If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 961: | Line 961: | ||
|- | |- | ||
|} | |} | ||
− | ==== Penalties Applied ==== | + | <!--==== Penalties Applied ==== |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Violation ID | !scope="col" | Violation ID | ||
Line 972: | Line 972: | ||
!scope="col" | Amount Collected | !scope="col" | Amount Collected | ||
|- | |- | ||
− | | | + | |}--> |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
| title =Oil and Gas Compliance Report | | title =Oil and Gas Compliance Report |
Well ID: 37-117-21583 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.557836,"lon":-77.079067,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Liberty Township | |
Operator Name: ROCKDALE MARCELLUS LLC | |
Well Pad ID: 145419 | |
Farm/Lease Name: LYNN D 719W 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-08-24 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.557836 | |
Longitude: -77.079067 |
Date | Event |
---|---|
2012-08-24 | New Permit Application |
2012-11-18 | Performed Spud Operation |
2013-03-11 | New Permit Application |
2013-05-02 | New Permit Application |
2013-05-27 | Drilling Completion |
2013-06-13 | Perforation |
2014-10-24 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-06-18 | 2013-07-30 | 6,738 | 4,770,820 | 419,832 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Plexgel Breaker 10L | Chemplex, L.C. | Breaker | No Hazardous Ingredients | Proprietary | 100 | 0.00169205 | 780 |
EDTA-ACID | Univar | Iron Control | Ethylenediaminetetraacetic acid | 60-00-4 | 99 | 0.000503277 | 232 | |
Water | 7732-18-5 | 1 | 0.00000434 | 2 | ||||
Sand | Operator | Proppant | Silicon Dioxide | 14808-60-7 | 100 | 13.0448 | 6,013,380.0 | |
15% Hydrochloric Acid | Reagent | Scale Dissolver | 36% Hydrochloric Acid | 7647-01-0 | 15 | 0.0743851 | 34290 | |
Water | 7732-18-5 | 85 | 0.421514 | 194309 | ||||
Water | Operator | Base Carrier Fluid | Water | 7732-18-5 | 100 | 86.3133 | 39,788,700.0 | |
MSI-7 | National Petrochem | Scale Inhibitor | Hydrogen Chloride | 7647-01-0 | 100 | 0.00882686 | 4069 | |
FE-4 | Chemplex, L.C. | Iron Control Additive | Water | 7732-18-5 | 55 | 0.00095449 | 440 | |
Citric Acid Anhydrous | 77-92-9 | 55 | 0.00095449 | 440 | ||||
FR900 | Nalco | Friction Reducer | Proprietary | Proprietary | 100 | 0.0790752 | 36452 | |
Petro-Flo | Bio-Cide International, Inc | Biocide | Sodium Chloride | 7647-14-5 | 1 | 0.000141004 | 65 | |
Sodium Carbonate | 497-19-8 | 2 | 0.000282008 | 130 | ||||
Sodium Chlorite | 7758-19-2 | 8.35 | 0.00117576 | 542 | ||||
Sodium Hydroxide | 1310-73-2 | 1 | 0.000141004 | 65 | ||||
I-22 | Nalco | Corrosion Inhibitor | Methanol | 67-56-1 | 5 | 0.00008894 | 41 | |
Cyclic alkanes | Proprietary | 5 | 0.00008894 | 41 | ||||
Quaternary ammonium compound | Proprietary | 5 | 0.00008894 | 41 | ||||
Quaternary ammonium compound | Proprietary | 30 | 0.000531477 | 245 | ||||
Isopropanol | 67-63-0 | 10 | 0.000177882 | 82 | ||||
2-Mercaptoethyl Alcohol | 60-24-2 | 5 | 0.00008894 | 41 | ||||
Oxyalkylated Fatty Acid Derivative | Proprietary | 30 | 0.000531477 | 245 | ||||
Formic Acid | 64-18-6 | 60 | 0.00106512 | 491 | ||||
Aromatic aldehyde | Proprietary | 30 | 0.000531477 | 245 | ||||
Plexgel 907 | Chemplex, L.C. | Gellant | Guar Gum | 9000-30-0 | 100 | 0.0188165 | 8674 | |
Bio-Clear 5000 | Clearwater International LLC | Biocide | Proprietary | Proprietart | 95 | 0.0184867 | 8522 | |
2,2-dibromo-3-nitril oprop ionam ide | 10222-01-2 | 5 | 0.000974014 | 449 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | SWEPI LP | 552,695.73 | 118 | 0.00 | 0 | 0.00 | 0 |
2014 | SWEPI LP | 1,025,494.72 | 363 | 0.00 | 0 | 0.00 | 0 |
2015 | SWEPI LP | 699,845.28 | 358 | 0.00 | 0 | 0.00 | 0 |
2016 | SWEPI LP | 547,857.99 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | SWEPI LP | 455,795.80 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | ROCKDALE MARCELLUS LLC | 334,408.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ROCKDALE MARCELLUS LLC | 195,209.17 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | SWEPI LP | Drill Cuttings | 1,029.24 Tons | LANDFILL | 301358 |
2012 | SWEPI LP | Fracing Fluid Waste | 87.62 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | SWEPI LP | Produced Fluid | 40.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC006 |
2012 | SWEPI LP | Drilling Fluid Waste | 12.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2013 | SWEPI LP | Drilling Fluid Waste | 65.60 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC006 |
