X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-25570"

m
m
 
(13 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
| Well ID: 42-129-25570
+
| Well ID: 37-129-25570
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.327894, -79.488102 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.327894, -79.488103 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Westmoreland_County,_Pennsylvania|Westmoreland]]
 
|-
 
|-
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
+
| Municipality: [[Hempfield Township,_Westmoreland_County,_Pennsylvania|Hempfield Township]]
 
|-
 
|-
| Municipality: [[Hempfield Township, Westmoreland County, Pennsylvania|Hempfield Township]]
+
| Operator Name: [[MIEKA LLC]]
 
|-
 
|-
| Operator Name: [[MIEKA LLC|MIEKA LLC]]
+
| Well Pad ID: [[146823]]
 
|-
 
|-
| Farm/Lease Name: SCHIMIZZI S&M 1
+
| Farm/Lease Name: SCHIMIZZI
 
|-
 
|-
| First Permit Date: 2004-12-06
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2010-07-19
+
| Spud Date:  
 
|-
 
|-
| Spud Date: 2005-04-26
+
| Permit Date: 2004-12-06
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: No
+
| Unconventional Well: Y
 
|-
 
|-
| Producing: Yes
+
| Configuration: Vertical Well
 
|-
 
|-
| Violations: 1
+
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 40.327894
 
| Latitude: 40.327894
 
|-
 
|-
| Longitude: -79.488102
+
| Longitude: -79.488103
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2004-12-06
 +
| New Permit Application
 +
|-
 +
| 2005-04-26
 +
| Performed Spud Operation
 +
|-
 +
| 2010-07-19
 +
| New Permit Application
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Well Inspection Data ==
+
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2006
 +
| [[MID EAST OIL CO]]
 +
| style="text-align: right;" | 2,017.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010
 +
| [[MIEKA LLC]]
 +
| style="text-align: right;" | 1,261.00
 +
| style="text-align: right;" | 10
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011
 +
| [[MIEKA LLC]]
 +
| style="text-align: right;" | 17,294.00
 +
| style="text-align: right;" | 320
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[MIEKA LLC]]
 +
| style="text-align: right;" | 7,747.00
 +
| style="text-align: right;" | 161
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[MIEKA LLC]]
 +
| style="text-align: right;" | 16,771.00
 +
| style="text-align: right;" | 363
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[MIEKA LLC]]
 +
| style="text-align: right;" | 9,742.00
 +
| style="text-align: right;" | 361
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2011
 +
| [[MIEKA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 320.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| UIC 45
 +
|-
 +
| 2011
 +
| [[MIEKA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 896.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0095273
 +
|-
 +
| 2012
 +
| [[MIEKA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 0.01 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23795
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 1445311
 
| 1445311
 +
| Primary Facility
 
| 2005-04-29
 
| 2005-04-29
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Well spudded by Northeast,Pit ok,E&S ok
 
| Well spudded by Northeast,Pit ok,E&S ok
|
 
|-
 
 
|-
 
|-
 
| 1906400
 
| 1906400
 +
| Primary Facility
 
| 2010-08-11
 
| 2010-08-11
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| well in place.. prep'ing for drilling deeper...site preparation activities...pit dug...berms in place...e&s bmp's in place
 
| well in place.. prep'ing for drilling deeper...site preparation activities...pit dug...berms in place...e&s bmp's in place
|
 
|-
 
 
|-
 
|-
 
| 1910333
 
| 1910333
 +
| Primary Facility
 
| 2010-09-02
 
| 2010-09-02
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Drilling was ongoing at the time of the inspection.  Below grade pit located onsite and it had more than te required two feet of lined freeboard.  E&S controls had been implemented as outlined in the E&S plan.  Observed no accelerated erosion & sedimentation in relation to the access road or well-site.
 
