If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
|||
(16 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
+ | __TOC__ | ||
== Well Details == | == Well Details == | ||
− | {| class="wikitable" width="95%" | + | {| class="wikitable welldetails" width="95%" |
− | | Well ID: 117-21582 | + | | Well ID: 37-117-21582 |
− | | style=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.557839, -77.078958 | width=100% | height=100% }} |
+ | |- | ||
+ | | Country: United States | ||
+ | |- | ||
+ | | State: Pennsylvania | ||
|- | |- | ||
− | | County: [[ | + | | County: [[Tioga_County,_Pennsylvania|Tioga]] |
|- | |- | ||
− | | Municipality: [[Liberty Township, | + | | Municipality: [[Liberty Township,_Tioga_County,_Pennsylvania|Liberty Township]] |
|- | |- | ||
− | | Operator Name: [[ | + | | Operator Name: [[SWEPI LP]] |
+ | |- | ||
+ | | Well Pad ID: | ||
|- | |- | ||
| Farm/Lease Name: LYNN D 719W 2H | | Farm/Lease Name: LYNN D 719W 2H | ||
|- | |- | ||
− | | | + | | License Status: PLUGGED & ABANDONED |
|- | |- | ||
− | | | + | | Spud Date: |
|- | |- | ||
− | | | + | | Permit Date: 2012-08-24 |
|- | |- | ||
− | | | + | | Well Type: GAS |
|- | |- | ||
− | | | + | | Unconventional Well: Y |
|- | |- | ||
− | | | + | | Configuration: Horizontal Well |
|- | |- | ||
− | | | + | | Conservation: No |
|- | |- | ||
− | | Latitude: 41. | + | | Latitude: 41.557839 |
|- | |- | ||
| Longitude: -77.078958 | | Longitude: -77.078958 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2012-08-24 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2012-11-17 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2013-12-18 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2015-03-26 | ||
+ | | FULLY PLUGGED | ||
+ | |- | ||
+ | | 2015-03-26 | ||
+ | | NEWLY DRILLED | ||
|- | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | == | + | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources |
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator Name | ||
+ | !scope="col" | Gas Quantity (mcf) | ||
+ | !scope="col" | Gas Production Days | ||
+ | !scope="col" | Oil Quantity (bbl) | ||
+ | !scope="col" | Oil Production Days | ||
+ | !scope="col" | Water Quantity (bbl) | ||
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[SWEPI LP]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[SWEPI LP]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[SWEPI LP]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator |
− | !scope="col" | | + | !scope="col" | Waste Type |
− | !scope="col" | | + | !scope="col" | Quantity |
− | !scope="col" | | + | !scope="col" | Disposal Method |
+ | !scope="col" | Waste Facility ID | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[SWEPI LP]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 12.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[SWEPI LP]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 40.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123NC006 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[SWEPI LP]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 87.62 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[SWEPI LP]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 238.90 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[SWEPI LP]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 165.86 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[SWEPI LP]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 233.86 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[SWEPI LP]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 65.60 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123NC006 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[SWEPI LP]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 6.98 Bbl | ||
+ | | RESIDUAL WASTE TRANSFER FACILITY | ||
+ | | 7-3115-00193 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[SWEPI LP]] | ||
+ | | Drill Cuttings | ||
+ | | style="text-align: right;" | 618.80 Tons | ||
+ | | LANDFILL | ||
+ | | 301358 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[SWEPI LP]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 31.75 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR119 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[SWEPI LP]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 52.50 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR119 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[SWEPI LP]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 4,698.55 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[SWEPI LP]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 5,585.73 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[SWEPI LP]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 617.02 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[SWEPI LP]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 214.26 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[SWEPI LP]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 51.86 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[SWEPI LP]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,516.79 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[SWEPI LP]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 275.05 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123NC018 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[SWEPI LP]] | ||
