X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-105-21058"

m
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-105-21058
 
| Well ID: 37-105-21058
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.944340, -77.944844 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.944360, -77.944950 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: YOUNG 2
 
| Farm/Lease Name: YOUNG 2
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 02/22/1996
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 12/5/1995
+
| Permit Date: 1995-12-05
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 29: Line 31:
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 
|-
 
|-
| Latitude: 41.944340
+
| Conservation: No
 +
|-
 +
| Latitude: 41.944360
 
|-
 
|-
| Longitude: -77.944844
+
| Longitude: -77.944950
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1995-12-05
 +
| New Permit Application
 +
|-
 +
| 1996-02-22
 +
| Performed Spud Operation
 +
|-
 +
| 1996-03-04
 +
| Drilling Completion
 +
|-
 +
| 1996-03-04
 +
| Perforation
 +
|-
 +
| 1996-06-03
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 62: Line 128:
 
| 1996
 
| 1996
 
| [[EXCO RESOURCES PA INC]]
 
| [[EXCO RESOURCES PA INC]]
| style="text-align: right;" | 1,021.00
+
| style="text-align: right;" | 1021
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[EXCO RESOURCES PA INC]]
 
| [[EXCO RESOURCES PA INC]]
| style="text-align: right;" | 966.00
+
| style="text-align: right;" | 966
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[EXCO RESOURCES PA INC]]
 
| [[EXCO RESOURCES PA INC]]
| style="text-align: right;" | 3,290.00
+
| style="text-align: right;" | 3290
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999
 
| 1999
 
| [[EXCO RESOURCES PA INC]]
 
| [[EXCO RESOURCES PA INC]]
| style="text-align: right;" | 3,230.00
+
| style="text-align: right;" | 3230
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[EXCO RESOURCES PA INC]]
 
| [[EXCO RESOURCES PA INC]]
| style="text-align: right;" | 2,585.00
+
| style="text-align: right;" | 2585
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[EXCO RESOURCES PA INC]]
 
| [[EXCO RESOURCES PA INC]]
| style="text-align: right;" | 1,040.00
+
| style="text-align: right;" | 1040
 
| style="text-align: right;" | 153
 
| style="text-align: right;" | 153
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[CHARIS ENERGY LLC]]
 
| [[CHARIS ENERGY LLC]]
| style="text-align: right;" | 1,741.00
+
| style="text-align: right;" | 1741
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[CHARIS ENERGY LLC]]
 
| [[CHARIS ENERGY LLC]]
| style="text-align: right;" | 2,253.00
+
| style="text-align: right;" | 2253
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[CHARIS ENERGY LLC]]
 
| [[CHARIS ENERGY LLC]]
| style="text-align: right;" | 1,697.00
+
| style="text-align: right;" | 1697
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[CHARIS ENERGY LLC]]
 
| [[CHARIS ENERGY LLC]]
| style="text-align: right;" | 1,905.48
+
| style="text-align: right;" | 1905.48
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 155: Line 221:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
Line 164: Line 230:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
| style="text-align: right;" |
+
| [[CHARIS ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
| style="text-align: right;" |
+
| [[CHARIS ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 200: Line 266:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
| style="text-align: right;" | 0.00
+
| style="text-align: right;" | 0
| style="text-align: right;" |  
+
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[PLANTS & GOODWIN INC]]
 
| [[PLANTS & GOODWIN INC]]
| style="text-align: right;" | 127.40
+
| style="text-align: right;" | 127.4
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.13
 
| style="text-align: right;" | 0.13
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
| style="text-align: right;" | 0.00
+
| style="text-align: right;" | 0
| style="text-align: right;" |  
+
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2015
 
| 2015
Line 228: Line 294:
 
| style="text-align: right;" | 0.20
 
| style="text-align: right;" | 0.20
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
| style="text-align: right;" | 0.00
+
| style="text-align: right;" | 0
| style="text-align: right;" |  
+
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2017
 
| 2017
Line 236: Line 302:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 247: Line 313:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 259: Line 325:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 264: Line 331:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 1998-0
+
| 1998
 +
| [[EXCO RESOURCES PA INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 190.45 Bbl
 
| style="text-align: right;" | 190.45 Bbl
Line 270: Line 338:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2011-0
+
| 2011
| Produced Fluid (in Barrels)
+
| [[PLANTS & GOODWIN INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 0.11 Bbl
 
| style="text-align: right;" | 0.11 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2012-0
+
| 2012
| Produced Fluid (in Barrels)
+
| [[PLANTS & GOODWIN INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 1.33 Bbl
 
| style="text-align: right;" | 1.33 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2013-0
+
| 2013
| Produced Fluid (in Barrels)
+
| [[PLANTS & GOODWIN INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 5.33 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0102784
 +
|-
 +
| 2013
 +
| [[PLANTS & GOODWIN INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 5.33 Bbl
 
