X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-027-21527"

(Created page with "== Well Details == {{027-21527-Details}} __TOC__ == Well Inspection Data == {{027-21527-inspection}} == Production Data == {{027-21527-production}} == Waste Data == {{027-2152...")
 
m
 
(18 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{{027-21527-Details}}
+
{| class="wikitable welldetails" width="95%"
__TOC__
+
| Well ID: 37-027-21527
== Well Inspection Data ==
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.092317, -77.955786 | width=100% | height=100% }}
{{027-21527-inspection}}
+
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Centre_County,_Pennsylvania|Centre]]
 +
|-
 +
| Municipality: [[Burnside Township,_Centre_County,_Pennsylvania|Burnside Township]]
 +
|-
 +
| Operator Name: [[EXCO RESOURCES PA LLC]]
 +
|-
 +
| Well Pad ID: [[148768]]
 +
|-
 +
| Farm/Lease Name: LITKE UNIT 7H-A
 +
|-
 +
| License Status:
 +
|-
 +
| Spud Date:
 +
|-
 +
| Permit Date: 2009-07-28
 +
|-
 +
| Well Type: GAS
 +
|-
 +
| Unconventional Well: Y
 +
|-
 +
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: Yes
 +
|-
 +
| Latitude: 41.092317
 +
|-
 +
| Longitude: -77.955786
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2009-07-28
 +
| New Permit Application
 +
|-
 +
| 2009-11-15
 +
| Performed Spud Operation
 +
|-
 +
| 2010-02-06
 +
| Drilling Completion
 +
|-
 +
| 2010-03-03
 +
| Perforation
 +
|-
 +
| 2010-11-15
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 
== Production Data ==
 