+ | | Drill Cuttings | ||
+ | | style="text-align: right;" | 0.02 Tons | ||
+ | | LANDFILL | ||
+ | | 301358 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[SWEPI LP]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 183.37 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123NC018 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[SWEPI LP]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 74.84 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2015 |
− | | | + | | [[SWEPI LP]] |
− | | | + | | Produced Fluid |
− | | | + | | style="text-align: right;" | 1,029.91 Bbl |
− | | | + | | REUSE OTHER THAN ROAD SPREADING |
+ | | | ||
|- | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Waste Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Inspection Category | ||
+ | !scope="col" | Inspection Date | ||
+ | !scope="col" | Inspection Type | ||
+ | !scope="col" | Inspection Result | ||
+ | !scope="col" | Inspection Comments | ||
|- | |- | ||
| 2118704 | | 2118704 | ||
+ | | Primary Facility | ||
| 2012-11-19 | | 2012-11-19 | ||
+ | | Routine/Complete Inspection | ||
| Violation(s) Noted | | Violation(s) Noted | ||
| the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection | | the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection | ||
− | |||
− | |||
|- | |- | ||
| 2128611 | | 2128611 | ||
+ | | Primary Facility | ||
| 2013-01-02 | | 2013-01-02 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
+ | |- | ||
+ | | 2182246 | ||
+ | | Primary Facility | ||
+ | | 2013-07-10 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | | ||
+ | |- | ||
+ | | 2194919 | ||
+ | | Primary Facility | ||
+ | | 2013-08-07 | ||
+ | | Incident- Response to Accident or Event | ||
+ | | No Violations Noted | ||
+ | | 5 bbl spill on 8/3/13. Violations cited against the 1H permit. TLT | ||
+ | |- | ||
+ | | 2207794 | ||
+ | | Primary Facility | ||
+ | | 2013-09-25 | ||
+ | | Follow-up Inspection | ||
+ | | No Violations Noted | ||
+ | | | ||
+ | |- | ||
+ | | 2215562 | ||
+ | | Primary Facility | ||
+ | | 2013-10-22 | ||
+ | | Follow-up Inspection | ||
+ | | No Violations Noted | ||
+ | | | ||
+ | |- | ||
+ | | 2230611 | ||
+ | | Primary Facility | ||
+ | | 2013-12-18 | ||
+ | | Compliance Evaluation | ||
+ | | No Violations Noted | ||
| | | | ||
|- | |- | ||
− | | | + | | 2361295 |
− | + | | Primary Facility | |
− | + | | 2015-04-15 | |
− | + | | Routine/Complete Inspection | |
− | + | | No Violations Noted | |
− | + | | Temporary stabilization generally >70% cover. Temp BMPs in place. One filter sock near access road entrance needs repair. Elevated conductivity in sediment/infiltration basin on north side of pad (2.3 mS/cm). Several stained spots on pad surface. | |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 2732085 |
− | | | + | | Primary Facility |
− | | | + | | 2018-05-14 |
− | | | + | | Routine/Complete Inspection |
− | | | + | | No Violations Noted |
− | + | | At the time of the inspection; containment, tanks, and equipment were installed in anticipation of completions activities on several of the wells onsite. PCSM/Site Restoration plans have been partially implemented. Infiltration basins have been installed but the impervious gravel pad surface has not been reduced as depicted in the approved plans. A 2-year extension on site restoration was approved on 10/20/2017. The Department recommends the PCSM/Site Restoration plans be implemented as permitted by 10/20/2019 or modified to account for the impervious pad surface. | |
− | |||
|- | |- | ||
− | | | + | | 2738677 |
− | + | | Primary Facility | |
− | + | | 2018-06-05 | |
− | + | | Routine/Complete Inspection | |
− | + | | No Violations Noted | |
− | + | | I met Luke Chesner and Levi Lee of Rockdale when I arrived. Coil tubing rig on location drilling out plugs on the 6H prior to moving to the 4H. I noted two areas on the pad that were wet and muddy, one between the coil tubing rig and a pump truck (approximately 5-8 gallons of free water and 30' x 40'), and one between two Baker tank batteries (approximately 10-15 gallons of free water and 30' x 50'). Conductance reading in the former was 9.22 mS/cm, and was over the limit of my meter (19.99mS/cm) in the latter. I pointed both of these areas out to Luke and Levi, and took a grab sample (ID#0939066) from a puddle in the area between the Baker tank batteries. Luke and Levi had a vac truck working in the area between the pump truck and the coil tubing rig almost immediately, and I recommended that they vac the area between the Baker tank batteries and start to remove the affected soil ASAP. The elevated conductance in these areas is an indication of a potential release of produced water or flowback to the | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 2761133 |
− | | | + | | Primary Facility |
− | | | + | | 2018-08-06 |
− | | | + | | Incident- Response to Accident or Event |
− | | | + | | No Violations Noted |
