X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-031-24992"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-031-24992
 
| Well ID: 37-031-24992
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.312433, -79.603219 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.312433, -79.603219 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: MASTERS 23
 
| Farm/Lease Name: MASTERS 23
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 01/06/2009
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 7/3/2008
+
| Permit Date: 2008-07-03
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.312433
 
| Latitude: 41.312433
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2008-07-03
 +
| New Permit Application
 +
|-
 +
| 2009-01-06
 +
| Performed Spud Operation
 +
|-
 +
| 2009-01-14
 +
| Drilling Completion
 +
|-
 +
| 2010-01-27
 +
| Perforation
 +
|-
 +
| 2010-03-04
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 127:
 
|-
 
|-
 
| 2008
 
| 2008
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 76.35
 
| style="text-align: right;" | 76.35
 
| style="text-align: right;" | 214
 
| style="text-align: right;" | 214
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 12.71
 
| style="text-align: right;" | 12.71
 
| style="text-align: right;" | 62
 
| style="text-align: right;" | 62
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 10.95
 
| style="text-align: right;" | 10.95
 
| style="text-align: right;" | 61
 
| style="text-align: right;" | 61
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 13.00
 
| style="text-align: right;" | 13.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 5.00
 
| style="text-align: right;" | 5.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 12.50
 
| style="text-align: right;" | 12.50
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 169: Line 235:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 174: Line 241:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2013-0
+
| 2013
| Produced Fluid (in Barrels)
+
| [[DANNIC ENERGY CORP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0020346
 
| PA0020346
 
|-
 
|-
| 2013-0
+
| 2013
| Produced Fluid (in Barrels)
+
| [[DANNIC ENERGY CORP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 640.00 Bbl
 
| style="text-align: right;" | 640.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0028428
 
| PA0028428
 
|-
 
|-
| 2014-0
+
| 2014
| Produced Fluid (in Barrels)
+
| [[DANNIC ENERGY CORP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 260.00 Bbl
 
| style="text-align: right;" | 260.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0028428
 
| PA0028428
 
|-
 
|-
| 2016-0
+
| 2015
| Produced Fluid (in Barrels) RWC 802
+
| [[DANNIC ENERGY CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 3,360.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0028428
 +
|-
 +
| 2016
 +
| [[DANNIC ENERGY CORP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0028428
 
| PA0028428
 
|-
 
|-
| 2018-0
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[DANNIC ENERGY CORP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
Line 223: Line 302:
 
| 1758879
 
| 1758879
 
| Primary Facility
 
| Primary Facility
| 12/11/2008
+
| 2008-12-11
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 230: Line 309:
 
| 1764614
 
| 1764614
 
| Primary Facility
 
| Primary Facility
| 01/26/2009
+
| 2009-01-26
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 237: Line 316:
 
| 1798102
 
| 1798102
 
| Primary Facility
 
| Primary Facility
| 05/08/2009
+
| 2009-05-08
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 244: Line 323:
 
| 1820345
 
| 1820345
 
| Primary Facility
 
| Primary Facility
| 08/14/2009
+
| 2009-08-14
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 251: Line 330:
 
| 1821654
 
| 1821654
 
| Primary Facility
 
| Primary Facility
| 08/19/2009
+
| 2009-08-19
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 258: Line 337:
 
| 1841042
 
| 1841042
 
| Primary Facility
 
| Primary Facility
| 11/04/2009
+
| 2009-11-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 265: Line 344:
 
| 1848252
 
| 1848252
 
| Primary Facility
 
| Primary Facility
| 12/07/2009
+
| 2009-12-07
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 272: Line 351:
 
| 1853466
 
| 1853466
 
| Primary Facility
 
| Primary Facility
| 12/23/2009
+
| 2009-12-23
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 279: Line 358:
 
| 1904419
 
| 1904419
 
| Primary Facility
 
| Primary Facility
| 08/04/2010
+
| 2010-08-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 286: Line 365:
 
