X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-121-45054"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-121-45054
 
| Well ID: 37-121-45054
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.437892, -79.627236 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.437892, -79.627236 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: STATE GAME LANDS NO 47 10
 
| Farm/Lease Name: STATE GAME LANDS NO 47 10
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2013-07-19
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2012-11-21
 
| Permit Date: 2012-11-21
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.437892
 
| Latitude: 41.437892
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2012-11-21
 +
| New Permit Application
 +
|-
 +
| 2013-07-19
 +
| Performed Spud Operation
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 92:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 157: Line 189:
 
| 2013
 
| 2013
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 350.00 Bbl
 
| style="text-align: right;" | 350.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
Line 164: Line 196:
 
| 2014
 
| 2014
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 320.00 Bbl
 
| style="text-align: right;" | 320.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0028428
 +
|-
 +
| 2015
 +
| [[DANNIC ENERGY CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 10,080.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0028428
 
| PA0028428
Line 171: Line 210:
 
| 2016
 
| 2016
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 160.00 Bbl
 
| style="text-align: right;" | 160.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT

Latest revision as of 03:16, 2 June 2020

Well Details

Well ID: 37-121-45054
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: President Township
Operator Name: DANNIC ENERGY CORP
Well Pad ID:
Farm/Lease Name: STATE GAME LANDS NO 47 10
License Status:
Spud Date:
Permit Date: 2012-11-21
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.437892
Longitude: -79.627236

For data sources see[1][2][3]

Well History

Date Event
2012-11-21 New Permit Application
2013-07-19 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 DANNIC ENERGY CORP 0.00 0 27.00 30 0.00 0
2014 DANNIC ENERGY CORP 0.00 0 40.92 93 0.00 0
2015 DANNIC ENERGY CORP 0.00 0 13.95 365 0.00 0
2016 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2017 DANNIC ENERGY CORP 0.00 0 14.00 365 0.00 0
2018 DANNIC ENERGY CORP 0.00 0 4.50 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 DANNIC ENERGY CORP Produced Fluid 350.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2014 DANNIC ENERGY CORP Produced Fluid 320.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2015 DANNIC ENERGY CORP Produced Fluid 10,080.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2016 DANNIC ENERGY CORP Produced Fluid 160.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2184800 Primary Facility 2013-07-19 Drilling/Alteration No Violations Noted
2184826 Primary Facility 2013-07-19 Routine/Complete Inspection Viol(s) Noted & Immediately Corrected
2188752 Primary Facility 2013-07-24 Routine/Complete Inspection No Violations Noted
2202258 Primary Facility 2013-08-30 Routine/Complete Inspection No Violations Noted
2209727 Primary Facility 2013-10-03 Routine/Complete Inspection No Violations Noted
2211957 Primary Facility 2013-10-03 Administrative/File Review Violation(s) Noted
2218163 Primary Facility 2013-10-29 Routine/Complete Inspection No Violations Noted
2303405 Primary Facility 2014-09-11 Routine/Complete Inspection No Violations Noted
2347717 Primary Facility 2015-03-02 Administrative/File Review No Violations Noted
2394474 Primary Facility 2015-07-30 Site Restoration No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2184826 673039 07/19/2013 2013-07-19 201E - Failure to comply with terms and conditions of permit Environmental Health & Safety
2211957 680075 10/03/2013 2013-10-03 212WELLRCD - Failure to submit well record within 30 days of completion of drilling Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
680075 303263 NOV - Notice of Violation Comply/Closed 2014-02-04
680075 307575 CACP - Consent Assessment of Civil Penalty Comply/Closed 2014-02-04 2014-02-04 $3,645.00 $3,645.00

For data sources see[7]

References