== Production Data ==
{{027-21527-production}}
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2009
 +
| [[EXCO RESOURCES PA INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010
 +
| [[EXCO RESOURCES PA INC]]
 +
| style="text-align: right;" | 55,310.00
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011
 +
| [[EXCO RESOURCES PA INC]]
 +
| style="text-align: right;" | 185,583.00
 +
| style="text-align: right;" | 334
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 133,025.00
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 107,605.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 95,624.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 84,086.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 78,127.00
 +
| style="text-align: right;" | 364
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 77,125.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 64,579.00
 +
| style="text-align: right;" | 315
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 91,680.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
{{027-21527-waste}}
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2009
 +
| [[EXCO RESOURCES PA INC]]
 +
| Brine
 +
| style="text-align: right;" | 386.00 Bbl
 +
| Injection Disposal Well
 +
| OH-3795
 +
|-
 +
| 2009
 +
| [[EXCO RESOURCES PA INC]]
 +
| Brine
 +
| style="text-align: right;" | 2,256.00 Bbl
 +
| Injection Disposal Well
 +
| OH-1893,1894,32
 +
|-
 +
| 2009
 +
| [[EXCO RESOURCES PA INC]]
 +
| Drilling
 +
| style="text-align: right;" | 176.00 Bbl
 +
| Injection Disposal Well
 +
| OH-3795
 +
|-
 +
| 2009
 +
| [[EXCO RESOURCES PA INC]]
 +
| Drilling
 +
| style="text-align: right;" | 2,416.00 Bbl
 +
| Injection Disposal Well
 +
| OH-1893,1894,32
 +
|-
 +
| 2009
 +
| [[EXCO RESOURCES PA INC]]
 +
| Drilling
 +
| style="text-align: right;" | 4,464.00 Bbl
 +
| Brine or Industrial Waste Treatment Plt
 +
| PA0101508
 +
|-
 +
| 2009
 +
| [[EXCO RESOURCES PA INC]]
 +
| Drilling
 +
| style="text-align: right;" | 500.00 Bbl
 +
| Brine or Industrial Waste Treatment Plt
 +
| PA0091472
 +
|-
 +
| 2009
 +
| [[EXCO RESOURCES PA INC]]
 +
| Drilling
 +
| style="text-align: right;" | 3,076.00 Bbl
 +
| Other
 +
|
 +
|-
 +
| 2010
 +
| [[EXCO RESOURCES PA INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,257.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PAS2D205BCLE
 +
|-
 +
| 2010
 +
| [[EXCO RESOURCES PA INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 100.00 Bbl
 +
| Injection Disposal Well
 +
| 34-155-23795
 +
|-
 +
| 2010
 +
| [[EXCO RESOURCES PA INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 710.00 Bbl
 +
| IDENTIFY METHOD IN COMMENTS
 +
|
 +
|-
 +
| 2010
 +
| [[EXCO RESOURCES PA INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 179.25 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2010
 +
| [[EXCO RESOURCES PA INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 642.50 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 +
|-
 +
| 2010
 +
| [[EXCO RESOURCES PA INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 229.00 Bbl
 +
| Injection Disposal Well
 +
| 34-155-21893
 +
|-
 +
| 2010
 +
| [[EXCO RESOURCES PA INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 341.90 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0028207
 +
|-
 +
| 2010
 +
| [[EXCO RESOURCES PA INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 1,432.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 301353
 +
|-
 +
| 2010
 +
| [[EXCO RESOURCES PA INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 45.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0095273
 +
|-
 +
| 2010
 +
| [[EXCO RESOURCES PA INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 5,862.15 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
|-
 +
| 2010
 +
| [[EXCO RESOURCES PA INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 5,125.00 Bbl
 +
| Injection Disposal Well
 +
| 34-155-23203
 +
|-
 +
| 2010
 +
| [[EXCO RESOURCES PA INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 185.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2010
 +
| [[EXCO RESOURCES PA INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 573.00 Bbl
 +
| Injection Disposal Well
 +
| 34-155-23795
 +
|-
 +
| 2010
 +
| [[EXCO RESOURCES PA INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 426.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0027057
 +
|-
 +
| 2011
 +
| [[EXCO RESOURCES PA INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,867.54 Bbl
 +
| Injection Disposal Well
 +
| 34-119-27350
 +
|-
 +
| 2011
 +
| [[EXCO RESOURCES PA INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 566.08 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR119
 +
|-
 +
| 2011
 +
| [[EXCO RESOURCES PA INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 402.04 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2011
 +
| [[EXCO RESOURCES PA INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 4,815.02 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PAS2D205BCLE
 +
|-
 +
| 2011
 +
| [[EXCO RESOURCES PA INC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 1,750.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2011
 +
| [[EXCO RESOURCES PA INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 113.67 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
|
 +
|-
 +
| 2011
 +
| [[EXCO RESOURCES PA INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 99.76 Bbl
 +
| Injection Disposal Well
 +
| 34-059-24067
 +
|-
 +
| 2011
 +