| Drilling was ongoing at the time of the inspection.  Below grade pit located onsite and it had more than te required two feet of lined freeboard.  E&S controls had been implemented as outlined in the E&S plan.  Observed no accelerated erosion & sedimentation in relation to the access road or well-site.
|
 
|-
 
 
|-
 
|-
 
| 1915240
 
| 1915240
 +
| Primary Facility
 
| 2010-09-23
 
| 2010-09-23
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Site inspection was conducted just after drilling completed. Signage and E&S plan on site and reviewed. Drilling pit in place and maintains required freeboard but should be closely monitored and/or pumped prior to a significant storm event to prevent any release.  Perimeter E&S BMP¿s (silt fence) in place and functioning adequately. Access road shows no issues. No accelerated E&S issues noted after rain event of  9/21. *Site must be restored within 9 months of drill completion.
 
| Site inspection was conducted just after drilling completed. Signage and E&S plan on site and reviewed. Drilling pit in place and maintains required freeboard but should be closely monitored and/or pumped prior to a significant storm event to prevent any release.  Perimeter E&S BMP¿s (silt fence) in place and functioning adequately. Access road shows no issues. No accelerated E&S issues noted after rain event of  9/21. *Site must be restored within 9 months of drill completion.
|
 
|-
 
 
|-
 
|-
 
| 1965496
 
| 1965496
 +
| Primary Facility
 
| 2011-04-01
 
| 2011-04-01
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  Site Restored ; Annulus Open; 2 - 100 Bbl tanks on Location
 
|  Site Restored ; Annulus Open; 2 - 100 Bbl tanks on Location
|
 
|-
 
 
|-
 
|-
 
| 2040656
 
| 2040656
 +
| Primary Facility
 
| 2012-02-06
 
| 2012-02-06
 +
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
 
|  
 
|  
| 631451
 
|-
 
 
|-
 
|-
 
| 2068813
 
| 2068813
 +
| Primary Facility
 
| 2012-05-17
 
| 2012-05-17
 +
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Drilling was completedon 09/09/10 as shown in the requested documenation received from the operator on 02/24/12.  Well appeared to be equipped for production at the time of the inspection.  Brine tanks located onsite and they appeared to be in sound condition.  Site was in the same condition as it was found during the 02/06/12 inspection.  Frac impoundment was onsite and it had more than the required two feet of lined freeboard.  Site had not been regraded.
 
| Drilling was completedon 09/09/10 as shown in the requested documenation received from the operator on 02/24/12.  Well appeared to be equipped for production at the time of the inspection.  Brine tanks located onsite and they appeared to be in sound condition.  Site was in the same condition as it was found during the 02/06/12 inspection.  Frac impoundment was onsite and it had more than the required two feet of lined freeboard.  Site had not been regraded.
|
 
|-
 
 
|-
 
|-
 
| 2075590
 
| 2075590
 +
| Primary Facility
 
| 2012-06-13
 
| 2012-06-13
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
|  
 
|  
|
 
|-
 
 
|-
 
|-
 
| 2103391
 
| 2103391
 +
| Primary Facility
 
| 2012-09-27
 
| 2012-09-27
 +
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
 
| Well appeared to be equipped for production.  Drilling was completed on 09/09/10 according to requested documentation provided by the operator.  Frac impoundment which ad been located onsite had been removed and the area had been regraded.  This portion of the site required final seeding & mulching.  The operator should also continue to monitor the site to insure that 70% uniform vegetative cover is achieved.
 
| Well appeared to be equipped for production.  Drilling was completed on 09/09/10 according to requested documentation provided by the operator.  Frac impoundment which ad been located onsite had been removed and the area had been regraded.  This portion of the site required final seeding & mulching.  The operator should also continue to monitor the site to insure that 70% uniform vegetative cover is achieved.
|
 