2013 | SWEPI LP | Produced Fluid | 4,698.55 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | SWEPI LP | Fracing Fluid Waste | 5,585.73 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | SWEPI LP | Produced Fluid | 31.75 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | SWEPI LP | Produced Fluid | 165.86 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | SWEPI LP | Drill Cuttings | 618.80 Tons | LANDFILL | 301358 |
2013 | SWEPI LP | Fracing Fluid Waste | 52.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | SWEPI LP | Fracing Fluid Waste | 233.86 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | SWEPI LP | Drilling Fluid Waste | 617.02 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | SWEPI LP | Drilling Fluid Waste | 238.90 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | SWEPI LP | Fracing Fluid Waste | 6.98 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 7-3115-00193 |
2014 | SWEPI LP | Fracing Fluid Waste | 51.86 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | SWEPI LP | Produced Fluid | 7,805.73 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | SWEPI LP | Produced Fluid | 275.05 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2014 | SWEPI LP | Drill Cuttings | 0.02 Tons | LANDFILL | 301358 |
2014 | SWEPI LP | Fracing Fluid Waste | 214.26 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | SWEPI LP | Fracing Fluid Waste | 74.84 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | SWEPI LP | Produced Fluid | 30.23 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | SWEPI LP | Produced Fluid | 684.30 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | SWEPI LP | Produced Fluid | 1,474.60 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SWEPI LP | Produced Fluid | 1,002.02 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | SWEPI LP | Produced Fluid | 1,596.26 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SWEPI LP | Synthetic Liner Materials | 0.26 Tons | LANDFILL | 301358 |
2017 | SWEPI LP | Produced Fluid | 325.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2017 | SWEPI LP | Produced Fluid | 983.32 Bbl | REUSE (AT WELL PAD) | |
2017 | SWEPI LP | Waste Water Treatment Sludge | 1.33 Tons | STORAGE PENDING DISPOSAL OR REUSE | PA-0678 |
2017 | SWEPI LP | Produced Fluid | 89.23 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | SWEPI LP | Waste Water Treatment Sludge | 2.06 Tons | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | SWEPI LP | Produced Fluid | 33.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | ROCKDALE MARCELLUS LLC | Produced Fluid | 1,328.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | ROCKDALE MARCELLUS LLC | Soil Contaminated by Oil | 31.05 Tons | LANDFILL | 301358 |
2018 | ROCKDALE MARCELLUS LLC | Other Oil & Gas Wastes | 127.80 Bbl | REUSE (AT WELL PAD) | |
2018 | ROCKDALE MARCELLUS LLC | Produced Fluid | 14.06 Tons | LANDFILL | 301358 |
2018 | ROCKDALE MARCELLUS LLC | Produced Fluid | 812.67 Bbl | REUSE (AT WELL PAD) | |
2018 | ROCKDALE MARCELLUS LLC | Synthetic Liner Materials | 8.26 Tons | LANDFILL | 301358 |
2018 | ROCKDALE MARCELLUS LLC | Soil Contaminated by Oil & Gas Related Spills | 31.05 Tons | LANDFILL | 301358 |
2018 | ROCKDALE MARCELLUS LLC | Produced Fluid | 982.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | ROCKDALE MARCELLUS LLC | Other Oil & Gas Wastes | 83.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | ROCKDALE MARCELLUS LLC | Produced Fluid | 309.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2019 | ROCKDALE MARCELLUS LLC | Produced Fluid | 1,312.28 Bbl | STORAGE PENDING DISPOSAL OR REUSE | WMGR123NC036 |
2019 | ROCKDALE MARCELLUS LLC | Synthetic Liner Materials | 15.78 Tons | LANDFILL | 301358 |
2019 | ROCKDALE MARCELLUS LLC | Other Oil & Gas Wastes | 24.60 Bbl | STORAGE PENDING DISPOSAL OR REUSE | WMGR123NC036 |
2019 | ROCKDALE MARCELLUS LLC | Other Oil & Gas Wastes | 438.67 Bbl | REUSE (AT WELL PAD) | |
2019 | ROCKDALE MARCELLUS LLC | Produced Fluid | 1,062.20 Bbl | REUSE (AT WELL PAD) | |
2019 | ROCKDALE MARCELLUS LLC | Soil Contaminated by Oil | 1.92 Tons | LANDFILL | 301358 |
2019 | ROCKDALE MARCELLUS LLC | Soil Contaminated by Oil & Gas Related Spills | 1.92 Tons | LANDFILL | 301358 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2118705 | Primary Facility | 2012-11-19 | Routine/Complete Inspection | Violation(s) Noted | the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection |
2128609 | Primary Facility | 2013-01-02 | Routine/Complete Inspection | No Violations Noted | |
2182247 | Primary Facility | 2013-07-10 | Routine/Complete Inspection | No Violations Noted | |