| [[EXCO RESOURCES PA INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 60.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0095443
 +
|-
 +
| 2011
 +
| [[EXCO RESOURCES PA INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 215.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0095273
 +
|-
 +
| 2011
 +
| [[EXCO RESOURCES PA INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 111.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 +
|-
 +
| 2012
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 160.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0095273
 +
|-
 +
| 2012
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,061.07 Bbl
 +
| Injection Disposal Well
 +
| PAS2D205BCLE
 +
|-
 +
| 2012
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 97.11 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2012
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 106.56 Bbl
 +
| Injection Disposal Well
 +
| 34-059-24067
 +
|-
 +
| 2012
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 200.34 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
|
 +
|-
 +
| 2012
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,316.40 Bbl
 +
| Injection Disposal Well
 +
| 34-119-27350
 +
|-
 +
| 2013
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 3,401.48 Bbl
 +
| Injection Disposal Well
 +
| PAS2D205BCLE
 +
|-
 +
| 2013
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 104.40 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
|
 +
|-
 +
| 2014
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 3,076.40 Bbl
 +
| Injection Disposal Well
 +
| PAS2D205BCLE
 +
|-
 +
| 2015
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,632.00 Bbl
 +
| Injection Disposal Well
 +
| PAS2D205BCLE
 +
|-
 +
| 2016
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,231.60 Bbl
 +
| Injection Disposal Well
 +
| PAS2D205BCLE
 +
|-
 +
| 2017
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,051.00 Bbl
 +
| Injection Disposal Well
 +
| PAS2D205BCLE
 +
|-
 +
| 2018
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 432.60 Bbl
 +
| Injection Disposal Well
 +
| 34-007-21847
 +
|-
 +
| 2018
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,132.80 Bbl
 +
| Injection Disposal Well
 +
| PAS2D205BCLE
 +
|-
 +
| 2019
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,593.90 Bbl
 +
| Injection Disposal Well
 +
| PAS2D205BCLE
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 1849000
 +
| Primary Facility
 +
| 2009-12-10
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Conducted Inspection with WQS Jessica Miller
 +
|-
 +
| 1850343
 +
| Primary Facility
 +
| 2009-12-10
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| -Well Site ID sign, with E&S control Plan and permit in tube, located at entrance to site. Insp. conducted with WQS Sam Jones, and accompanied by Joe Schwab, Contruction Superintendent of Exco Resources, Inc.
 +
|-
 +
| 1851829
 +
| Primary Facility
 +
| 2009-12-23
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Site ID sign and E&S plan on site
 +
|-
 +
| 1856332
 +
| Primary Facility
 +
| 2010-01-12
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Site ID sign and E&S plan on site
 +
|-
 +
| 1860535
 +
| Primary Facility
 +
| 2010-01-26
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Site ID sign and E&S plan on site
 +
|-
 +
| 1861275
 +
| Primary Facility
 +
| 2010-01-28
 +
| Incident- Response to Accident or Event
 +
| Violation(s) Noted
 +
| Adequate company response rec'vd 5/13/2010, past viol closed.
 +
|-
 +
| 1867042
 +
| Primary Facility
 +
| 2010-03-03
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| -met on-site with Billy Graham, Pipeline superintendent for Exco resources. He proposed increasing the disturbance on the NW corner of the pad by an area approximately 25' W X 100'L.
 +
|-
 +
| 1884441
 +
| Primary Facility
 +
| 2010-05-13
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well is in production with 2 production units, and 4-200 Bbls production water tanks with containment.
 +
|-
 +
| 1917354
 +
| Primary Facility
 +
| 2010-09-08
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2188328
 +
| Primary Facility
 +
| 2013-07-26
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2487356
 +
| Primary Facility
 +
| 2016-05-23
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2491005
 +
| Primary Facility
 +
| 2016-06-07
 +
| Follow-up Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2696543
 +
| Primary Facility
 +
| 2018-02-21
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| The weather is 70 Deg. F, cloudy and windy at time of inspection. Routine inspection of EXCO Resources PA LLC., Litke Pad, Well # 7HA on February 21, 2018. There are 4 producing wells on this pad.
 +
Annular vent cannot be found at the surface. Digital pressure gauge on the top of the production xmas tree reads 74 PSI, casing pressure gauge reads 148 psi. The well is producing through 2-3/8" size production tubing.
 +
0% combustible gas was detected at the well and in the area immediately surrounding the well. No obvious concerns or violations are noted at time of inspection. Wellsite looks neat and well organized.
 +
EXCO Resources, LLC. Representative ¿ Sam Unch, Production Operator.
 +
DEP Representative - Ulyana Trynovich, Oil and Gas Inspector.
 +
|-
 +
| 2705849
 +
| Primary Facility
 +
| 2018-03-09
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Routine site inspection at EXCO Resources LLC Litke 4 Pad on March 9, 2018.
 +
 