 
|-
 
|-
|}
+
| 2527178
== Production Data ==
+
| Primary Facility
{| class="wikitable sortable" width="95%"
+
| 2016-10-06
!scope="col" | PERIOD
+
| Routine/Complete Inspection
!scope="col" | GAS QUANTITY
+
| No Violations Noted
!scope="col" | GAS PRODUCTION DAYS
+
| Well tagged with one hard to read ID# tag on foil and a second incorrect well ID# from another county due to well head valve equipment which was used from another well. Contacted operator to have new more legible well ID# placed on well and second incorrect number removed. Well on-annulus shut-equipment-tanks ok.
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-2
+
| 2661147
| style="text-align:right;" | 4596.0
+
| Primary Facility
| style="text-align:right;" | 70.0
+
| 2017-11-16
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| At the time of inspection well equipped for production. Two brine tanks within earthen dike appear to be structurally sound. No E&S issues.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2704777
 +
| Primary Facility
 +
| 2018-03-13
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection well equipped for production. Two brine tanks located within earthen dike. Brine tanks show heavy rusting and appear to be structurally compromised as indicated by the presence of holes on the upper 2/3 of tank. No active leaks or evidence of old leaks observed. Department recommends Operator address structural integrity of brine tanks. No E&S issues.
 
|-
 
|-
| 2012-1
+
|}
| style="text-align:right;" | 3151.0
+
==== Violations Commited ====
| style="text-align:right;" | 91.0
+
{| class="wikitable sortable" width="95%"
| style="text-align:right;" | 0.0
+
!scope="col" | Inspection ID
| style="text-align:right;" | 0.0
+
!scope="col" | Violation ID
| style="text-align:right;" | 0.0
+
!scope="col" | Violation Date
| style="text-align:right;" | 0.0
+
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 
|-
 
|-
|-
+
| 2040656
| 2011-2
+
| 631451
| style="text-align:right;" | 6225.0
+
| 02/06/2012
| style="text-align:right;" | 184.0
+
| 2012-02-06
| style="text-align:right;" | 0.0
+
| 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production.
| style="text-align:right;" | 0.0
+
| Administrative
| style="text-align:right;" | 0.0
+
| 78.56 Pit located onsite more than 9 months after completion of drilling.
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-1
 
| style="text-align:right;" | 11069.0
 
| style="text-align:right;" | 136.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-2
 
| style="text-align:right;" | 1261.0
 
| style="text-align:right;" | 10.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2006-0
 
| style="text-align:right;" | 2017.0
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
== Waste Data ==
+
==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Violation ID
!scope="col" | TYPE
+
!scope="col" | Penalty ID
!scope="col" | QUANTITY
+
!scope="col" | Penalty Code
!scope="col" | UNITS
+
!scope="col" | Penalty Status
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Penalty Date
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Enforcement Date
!scope="col" | WASTE FACILITY NAME
+
!scope="col" | Penalty Amount
!scope="col" | FACILITY CITY
+
!scope="col" | Amount Collected
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-2
+
| 631451
| PRODUCED FLUID
+
| 280284
| style="text-align:right;" | 0.01
+
| NOV - Notice of Violation
| Bbl
+
| Comply/Closed
| INJECTION DISPOSAL WELL
+
|
| 34-42-155-23795
+
| 2012-09-27
| PANDER #1 (SWIW #15)
+
| style="text-align: right;" |  
| NEWTON FALLS
+
| style="text-align: right;" |  
| OH
 
 
|-
 
|-
|-
+
| 631451
| 2011-1
+
| 309741
| PRODUCED FLUID
+
| CACP - Consent Assessment of Civil Penalty
| style="text-align:right;" | 896.0
+
| Comply/Closed
| Bbl
+
| 2014-04-11
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| 2014-04-11
| PA0095273
+
| style="text-align: right;" | $1,500.00
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
+
| style="text-align: right;" | $1,500.00
| JOSEPHINE
 
| PA
 
|-
 
|-
 
| 2011-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 320.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| UIC 45
 
| RAY PANDER TRUCKING INC
 
| DIAMOND
 
| OH
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 13:53, 2 June 2020

Well Details

Well ID: 37-129-25570
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Hempfield Township
Operator Name: MIEKA LLC
Well Pad ID: 146823
Farm/Lease Name: SCHIMIZZI
License Status:
Spud Date:
Permit Date: 2004-12-06
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.327894
Longitude: -79.488103

For data sources see[1][2][3]

Well History

Date Event
2004-12-06 New Permit Application
2005-04-26 Performed Spud Operation
2010-07-19 New Permit Application

