud Operation
2009-02-03 Drilling Completion
2015-12-02 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2009 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2010 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2011 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2012 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2013 DANNIC ENERGY CORP 0.00 0 62.09 214 0.00 0
2014 DANNIC ENERGY CORP 0.00 0 12.71 62 0.00 0
2015 DANNIC ENERGY CORP 0.00 0 10.95 61 0.00 0
2016 DANNIC ENERGY CORP 0.00 0 14.00 366 0.00 0
2017 DANNIC ENERGY CORP 0.00 0 5.00 365 0.00 0
2018 DANNIC ENERGY CORP 0.00 0 12.50 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 DANNIC ENERGY CORP Produced Fluid 270.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2015 DANNIC ENERGY CORP Produced Fluid 6,720.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2016 DANNIC ENERGY CORP Produced Fluid 160.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2017 DANNIC ENERGY CORP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2018 DANNIC ENERGY CORP Produced Fluid 160.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2019 DANNIC ENERGY CORP Produced Fluid 160.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1758870 Primary Facility 2008-12-11 Routine/Complete Inspection Violation(s) Noted
1771577 Primary Facility 2009-02-24 Routine/Complete Inspection Violation(s) Noted
1772379 Primary Facility 2009-02-25 Drilling/Alteration No Violations Noted
1795349 Primary Facility 2009-04-29 Routine/Complete Inspection Violation(s) Noted
1818670 Primary Facility 2009-07-29 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
1821587 Primary Facility 2009-08-19 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
1824912 Primary Facility 2009-08-26 Routine/Complete Inspection No Violations Noted
1841053 Primary Facility 2009-11-04 Routine/Complete Inspection Violation(s) Noted
1848243 Primary Facility 2009-12-07 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
1853456 Primary Facility 2009-12-23 Routine/Complete Inspection No Violations Noted
1904464 Primary Facility 2010-08-04 Routine/Complete Inspection Violation(s) Noted
1927198 Primary Facility 2010-11-12 Compliance Evaluation Outstanding Violations - No Viols Req'd
2100234 Primary Facility 2012-09-10 Compliance Evaluation No Violations Noted
2159416 Primary Facility 2013-04-16 Routine/Complete Inspection No Violations Noted
2423279 Primary Facility 2015-11-09 Administrative/File Review No Violations Noted completion report missing open flow and shut in pressure.
2626371 Primary Facility 2017-08-17 Routine/Partial Inspection No Violations Noted Well is equipped for production. Pipeline connected to tubing and surface casing. Both line equipped with check valves at the wellsite.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1758870 553423 12/11/2008 2008-12-11 102.4NOPLAN - No E&S plan developed, plan not on site Administrative
1771577 557046 02/24/2009 2009-02-24 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment Administrative
1795349 562009 04/29/2009 2009-04-29 102.4INADPLN - E&S Plan not adequate Administrative
1841053 575015 11/04/2009 2009-11-04 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging Environmental Health & Safety 78.56(d)
1904464 592798 08/04/2010 2010-08-04 210UNPLUG - Failure to plug a well upon abandonment Administrative granted inactive status
1904464 592799 08/04/2010 2010-08-04 78.62 - Improper encapsulation of waste Administrative 78.62(a)(17)

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
553423 241733 NOV - Notice of Violation Comply/Closed 2009-05-08
557046 243617 NOV - Notice of Violation Administrative Close Out 2015-04-17
562009 246575 NOV - Notice of Violation Comply/Closed 2009-08-26
562009 249448 NOV - Notice of Violation Comply/Closed 2009-09-10
575015 252298 NOV - Notice of Violation Comply/Closed 2009-12-23
575015 253423 NOV - Notice of Violation Comply/Closed 2009-12-23
592798 264115 NOV - Notice of Violation Comply/Closed 2013-04-16
592798 274701 NOV - Notice of Violation Comply/Closed 2013-04-16
592799 264115 NOV - Notice of Violation Comply/Closed 2013-04-16

For data sources see[7]

References