 +
The site sign, drilling permits, weekly E&S log, PPC plan, emergency response plan (ERP), and work description of the pad and impoundments were found onsite. Please note that the PPC plan and ERP are dated June 2013 and February 2014 respectively.  The Department recommends that the operator update both plans and place a copy onsite.
 +
 
 +
There are 4 drilled and producing Marcellus wells located on the pad. All well cellars are full of gravel and each well is properly labeled. There are two series of produced fluids tanks stationed in secondary containment on this pad (photo 5). Water within containment was frozen. No signs of leaks from the containment were observed. Each tank was labeled.
 +
 
 +
Part of the well pad has been partially restored. In addition, both impoundments have been fully restored. No E&S issues were observed.
 +
|-
 +
| 2741717
 +
| Primary Facility
 +
| 2018-06-13
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Routine site inspection at EXCO Resources LLC Litke 4 Pad on June 13, 2018.
 +
 
 +
The site sign, drilling permits, weekly E&S log, PPC plan, emergency response plan (ERP), and work description of the pad and impoundments were found onsite. Please note that the PPC plan and ERP are dated June 2013 and February 2014 respectively.  The Department recommends that the operator update both plans and place a copy onsite.
 +
 
 +
There are 4 drilled and producing Marcellus wells located on the pad. All well cellars are full of gravel. There are (2) 400 bbl produced fluids tanks stationed in secondary containment on this pad. Conductivity readings in this containment were 298 uS/cm. In addition, there are (3) 200 bbl produced fluids tanks stationed in secondary containment. Conductivity in this containment was 427 uS/cm. No signs of leaks from either containment were observed. Each tank was properly labeled.
 +
 
 +
Part of the well pad has been partially restored. In addition, both impoundments have been fully restored. No E&S issues
 +
|-
 +
| 2852094
 +
| Primary Facility
 +
| 2019-03-12
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Department representative Sue Herzing conducted a routine site inspection at EXCO Resources PA LLC Litke Pad 4 on March 12, 2019.
 +
 
 +
There are 4 drilled and producing Marcellus wells located on the pad. All well cellars are full of gravel and/or snow. There are (2) 400 bbl produced fluids tanks stationed in secondary containment. In addition, there are (3) 200 bbl produced fluids tanks stationed in a separate secondary containment. Frozen water was observed in both sets of produced fluids secondary containment. No signs of leaks from either containment were observed. Each produced fluids tank was labeled.
 +
 
 +
Part of the well pad has been partially restored. In addition, both impoundments (2 & 3 MG) have been fully restored and are well vegetated. No E&S issues were observed. The well pad and surrounding areas are partially snow covered.
 +
 
 +
No violations noted.
 +
|-
 +
|}
 +
==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
| 1861275
 +
| 580776
 +
| 01/28/2010
 +
| 2010-01-28
 +
| 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt
 +
| Environmental Health & Safety
 +
| Adequate company response rec'vd 5/13/2010, past viol closed. Boring mud breakout with approximately 5 gals of boring mud entering Little Sandy Run during a boring frac out
 +
|-
 +
|}
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 12:39, 2 June 2020

Well Details

Well ID: 37-027-21527
Loading map...
Country: United States
State: Pennsylvania
County: Centre
Municipality: Burnside Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID: 148768
Farm/Lease Name: LITKE UNIT 7H-A
License Status:
Spud Date:
Permit Date: 2009-07-28
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.092317
Longitude: -77.955786

For data sources see[1][2][3]