| style="text-align: right;" | 5.33 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2014-0
+
| 2014
| Produced Fluid (in Barrels)
+
| [[PLANTS & GOODWIN INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 6.13 Bbl
 
| style="text-align: right;" | 6.13 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2016-0
+
| 2014
| Produced Fluid (in Barrels) RWC 802
+
| [[PLANTS & GOODWIN INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 6.13 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0102784
 +
|-
 +
| 2015
 +
| [[PLANTS & GOODWIN INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 24.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0102784
 +
|-
 +
| 2015
 +
| [[PLANTS & GOODWIN INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 24 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0102784
 +
|-
 +
| 2016
 +
| [[PLANTS & GOODWIN INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 19.67 Bbl
 
| style="text-align: right;" | 19.67 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2017-0
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[PLANTS & GOODWIN INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 19.67 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0102784
 +
|-
 +
| 2017
 +
| [[PLANTS & GOODWIN INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 13.67 Bbl
 
| style="text-align: right;" | 13.67 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
| WMGR123NW005
 
|-
 
|-
| 2018-0
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[PLANTS & GOODWIN INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 11.00 Bbl
 
| style="text-align: right;" | 11.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 331: Line 441:
 
| 687235
 
| 687235
 
| Primary Facility
 
| Primary Facility
| 02/22/1996
+
| 1996-02-22
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 338: Line 448:
 
| 687287
 
| 687287
 
| Primary Facility
 
| Primary Facility
| 03/04/1996
+
| 1996-03-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 345: Line 455:
 
| 687293
 
| 687293
 
| Primary Facility
 
| Primary Facility
| 03/06/1996
+
| 1996-03-06
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 352: Line 462:
 
| 687305
 
| 687305
 
| Primary Facility
 
| Primary Facility
| 03/25/1996
+
| 1996-03-25
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 359: Line 469:
 
| 689673
 
| 689673
 
| Primary Facility
 
| Primary Facility
| 04/29/1999
+
| 1999-04-29
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 366: Line 476:
 
| 689680
 
| 689680
 
| Primary Facility
 
| Primary Facility
| 05/19/1999
+
| 1999-05-19
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 373: Line 483:
 
| 689758
 
| 689758
 
| Primary Facility
 
| Primary Facility
| 06/23/1999
+
| 1999-06-23
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 380: Line 490:
 
| 689801
 
| 689801
 
| Primary Facility
 
| Primary Facility
| 07/27/1999
+
| 1999-07-27
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 399: Line 509:
 
| 106524
 
| 106524
 
| 02/22/1996
 
| 02/22/1996
| 09/13/1999
+
| 1996-02-22
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 407: Line 517:
 
| 113754
 
| 113754
 
| 04/29/1999
 
| 04/29/1999
| 07/27/1999
+
| 1999-04-29
 
| 201TAG - Failure to install, in a permanent manner, the permit number on a completed well
 
| 201TAG - Failure to install, in a permanent manner, the permit number on a completed well
 
| Administrative
 
| Administrative
Line 415: Line 525:
 
| 113755
 
| 113755
 
| 04/29/1999
 
| 04/29/1999
| 07/27/1999
+
| 1999-04-29
 
| 78.64 - Inadequate containment of oil tank
 
| 78.64 - Inadequate containment of oil tank
 
| Administrative
 
| Administrative
Line 423: Line 533:
 
| 113842
 
| 113842
 
| 05/19/1999
 
| 05/19/1999
| 07/27/1999
+
| 1999-05-19
 
| 201TAG - Failure to install, in a permanent manner, the permit number on a completed well
 
| 201TAG - Failure to install, in a permanent manner, the permit number on a completed well
 
| Administrative
 
| Administrative
Line 431: Line 541:
 
| 113843
 
| 113843
 
| 05/19/1999
 
| 05/19/1999
| 07/27/1999
+
| 1999-05-19
 
| 78.64 - Inadequate containment of oil tank
 
| 78.64 - Inadequate containment of oil tank
 
| Administrative
 
| Administrative
Line 439: Line 549:
 
| 113904
 
| 113904
 
| 06/23/1999
 
| 06/23/1999
| 07/27/2000
+
| 1999-06-23
 
| 201TAG - Failure to install, in a permanent manner, the permit number on a completed well
 
| 201TAG - Failure to install, in a permanent manner, the permit number on a completed well
 
| Administrative
 
| Administrative
Line 447: Line 557:
 
| 113905
 
| 113905
 
| 06/23/1999
 
| 06/23/1999
| 07/27/2000
+
| 1999-06-23
 
| 78.64 - Inadequate containment of oil tank
 
| 78.64 - Inadequate containment of oil tank
 
| Administrative
 
| Administrative
Line 471: Line 581:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 12:21, 2 June 2020

Well Details

Well ID: 37-105-21058
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: Genesee Township
Operator Name: PLANTS & GOODWIN INC
Well Pad ID:
Farm/Lease Name: YOUNG 2
License Status: ACTIVE
Spud Date:
Permit Date: 1995-12-05
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.944360
Longitude: -77.944950