| 1927187
 
| 1927187
 
| Primary Facility
 
| Primary Facility
| 11/12/2010
+
| 2010-11-12
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 293: Line 372:
 
| 2100360
 
| 2100360
 
| Primary Facility
 
| Primary Facility
| 09/10/2012
+
| 2012-09-10
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 300: Line 379:
 
| 2160111
 
| 2160111
 
| Primary Facility
 
| Primary Facility
| 04/16/2013
+
| 2013-04-16
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 326: Line 405:
 
| 553432
 
| 553432
 
| 12/11/2008
 
| 12/11/2008
| 05/08/2009
+
| 2008-12-11
 
| 102.4NOPLAN - No E&S plan developed, plan not on site
 
| 102.4NOPLAN - No E&S plan developed, plan not on site
 
| Administrative
 
| Administrative
Line 334: Line 413:
 
| 562955
 
| 562955
 
| 05/08/2009
 
| 05/08/2009
| 08/14/2009
+
| 2009-05-08
 
| 102.4INADPLN - E&S Plan not adequate
 
| 102.4INADPLN - E&S Plan not adequate
 
| Administrative
 
| Administrative
Line 342: Line 421:
 
| 569358
 
| 569358
 
| 08/14/2009
 
| 08/14/2009
| 08/26/2009
+
| 2009-08-14
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
| Administrative
 
| Administrative
Line 350: Line 429:
 
| 575009
 
| 575009
 
| 11/04/2009
 
| 11/04/2009
| 12/23/2009
+
| 2009-11-04
 
| 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging
 
| 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 358: Line 437:
 
| 592775
 
| 592775
 
| 08/04/2010
 
| 08/04/2010
| 11/12/2010
+
| 2010-08-04
 
| 206EQUIPRMVL - Failure to remove equipment within 9 months of completion of drilling or plugging
 
| 206EQUIPRMVL - Failure to remove equipment within 9 months of completion of drilling or plugging
 
| Administrative
 
| Administrative
Line 366: Line 445:
 
| 592776
 
| 592776
 
| 08/04/2010
 
| 08/04/2010
| 02/28/2012
+
| 2010-08-04
 
| 210UNPLUG - Failure to plug a well upon abandonment
 
| 210UNPLUG - Failure to plug a well upon abandonment
 
| Administrative
 
| Administrative
Line 374: Line 453:
 
| 592777
 
| 592777
 
| 08/04/2010
 
| 08/04/2010
| 11/12/2010
+
| 2010-08-04
 
| 78.62 - Improper encapsulation of waste
 
| 78.62 - Improper encapsulation of waste
 
| Administrative
 
| Administrative
Line 396: Line 475:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 05/08/2009
+
| 2009-05-08
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 405: Line 484:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 08/26/2009
+
| 2009-08-26
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 414: Line 493:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 09/10/2009
+
| 2009-09-10
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 423: Line 502:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 12/23/2009
+
| 2009-12-23
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 432: Line 511:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 12/23/2009
+
| 2009-12-23
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 441: Line 520:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 04/16/2013
+
| 2013-04-16
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 450: Line 529:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 04/16/2013
+
| 2013-04-16
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 459: Line 538:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 04/16/2013
+
| 2013-04-16
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 468: Line 547:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 04/16/2013
+
| 2013-04-16
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 479: Line 558:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 17:45, 22 May 2020

Well Details

Well ID: 37-031-24992
Loading map...
Country: United States
State: Pennsylvania
County: Clarion
Municipality: Ashland Township
Operator Name: DANNIC ENERGY CORP
Well Pad ID:
Farm/Lease Name: MASTERS 23
License Status:
Spud Date:
Permit Date: 2008-07-03
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.312433
Longitude: -79.603219

For data sources see[1][2][3]