− | | | + | | I arrived on site in response to a spill notification from Rockdale called in at 09:45 on 8/4/18. Regina Logue of Rockdale reported that approximately 2 barrels of potentially contaminated rainwater was released to the pad due to a failed containment, and stated that the release was near the aboveground storage tank. The only person present at the pad when I arrived was Brady Bryington of Principal Enterprise. He pointed out the area of the release, and when I inquired informed me that the AST contained fresh water. I screened the release area, which was at the corner of an upright tank containment, with my soil conductance meter; most readings were in the range of .10-2.2 mS/cm, and the readings dropped dramatically when I pushed the meter 1/4" into the soil. I did locate a spot that seemed to be somewhat removed from the spill area near the center of the upright tank containment that was over limit on my soil meter (greater than 4.0 mS/cm). Towards the rock-lined ditch from the release area, soil con |
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2791181 | ||
+ | | Primary Facility | ||
+ | | 2018-10-17 | ||
+ | | Routine/Partial Inspection | ||
+ | | No Violations Noted | ||
+ | | No activity on site. Due to time constraints, only a partial inspection was performed. Site had a large puddle (50-100 gallons) present in the area of the release documented in the 6/5/18 inspection. Soil conductance readings in this area ranged from .20-.53 mS/cm. Violations remain outstanding. | ||
|- | |- | ||
− | | | + | |} |
− | | | + | ==== Violations Commited ==== |
− | + | {| class="wikitable sortable" width="95%" | |
− | | | + | !scope="col" | Inspection ID |
− | | | + | !scope="col" | Violation ID |
− | | | + | !scope="col" | Violation Date |
− | | | + | !scope="col" | Date Resolved |
− | | | + | !scope="col" | Violation Code |
− | | | + | !scope="col" | Violation Type |
+ | !scope="col" | Violation Comments | ||
|- | |- | ||
+ | | 2118704 | ||
+ | | 654840 | ||
+ | | 11/19/2012 | ||
+ | | 2012-11-19 | ||
+ | | 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling | ||
+ | | Administrative | ||
+ | | the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection | ||
|- | |- | ||
− | | | + | | 2118704 |
− | | | + | | 654841 |
− | | | + | | 11/19/2012 |
− | | | + | | 2012-11-19 |
− | | | + | | 201E - Failure to comply with terms and conditions of permit |
− | | | + | | Environmental Health & Safety |
− | | | + | | the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection |
− | |||
− | |||
|- | |- | ||
|} | |} | ||
+ | <!--==== Penalties Applied ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Penalty ID | ||
+ | !scope="col" | Penalty Code | ||
+ | !scope="col" | Penalty Status | ||
+ | !scope="col" | Penalty Date | ||
+ | !scope="col" | Enforcement Date | ||
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
+ | |- | ||
+ | |}--> | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Compliance Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | ==References== | ||
+ | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Pennsylvania Wells]] |
Well ID: 37-117-21582 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.557839,"lon":-77.078958,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Liberty Township | |
Operator Name: SWEPI LP | |
Well Pad ID: | |
Farm/Lease Name: LYNN D 719W 2H | |
License Status: PLUGGED & ABANDONED | |
Spud Date: | |
Permit Date: 2012-08-24 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.557839 | |
Longitude: -77.078958 |
Date | Event |
---|---|
2012-08-24 | New Permit Application |
2012-11-17 | Performed Spud Operation |
2013-12-18 | Drilling Completion |
2015-03-26 | FULLY PLUGGED |
2015-03-26 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | SWEPI LP | Drilling Fluid Waste | 12.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | SWEPI LP | Produced Fluid | 40.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC006 |
2012 | SWEPI LP | Fracing Fluid Waste | 87.62 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2013 | SWEPI LP | Drilling Fluid Waste | 238.90 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | SWEPI LP | Produced Fluid | 165.86 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | SWEPI LP | Fracing Fluid Waste | 233.86 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | SWEPI LP | Drilling Fluid Waste | 65.60 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC006 |
2013 | SWEPI LP | Fracing Fluid Waste | 6.98 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 7-3115-00193 |
2013 | SWEPI LP | Drill Cuttings | 618.80 Tons | LANDFILL | 301358 |
2013 | SWEPI LP | Produced Fluid | 31.75 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | SWEPI LP | Fracing Fluid Waste | 52.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | SWEPI LP | Produced Fluid | 4,698.55 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | SWEPI LP | Fracing Fluid Waste | 5,585.73 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | SWEPI LP | Drilling Fluid Waste | 617.02 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | SWEPI LP | Fracing Fluid Waste | 214.26 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | SWEPI LP | Fracing Fluid Waste | 51.86 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | SWEPI LP | Produced Fluid | 1,516.79 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | SWEPI LP | Produced Fluid | 275.05 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2014 | SWEPI LP | Drill Cuttings | 0.02 Tons | LANDFILL | 301358 |