Well History

Date Event
2009-07-28 New Permit Application
2009-11-15 Performed Spud Operation
2010-02-06 Drilling Completion
2010-03-03 Perforation
2010-11-15 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 EXCO RESOURCES PA INC 0.00 0 0.00 0 0.00 0
2010 EXCO RESOURCES PA INC 55,310.00 60 0.00 0 0.00 0
2011 EXCO RESOURCES PA INC 185,583.00 334 0.00 0 0.00 0
2012 EXCO RESOURCES PA LLC 133,025.00 366 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 107,605.00 365 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 95,624.00 365 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 84,086.00 365 0.00 0 0.00 0
2016 EXCO RESOURCES PA LLC 78,127.00 364 0.00 0 0.00 0
2017 EXCO RESOURCES PA LLC 77,125.00 365 0.00 0 0.00 0
2018 EXCO RESOURCES PA LLC 64,579.00 315 0.00 0 0.00 0
2019 EXCO RESOURCES PA LLC 91,680.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 EXCO RESOURCES PA INC Brine 386.00 Bbl Injection Disposal Well OH-3795
2009 EXCO RESOURCES PA INC Brine 2,256.00 Bbl Injection Disposal Well OH-1893,1894,32
2009 EXCO RESOURCES PA INC Drilling 176.00 Bbl Injection Disposal Well OH-3795
2009 EXCO RESOURCES PA INC Drilling 2,416.00 Bbl Injection Disposal Well OH-1893,1894,32
2009 EXCO RESOURCES PA INC Drilling 4,464.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2009 EXCO RESOURCES PA INC Drilling 500.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2009 EXCO RESOURCES PA INC Drilling 3,076.00 Bbl Other
2010 EXCO RESOURCES PA INC Produced Fluid 1,257.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAS2D205BCLE
2010 EXCO RESOURCES PA INC Produced Fluid 100.00 Bbl Injection Disposal Well 34-155-23795
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 710.00 Bbl IDENTIFY METHOD IN COMMENTS
2010 EXCO RESOURCES PA INC Produced Fluid 179.25 Bbl REUSE OTHER THAN ROAD SPREADING
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 642.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 229.00 Bbl Injection Disposal Well 34-155-21893
2010 EXCO RESOURCES PA INC Produced Fluid 341.90 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028207
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 1,432.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 45.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 5,862.15 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 5,125.00 Bbl Injection Disposal Well 34-155-23203
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 185.00 Bbl REUSE OTHER THAN ROAD SPREADING
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 573.00 Bbl Injection Disposal Well 34-155-23795
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 426.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0027057
2011 EXCO RESOURCES PA INC Produced Fluid 1,867.54 Bbl Injection Disposal Well 34-119-27350
2011 EXCO RESOURCES PA INC Produced Fluid 566.08 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011 EXCO RESOURCES PA INC Produced Fluid 402.04 Bbl REUSE OTHER THAN ROAD SPREADING
2011 EXCO RESOURCES PA INC Produced Fluid 4,815.02 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAS2D205BCLE
2011 EXCO RESOURCES PA INC Fracing Fluid Waste 1,750.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 EXCO RESOURCES PA INC Produced Fluid 113.67 Bbl STORAGE PENDING DISPOSAL OR REUSE
2011 EXCO RESOURCES PA INC Produced Fluid 99.76 Bbl Injection Disposal Well 34-059-24067
2011 EXCO RESOURCES PA INC Produced Fluid 60.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 EXCO RESOURCES PA INC Produced Fluid 215.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 EXCO RESOURCES PA INC Produced Fluid 111.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2012 EXCO RESOURCES PA LLC Produced Fluid 160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 EXCO RESOURCES PA LLC Produced Fluid 2,061.07 Bbl Injection Disposal Well PAS2D205BCLE
2012 EXCO RESOURCES PA LLC Produced Fluid 97.11 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EXCO RESOURCES PA LLC Produced Fluid 106.56 Bbl Injection Disposal Well 34-059-24067
2012 EXCO RESOURCES PA LLC Produced Fluid 200.34 Bbl STORAGE PENDING DISPOSAL OR REUSE
2012 EXCO RESOURCES PA LLC Produced Fluid 2,316.40 Bbl Injection Disposal Well 34-119-27350
2013 EXCO RESOURCES PA LLC Produced Fluid 3,401.48 Bbl Injection Disposal Well PAS2D205BCLE
2013 EXCO RESOURCES PA LLC Produced Fluid 104.40 Bbl STORAGE PENDING DISPOSAL OR REUSE
2014 EXCO RESOURCES PA LLC Produced Fluid 3,076.40 Bbl Injection Disposal Well PAS2D205BCLE
2015 EXCO RESOURCES PA LLC Produced Fluid 2,632.00 Bbl Injection Disposal Well PAS2D205BCLE
2016 EXCO RESOURCES PA LLC Produced Fluid 2,231.60 Bbl Injection Disposal Well PAS2D205BCLE
2017 EXCO RESOURCES PA LLC Produced Fluid 2,051.00 Bbl Injection Disposal Well PAS2D205BCLE
2018 EXCO RESOURCES PA LLC Produced Fluid 432.60 Bbl Injection Disposal Well 34-007-21847
2018 EXCO RESOURCES PA LLC Produced Fluid 1,132.80 Bbl Injection Disposal Well PAS2D205BCLE
2019 EXCO RESOURCES PA LLC Produced Fluid 1,593.90 Bbl Injection Disposal Well PAS2D205BCLE

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1849000 Primary Facility 2009-12-10 Drilling/Alteration No Violations Noted Conducted Inspection with WQS Jessica Miller
1850343 Primary Facility 2009-12-10 Drilling/Alteration No Violations Noted -Well Site ID sign, with E&S control Plan and permit in tube, located at entrance to site. Insp. conducted with WQS Sam Jones, and accompanied by Joe Schwab, Contruction Superintendent of Exco Resources, Inc.
1851829 Primary Facility 2009-12-23 Drilling/Alteration No Violations Noted Site ID sign and E&S plan on site
1856332 Primary Facility 2010-01-12 Drilling/Alteration No Violations Noted Site ID sign and E&S plan on site
1860535 Primary Facility 2010-01-26 Drilling/Alteration No Violations Noted Site ID sign and E&S plan on site
1861275 Primary Facility 2010-01-28 Incident- Response to Accident or Event Violation(s) Noted Adequate company response rec'vd 5/13/2010, past viol closed.
1867042 Primary Facility 2010-03-03 Routine/Complete Inspection No Violations Noted -met on-site with Billy Graham, Pipeline superintendent for Exco resources. He proposed increasing the disturbance on the NW corner of the pad by an area approximately 25' W X 100'L.
1884441 Primary Facility 2010-05-13 Routine/Complete Inspection No Violations Noted Well is in production with 2 production units, and 4-200 Bbls production water tanks with containment.
1917354 Primary Facility 2010-09-08 Routine/Complete Inspection No Violations Noted
2188328 Primary Facility 2013-07-26 Routine/Complete Inspection No Violations Noted
2487356 Primary Facility 2016-05-23 Routine/Complete Inspection No Violations Noted
2491005 Primary Facility 2016-06-07 Follow-up Inspection No Violations Noted
2696543 Primary Facility 2018-02-21 Routine/Complete Inspection No Violations Noted The weather is 70 Deg. F, cloudy and windy at time of inspection. Routine inspection of EXCO Resources PA LLC., Litke Pad, Well # 7HA on February 21, 2018. There are 4 producing wells on this pad.