For data sources see[1][2][3]

Well History

Date Event
1995-12-05 New Permit Application
1996-02-22 Performed Spud Operation
1996-03-04 Drilling Completion
1996-03-04 Perforation
1996-06-03 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1996 EXCO RESOURCES PA INC 1021 365 0.00 0 0.00 0
1997 EXCO RESOURCES PA INC 966 365 0.00 0 0.00 0
1998 EXCO RESOURCES PA INC 3290 365 0.00 0 0.00 0
1999 EXCO RESOURCES PA INC 3230 365 0.00 0 0.00 0
2000 EXCO RESOURCES PA INC 2585 365 0.00 0 0.00 0
2001 EXCO RESOURCES PA INC 1040 153 0.00 0 0.00 0
2002 CHARIS ENERGY LLC 1741 180 0.00 0 0.00 0
2003 CHARIS ENERGY LLC 2253 365 0.00 0 0.00 0
2004 CHARIS ENERGY LLC 1697 365 0.00 0 0.00 0
2005 CHARIS ENERGY LLC 1905.48 365 0.00 0 0.00 0
2008 CHARIS ENERGY INC 879.33 365 0.00 0 0.00 0
2009 CHARIS ENERGY INC 771.65 365 0.00 0 0.00 0
2010 CHARIS ENERGY INC 0.00 0 0.00 0 0.00 0
2011 CHARIS ENERGY INC 0.00 0 0.00 0 0.00 0
2012 PLANTS & GOODWIN INC 75.00 365 0.07 365 0.01 365
2013 PLANTS & GOODWIN INC 1.33 365 0.00 0 0 365
2014 PLANTS & GOODWIN INC 127.4 365 0.13 365 0 365
2015 PLANTS & GOODWIN INC 1,334.13 365 0.01 365 0.01 365
2016 PLANTS & GOODWIN INC 1,182.13 365 0.20 365 0 365
2017 PLANTS & GOODWIN INC 823.33 365 0.00 0 0.00 0
2018 PLANTS & GOODWIN INC 634.07 365 0.13 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
1998 EXCO RESOURCES PA INC Brine 190.45 Bbl Brine or Industrial Waste Treatment Plt PA0102784
2011 PLANTS & GOODWIN INC Produced Fluid 0.11 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2012 PLANTS & GOODWIN INC Produced Fluid 1.33 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2013 PLANTS & GOODWIN INC Produced Fluid 5.33 Bbl CENT WASTE TRT FAC NPDES PA0102784
2013 PLANTS & GOODWIN INC Produced Fluid 5.33 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2014 PLANTS & GOODWIN INC Produced Fluid 6.13 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2014 PLANTS & GOODWIN INC Produced Fluid 6.13 Bbl CENT WASTE TRT FAC NPDES PA0102784
2015 PLANTS & GOODWIN INC Produced Fluid 24.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2015 PLANTS & GOODWIN INC Produced Fluid 24 Bbl CENT WASTE TRT FAC NPDES PA0102784
2016 PLANTS & GOODWIN INC Produced Fluid 19.67 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2016 PLANTS & GOODWIN INC Produced Fluid 19.67 Bbl CENT WASTE TRT FAC NPDES PA0102784
2017 PLANTS & GOODWIN INC Produced Fluid 13.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 PLANTS & GOODWIN INC Produced Fluid 11.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
687235 Primary Facility 1996-02-22 Drilling/Alteration Violation(s) Noted
687287 Primary Facility 1996-03-04 Routine/Complete Inspection No Violations Noted
687293 Primary Facility 1996-03-06 Drilling/Alteration No Violations Noted
687305 Primary Facility 1996-03-25 Routine/Complete Inspection No Violations Noted
689673 Primary Facility 1999-04-29 Routine/Complete Inspection Violation(s) Noted
689680 Primary Facility 1999-05-19 Routine/Complete Inspection Violation(s) Noted
689758 Primary Facility 1999-06-23 Routine/Complete Inspection Violation(s) Noted
689801 Primary Facility 1999-07-27 Routine/Complete Inspection No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
687235 106524 02/22/1996 1996-02-22 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
689673 113754 04/29/1999 1999-04-29 201TAG - Failure to install, in a permanent manner, the permit number on a completed well Administrative
689673 113755 04/29/1999 1999-04-29 78.64 - Inadequate containment of oil tank Administrative
689680 113842 05/19/1999 1999-05-19 201TAG - Failure to install, in a permanent manner, the permit number on a completed well Administrative
689680 113843 05/19/1999 1999-05-19 78.64 - Inadequate containment of oil tank Administrative
689758 113904 06/23/1999 1999-06-23 201TAG - Failure to install, in a permanent manner, the permit number on a completed well Administrative
689758 113905 06/23/1999 1999-06-23 78.64 - Inadequate containment of oil tank Administrative

For data sources see[7]

References