2015 | SWEPI LP | Produced Fluid | 183.37 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | SWEPI LP | Fracing Fluid Waste | 74.84 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | SWEPI LP | Produced Fluid | 1,029.91 Bbl | REUSE OTHER THAN ROAD SPREADING |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2118704 | Primary Facility | 2012-11-19 | Routine/Complete Inspection | Violation(s) Noted | the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection |
2128611 | Primary Facility | 2013-01-02 | Routine/Complete Inspection | No Violations Noted | |
2182246 | Primary Facility | 2013-07-10 | Routine/Complete Inspection | No Violations Noted | |
2194919 | Primary Facility | 2013-08-07 | Incident- Response to Accident or Event | No Violations Noted | 5 bbl spill on 8/3/13. Violations cited against the 1H permit. TLT |
2207794 | Primary Facility | 2013-09-25 | Follow-up Inspection | No Violations Noted | |
2215562 | Primary Facility | 2013-10-22 | Follow-up Inspection | No Violations Noted | |
2230611 | Primary Facility | 2013-12-18 | Compliance Evaluation | No Violations Noted | |
2361295 | Primary Facility | 2015-04-15 | Routine/Complete Inspection | No Violations Noted | Temporary stabilization generally >70% cover. Temp BMPs in place. One filter sock near access road entrance needs repair. Elevated conductivity in sediment/infiltration basin on north side of pad (2.3 mS/cm). Several stained spots on pad surface. |
2732085 | Primary Facility | 2018-05-14 | Routine/Complete Inspection | No Violations Noted | At the time of the inspection; containment, tanks, and equipment were installed in anticipation of completions activities on several of the wells onsite. PCSM/Site Restoration plans have been partially implemented. Infiltration basins have been installed but the impervious gravel pad surface has not been reduced as depicted in the approved plans. A 2-year extension on site restoration was approved on 10/20/2017. The Department recommends the PCSM/Site Restoration plans be implemented as permitted by 10/20/2019 or modified to account for the impervious pad surface. |
2738677 | Primary Facility | 2018-06-05 | Routine/Complete Inspection | No Violations Noted | I met Luke Chesner and Levi Lee of Rockdale when I arrived. Coil tubing rig on location drilling out plugs on the 6H prior to moving to the 4H. I noted two areas on the pad that were wet and muddy, one between the coil tubing rig and a pump truck (approximately 5-8 gallons of free water and 30' x 40'), and one between two Baker tank batteries (approximately 10-15 gallons of free water and 30' x 50'). Conductance reading in the former was 9.22 mS/cm, and was over the limit of my meter (19.99mS/cm) in the latter. I pointed both of these areas out to Luke and Levi, and took a grab sample (ID#0939066) from a puddle in the area between the Baker tank batteries. Luke and Levi had a vac truck working in the area between the pump truck and the coil tubing rig almost immediately, and I recommended that they vac the area between the Baker tank batteries and start to remove the affected soil ASAP. The elevated conductance in these areas is an indication of a potential release of produced water or flowback to the |
2761133 | Primary Facility | 2018-08-06 | Incident- Response to Accident or Event | No Violations Noted | I arrived on site in response to a spill notification from Rockdale called in at 09:45 on 8/4/18. Regina Logue of Rockdale reported that approximately 2 barrels of potentially contaminated rainwater was released to the pad due to a failed containment, and stated that the release was near the aboveground storage tank. The only person present at the pad when I arrived was Brady Bryington of Principal Enterprise. He pointed out the area of the release, and when I inquired informed me that the AST contained fresh water. I screened the release area, which was at the corner of an upright tank containment, with my soil conductance meter; most readings were in the range of .10-2.2 mS/cm, and the readings dropped dramatically when I pushed the meter 1/4" into the soil. I did locate a spot that seemed to be somewhat removed from the spill area near the center of the upright tank containment that was over limit on my soil meter (greater than 4.0 mS/cm). Towards the rock-lined ditch from the release area, soil con |
2791181 | Primary Facility | 2018-10-17 | Routine/Partial Inspection | No Violations Noted | No activity on site. Due to time constraints, only a partial inspection was performed. Site had a large puddle (50-100 gallons) present in the area of the release documented in the 6/5/18 inspection. Soil conductance readings in this area ranged from .20-.53 mS/cm. Violations remain outstanding. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2118704 | 654840 | 11/19/2012 | 2012-11-19 | 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling | Administrative | the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection |
2118704 | 654841 | 11/19/2012 | 2012-11-19 | 201E - Failure to comply with terms and conditions of permit | Environmental Health & Safety | the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection |
For data sources see[7]