X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-033-20720"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-033-20720
 
| Well ID: 37-033-20720
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.861194, -78.763639 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.861194, -78.763639 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: CARTER SMITH 1
 
| Farm/Lease Name: CARTER SMITH 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 02/15/1978
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 11/17/1977
+
| Permit Date: 1977-11-17
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.861194
 
| Latitude: 40.861194
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1977-11-17
 +
| New Permit Application
 +
|-
 +
| 1978-02-15
 +
| Performed Spud Operation
 +
|-
 +
| 1978-02-19
 +
| Drilling Completion
 +
|-
 +
| 1978-04-25
 +
| Perforation
 +
|-
 +
| 1978-05-22
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 127:
 
|-
 
|-
 
| 1991
 
| 1991
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 4,433.00
+
| style="text-align: right;" | 4433.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
|-
 +
| 1994
 +
| [[ENERGY CORP OF AMER]]
 +
| style="text-align: right;" | 4723.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1995
 +
| [[ENERGY CORP OF AMER]]
 +
| style="text-align: right;" | 4158.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996
 
| 1996
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 4,541.00
+
| style="text-align: right;" | 4541
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997
 
| 1997
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 5,177.00
+
| style="text-align: right;" | 5177
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998
 
| 1998
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 4,874.00
+
| style="text-align: right;" | 4874
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999
 
| 1999
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 4,590.00
+
| style="text-align: right;" | 4590
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000
 
| 2000
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 4,609.00
+
| style="text-align: right;" | 4609
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 4,191.00
+
| style="text-align: right;" | 4191
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 3,844.00
+
| style="text-align: right;" | 3844
 
| style="text-align: right;" | 347
 
| style="text-align: right;" | 347
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 3,651.00
+
| style="text-align: right;" | 3651
 
| style="text-align: right;" | 342
 
| style="text-align: right;" | 342
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 3,688.00
+
| style="text-align: right;" | 3688
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 4,268.00
+
| style="text-align: right;" | 4268
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 3,898.00
+
| style="text-align: right;" | 3898.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 3,721.00
+
| style="text-align: right;" | 3721.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 3,364.00
+
| style="text-align: right;" | 3364.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 3,268.00
+
| style="text-align: right;" | 3268.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 200: Line 284:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 209: Line 293:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 218: Line 302:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 227: Line 311:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 236: Line 320:
 
| style="text-align: right;" | 308
 
| style="text-align: right;" | 308
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 245: Line 329:
 
| style="text-align: right;" | 8
 
| style="text-align: right;" | 8
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
| style="text-align: right;" |
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
| style="text-align: right;" |
+
| [[GREYLOCK CONVENTIONAL LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
| style="text-align: right;" |  
+
| [[GREYLOCK CONVENTIONAL LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[GREYLOCK CONVENTIONAL LLC]]
 +
| style="text-align: right;" | 3,067.00
 +
| style="text-align: right;" | 361
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 286: Line 379:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 291: Line 385:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 1991-0
+
| 1991
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 60.00 Bbl
 
| style="text-align: right;" | 60.00 Bbl
Line 297: Line 392:
 
|  
 
|  
 
|-
 
|-
| 1996-0
+
| 1996
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 303: Line 399:
 
| PA 0026310
 
| PA 0026310
 
|-
 
|-
| 1997-0
+
| 1997
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 36.00 Bbl
 
| style="text-align: right;" | 36.00 Bbl
Line 309: Line 406:
 
| 005-21675
 
| 005-21675
 
|-
 
|-
| 2008-0
+
| 2008
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 35.00 Bbl
 
| style="text-align: right;" | 35.00 Bbl
Line 315: Line 413:
 
| PA0026310
 
| PA0026310
 
|-
 
|-
| 2011-0
+
| 2011
| Produced Fluid (in Barrels)
+
| [[ENERGY CORP OF AMER]]
 +
| Produced Fluid
 
| style="text-align: right;" | 30.00 Bbl
 
| style="text-align: right;" | 30.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
Line 360: Line 459:
 