Annular vent cannot be found at the surface. Digital pressure gauge on the top of the production xmas tree reads 74 PSI, casing pressure gauge reads 148 psi. The well is producing through 2-3/8" size production tubing. 0% combustible gas was detected at the well and in the area immediately surrounding the well. No obvious concerns or violations are noted at time of inspection. Wellsite looks neat and well organized. EXCO Resources, LLC. Representative ¿ Sam Unch, Production Operator. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector.

2705849 Primary Facility 2018-03-09 Routine/Complete Inspection No Violations Noted Routine site inspection at EXCO Resources LLC Litke 4 Pad on March 9, 2018.

The site sign, drilling permits, weekly E&S log, PPC plan, emergency response plan (ERP), and work description of the pad and impoundments were found onsite. Please note that the PPC plan and ERP are dated June 2013 and February 2014 respectively. The Department recommends that the operator update both plans and place a copy onsite.

There are 4 drilled and producing Marcellus wells located on the pad. All well cellars are full of gravel and each well is properly labeled. There are two series of produced fluids tanks stationed in secondary containment on this pad (photo 5). Water within containment was frozen. No signs of leaks from the containment were observed. Each tank was labeled.

Part of the well pad has been partially restored. In addition, both impoundments have been fully restored. No E&S issues were observed.

2741717 Primary Facility 2018-06-13 Routine/Complete Inspection No Violations Noted Routine site inspection at EXCO Resources LLC Litke 4 Pad on June 13, 2018.

The site sign, drilling permits, weekly E&S log, PPC plan, emergency response plan (ERP), and work description of the pad and impoundments were found onsite. Please note that the PPC plan and ERP are dated June 2013 and February 2014 respectively. The Department recommends that the operator update both plans and place a copy onsite.

There are 4 drilled and producing Marcellus wells located on the pad. All well cellars are full of gravel. There are (2) 400 bbl produced fluids tanks stationed in secondary containment on this pad. Conductivity readings in this containment were 298 uS/cm. In addition, there are (3) 200 bbl produced fluids tanks stationed in secondary containment. Conductivity in this containment was 427 uS/cm. No signs of leaks from either containment were observed. Each tank was properly labeled.

Part of the well pad has been partially restored. In addition, both impoundments have been fully restored. No E&S issues

2852094 Primary Facility 2019-03-12 Routine/Complete Inspection No Violations Noted Department representative Sue Herzing conducted a routine site inspection at EXCO Resources PA LLC Litke Pad 4 on March 12, 2019.

There are 4 drilled and producing Marcellus wells located on the pad. All well cellars are full of gravel and/or snow. There are (2) 400 bbl produced fluids tanks stationed in secondary containment. In addition, there are (3) 200 bbl produced fluids tanks stationed in a separate secondary containment. Frozen water was observed in both sets of produced fluids secondary containment. No signs of leaks from either containment were observed. Each produced fluids tank was labeled.

Part of the well pad has been partially restored. In addition, both impoundments (2 & 3 MG) have been fully restored and are well vegetated. No E&S issues were observed. The well pad and surrounding areas are partially snow covered.

No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1861275 580776 01/28/2010 2010-01-28 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt Environmental Health & Safety Adequate company response rec'vd 5/13/2010, past viol closed. Boring mud breakout with approximately 5 gals of boring mud entering Little Sandy Run during a boring frac out

For data sources see[7]

References