Well History

Date Event
2008-07-03 New Permit Application
2009-01-06 Performed Spud Operation
2009-01-14 Drilling Completion
2010-01-27 Perforation
2010-03-04 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2009 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2010 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2011 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2012 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2013 DANNIC ENERGY CORP 0.00 0 76.35 214 0.00 0
2014 DANNIC ENERGY CORP 0.00 0 12.71 62 0.00 0
2015 DANNIC ENERGY CORP 0.00 0 10.95 61 0.00 0
2016 DANNIC ENERGY CORP 0.00 0 13.00 366 0.00 0
2017 DANNIC ENERGY CORP 0.00 0 5.00 365 0.00 0
2018 DANNIC ENERGY CORP 0.00 0 12.50 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 DANNIC ENERGY CORP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2013 DANNIC ENERGY CORP Produced Fluid 640.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2014 DANNIC ENERGY CORP Produced Fluid 260.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2015 DANNIC ENERGY CORP Produced Fluid 3,360.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2016 DANNIC ENERGY CORP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2018 DANNIC ENERGY CORP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1758879 Primary Facility 2008-12-11 Routine/Complete Inspection Violation(s) Noted
1764614 Primary Facility 2009-01-26 Drilling/Alteration No Violations Noted
1798102 Primary Facility 2009-05-08 Routine/Complete Inspection Violation(s) Noted
1820345 Primary Facility 2009-08-14 Routine/Complete Inspection Violation(s) Noted
1821654 Primary Facility 2009-08-19 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
1841042 Primary Facility 2009-11-04 Routine/Complete Inspection Violation(s) Noted
1848252 Primary Facility 2009-12-07 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
1853466 Primary Facility 2009-12-23 Routine/Complete Inspection No Violations Noted
1904419 Primary Facility 2010-08-04 Routine/Complete Inspection Violation(s) Noted
1927187 Primary Facility 2010-11-12 Compliance Evaluation Outstanding Violations - No Viols Req'd
2100360 Primary Facility 2012-09-10 Routine/Complete Inspection No Violations Noted
2160111 Primary Facility 2013-04-16 Routine/Complete Inspection No Violations Noted
2626424 Primary Facility 2017-08-17 Routine/Partial Inspection No Violations Noted Well is equipped for production. Pipelines connected to tubing and surface casing. Both pipelines have check valves installed at the wellsite. Appears to have some minor fluid that leaked from the stuffing box.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1758879 553432 12/11/2008 2008-12-11 102.4NOPLAN - No E&S plan developed, plan not on site Administrative
1798102 562955 05/08/2009 2009-05-08 102.4INADPLN - E&S Plan not adequate Administrative
1820345 569358 08/14/2009 2009-08-14 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment Administrative 78.56(a)(4)(v)
1841042 575009 11/04/2009 2009-11-04 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging Environmental Health & Safety 78.56(d)
1904419 592775 08/04/2010 2010-08-04 206EQUIPRMVL - Failure to remove equipment within 9 months of completion of drilling or plugging Administrative
1904419 592776 08/04/2010 2010-08-04 210UNPLUG - Failure to plug a well upon abandonment Administrative granted inactive status
1904419 592777 08/04/2010 2010-08-04 78.62 - Improper encapsulation of waste Administrative 78.62(a)(17)

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
553432 241733 NOV - Notice of Violation Comply/Closed 2009-05-08
562955 246575 NOV - Notice of Violation Comply/Closed 2009-08-26
569358 249448 NOV - Notice of Violation Comply/Closed 2009-09-10
575009 252298 NOV - Notice of Violation Comply/Closed 2009-12-23
575009 253423 NOV - Notice of Violation Comply/Closed 2009-12-23
592775 264115 NOV - Notice of Violation Comply/Closed 2013-04-16
592776 264115 NOV - Notice of Violation Comply/Closed 2013-04-16
592776 274701 NOV - Notice of Violation Comply/Closed 2013-04-16
592777 264115 NOV - Notice of Violation Comply/Closed 2013-04-16

For data sources see[7]

References