!scope="col" | Penalty Amount
 
!scope="col" | Penalty Amount
 
!scope="col" | Amount Collected
 
!scope="col" | Amount Collected
|-
 
|}-->
 
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
 
|-
 
|-
 
|}-->
 
|}-->

Latest revision as of 20:09, 22 May 2020

Well Details

Well ID: 37-033-20720
Loading map...
Country: United States
State: Pennsylvania
County: Clearfield
Municipality: Bell Township
Operator Name: GREYLOCK CONVENTIONAL LLC
Well Pad ID:
Farm/Lease Name: CARTER SMITH 1
License Status: ACTIVE
Spud Date:
Permit Date: 1977-11-17
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.861194
Longitude: -78.763639

For data sources see[1][2][3]

Well History

Date Event
1977-11-17 New Permit Application
1978-02-15 Performed Spud Operation
1978-02-19 Drilling Completion
1978-04-25 Perforation
1978-05-22 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1991 ENERGY CORP OF AMER 4433.00 365 0.00 0 0.00 0
1994 ENERGY CORP OF AMER 4723.00 365 0.00 0 0.00 0
1995 ENERGY CORP OF AMER 4158.00 365 0.00 0 0.00 0
1996 ENERGY CORP OF AMER 4541 365 0.00 0 0.00 0
1997 ENERGY CORP OF AMER 5177 365 0.00 0 0.00 0
1998 ENERGY CORP OF AMER 4874 365 0.00 0 0.00 0
1999 ENERGY CORP OF AMER 4590 365 0.00 0 0.00 0
2000 ENERGY CORP OF AMER 4609 366 0.00 0 0.00 0
2001 ENERGY CORP OF AMER 4191 365 0.00 0 0.00 0
2002 ENERGY CORP OF AMER 3844 347 0.00 0 0.00 0
2003 ENERGY CORP OF AMER 3651 342 0.00 0 0.00 0
2004 ENERGY CORP OF AMER 3688 366 0.00 0 0.00 0
2005 ENERGY CORP OF AMER 4268 365 0.00 0 0.00 0
2006 ENERGY CORP OF AMER 3898.00 365 0.00 0 0.00 0
2007 ENERGY CORP OF AMER 3721.00 365 0.00 0 0.00 0
2008 ENERGY CORP OF AMER 3364.00 365 0.00 0 0.00 0
2009 ENERGY CORP OF AMER 3268.00 365 0.00 0 0.00 0
2010 ENERGY CORP OF AMER 2,904.00 365 0.00 0 0.00 0
2011 ENERGY CORP OF AMER 2,572.00 365 0.00 0 0.00 0
2012 ENERGY CORP OF AMER 2,888.00 366 0.00 0 0.00 0
2013 ENERGY CORP OF AMER 2,417.00 365 0.00 0 0.00 0
2014 ENERGY CORP OF AMER 1,361.00 308 0.00 0 0.00 0
2015 ENERGY CORP OF AMER 15.00 8 0.00 0 0.00 0
2016 ENERGY CORP OF AMER 0.00 0 0.00 0 0.00 0
2017 GREYLOCK CONVENTIONAL LLC 0.00 0 0.00 0 0.00 0
2018 GREYLOCK CONVENTIONAL LLC 0.00 0 0.00 0 0.00 0
2019 GREYLOCK CONVENTIONAL LLC 3,067.00 361 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
1991 ENERGY CORP OF AMER Brine 60.00 Bbl
1996 ENERGY CORP OF AMER Brine 80.00 Bbl Brine or Industrial Waste Treatment Plt PA 0026310
1997 ENERGY CORP OF AMER Brine 36.00 Bbl Injection Disposal Well 005-21675
2008 ENERGY CORP OF AMER Brine 35.00 Bbl Municipal Sewage Treatment Plant PA0026310
2011 ENERGY CORP OF AMER Produced Fluid 30.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310

For data sources see[6]

References