If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 145: | Line 145: | ||
|- | |- | ||
| 1986 | | 1986 | ||
− | | | + | | [[EDISTO RESOURCES CORP]] |
| style="text-align: right;" | 2.00 | | style="text-align: right;" | 2.00 | ||
| style="text-align: right;" | 1 | | style="text-align: right;" | 1 |
Well ID: 37-049-21706 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.907205,"lon":-80.007107,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Erie | |
Municipality: Le Boeuf Township | |
Operator Name: TIMBERLINE ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: EL DICOLA 2 | |
License Status: PLUGGED & ABANDONED | |
Spud Date: | |
Permit Date: 1981-12-02 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 41.907205 | |
Longitude: -80.007107 |
Date | Event |
---|---|
1981-12-02 | Drilling Completion |
1981-12-02 | New Permit Application |
1981-12-07 | Perforation |
1981-12-09 | Performed Stimulation |
1985-04-18 | NEWLY DRILLED |
2009-07-01 | Drilling Completion |
2010-03-10 | FULLY PLUGGED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
1981-12-09 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1986 | EDISTO RESOURCES CORP | 2.00 | 1 | 0.00 | 0 | 0.00 | 0 |
1991 | ENERGY CORP OF AMER | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]