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 MID EAST OIL CO 2,017.00 365 0.00 0 0.00 0
2010 MIEKA LLC 1,261.00 10 0.00 0 0.00 0
2011 MIEKA LLC 17,294.00 320 0.00 0 0.00 0
2012 MIEKA LLC 7,747.00 161 0.00 0 0.00 0
2013 MIEKA LLC 16,771.00 363 0.00 0 0.00 0
2014 MIEKA LLC 9,742.00 361 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 MIEKA LLC Produced Fluid 320.00 Bbl INJECTION DISPOSAL WELL UIC 45
2011 MIEKA LLC Produced Fluid 896.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 MIEKA LLC Produced Fluid 0.01 Bbl INJECTION DISPOSAL WELL 34-155-23795

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1445311 Primary Facility 2005-04-29 Drilling/Alteration No Violations Noted Well spudded by Northeast,Pit ok,E&S ok
1906400 Primary Facility 2010-08-11 Routine/Complete Inspection No Violations Noted well in place.. prep'ing for drilling deeper...site preparation activities...pit dug...berms in place...e&s bmp's in place
1910333 Primary Facility 2010-09-02 Routine/Complete Inspection No Violations Noted Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than te required two feet of lined freeboard. E&S controls had been implemented as outlined in the E&S plan. Observed no accelerated erosion & sedimentation in relation to the access road or well-site.
1915240 Primary Facility 2010-09-23 Routine/Complete Inspection No Violations Noted Site inspection was conducted just after drilling completed. Signage and E&S plan on site and reviewed. Drilling pit in place and maintains required freeboard but should be closely monitored and/or pumped prior to a significant storm event to prevent any release. Perimeter E&S BMP¿s (silt fence) in place and functioning adequately. Access road shows no issues. No accelerated E&S issues noted after rain event of 9/21. *Site must be restored within 9 months of drill completion.
1965496 Primary Facility 2011-04-01 Routine/Complete Inspection No Violations Noted Site Restored ; Annulus Open; 2 - 100 Bbl tanks on Location
2040656 Primary Facility 2012-02-06 Routine/Complete Inspection Violation(s) Noted
2068813 Primary Facility 2012-05-17 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Drilling was completedon 09/09/10 as shown in the requested documenation received from the operator on 02/24/12. Well appeared to be equipped for production at the time of the inspection. Brine tanks located onsite and they appeared to be in sound condition. Site was in the same condition as it was found during the 02/06/12 inspection. Frac impoundment was onsite and it had more than the required two feet of lined freeboard. Site had not been regraded.
2075590 Primary Facility 2012-06-13 Follow-up Inspection Outstanding Violations - No Viols Req'd
2103391 Primary Facility 2012-09-27 Compliance Evaluation No Violations Noted Well appeared to be equipped for production. Drilling was completed on 09/09/10 according to requested documentation provided by the operator. Frac impoundment which ad been located onsite had been removed and the area had been regraded. This portion of the site required final seeding & mulching. The operator should also continue to monitor the site to insure that 70% uniform vegetative cover is achieved.
2527178 Primary Facility 2016-10-06 Routine/Complete Inspection No Violations Noted Well tagged with one hard to read ID# tag on foil and a second incorrect well ID# from another county due to well head valve equipment which was used from another well. Contacted operator to have new more legible well ID# placed on well and second incorrect number removed. Well on-annulus shut-equipment-tanks ok.
2661147 Primary Facility 2017-11-16 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Two brine tanks within earthen dike appear to be structurally sound. No E&S issues.
2704777 Primary Facility 2018-03-13 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Two brine tanks located within earthen dike. Brine tanks show heavy rusting and appear to be structurally compromised as indicated by the presence of holes on the upper 2/3 of tank. No active leaks or evidence of old leaks observed. Department recommends Operator address structural integrity of brine tanks. No E&S issues.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2040656 631451 02/06/2012 2012-02-06 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production. Administrative 78.56 Pit located onsite more than 9 months after completion of drilling.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
631451 280284 NOV - Notice of Violation Comply/Closed 2012-09-27
631451 309741 CACP - Consent Assessment of Civil Penalty Comply/Closed 2014-04-11 2014-04-11 $1,500.00 $1,500.00

For data sources see[7]

References