2194920 | Primary Facility | 2013-08-07 | Incident- Response to Accident or Event | No Violations Noted | 5 bbl spill on 8/3/13. Violations cited against the 1H permit. TLT |
2207795 | Primary Facility | 2013-09-25 | Follow-up Inspection | No Violations Noted | |
2215563 | Primary Facility | 2013-10-22 | Follow-up Inspection | No Violations Noted | |
2230612 | Primary Facility | 2013-12-18 | Compliance Evaluation | No Violations Noted | |
2265776 | Primary Facility | 2014-04-23 | Routine/Complete Inspection | No Violations Noted | |
2361296 | Primary Facility | 2015-04-15 | Routine/Complete Inspection | No Violations Noted | Temporary stabilization generally >70% cover. Temp BMPs in place. One filter sock near access road entrance needs repair. Elevated conductivity in sediment/infiltration basin on north side of pad (2.3 mS/cm). Several stained spots on pad surface. |
2496423 | Primary Facility | 2016-06-27 | Routine/Complete Inspection | No Violations Noted | Routine inspection to assess overall site conditions. No SWEPI representatives were present.
Vegetative cover on site is greater than 70%. No evidence of accelerated erosion or sedimentation was observed. Per § 3216(c) of the 2012 Oil and Gas Act (58 Pa.C.S. §3216(c)), site restoration is required to occur within 9 months of completion of well drilling, unless an extension request is filed with, and approved by the Department. A restoration extension request was approved by the Department on 04/09/2015, which extends the restoration deadline until 04/09/2017. No violations were cited during this inspection. |
2543586 | Primary Facility | 2016-12-08 | Routine/Complete Inspection | No Violations Noted | Routine inspection to assess overall site conditions. No SWEPI representatives were present.
Vegetative cover on site is greater than 70%. Temporary erosion and sediment control BMPs have been removed. No evidence of accelerated erosion or sedimentation was observed. A restoration extension request was approved by the Department on 04/09/2015, which extends the restoration deadline until 04/09/2017. The Erosion and Sediment Control General Permit for the site expires on 05/01/2017. No violations were cited during this inspection. |
2717063 | Primary Facility | 2018-04-11 | Routine/Complete Inspection | No Violations Noted | Weather was 33° and sunny at time of inspection. Thrre were no Rockdale representatives on location at time of inspection. Well had one analog pressure gauge attached above the swab valve. The pressure gauge attached above the swab valve read approximately 250 psi at time of inspection. There were three annulus vents plumbed to surface. Unable to determine the origin point of each individual annulus vent due to the cellar being full of gravel. Annulus vents were 2", 1 1/2" and 1". The 2" vent had 30% methane by volume detected. No combustible gas was detected on the other 2 vents at time of inspection. No violations noted at time of inspection. |
2732087 | Primary Facility | 2018-05-14 | Routine/Complete Inspection | No Violations Noted | At the time of the inspection; containment, tanks, and equipment were installed in anticipation of completions activities on several of the wells onsite. PCSM/Site Restoration plans have been partially implemented. Infiltration basins have been installed but the impervious gravel pad surface has not been reduced as depicted in the approved plans. A 2-year extension on site restoration was approved on 10/20/2017. The Department recommends the PCSM/Site Restoration plans be implemented as permitted by 10/20/2019 or modified to account for the impervious pad surface. |
2738679 | Primary Facility | 2018-06-05 | Routine/Complete Inspection | No Violations Noted | I met Luke Chesner and Levi Lee of Rockdale when I arrived. Coil tubing rig on location drilling out plugs on the 6H prior to moving to the 4H. I noted two areas on the pad that were wet and muddy, one between the coil tubing rig and a pump truck (approximately 5-8 gallons of free water and 30' x 40'), and one between two Baker tank batteries (approximately 10-15 gallons of free water and 30' x 50'). Conductance reading in the former was 9.22 mS/cm, and was over the limit of my meter (19.99mS/cm) in the latter. I pointed both of these areas out to Luke and Levi, and took a grab sample (ID#0939066) from a puddle in the area between the Baker tank batteries. Luke and Levi had a vac truck working in the area between the pump truck and the coil tubing rig almost immediately, and I recommended that they vac the area between the Baker tank batteries and start to remove the affected soil ASAP. The elevated conductance in these areas is an indication of a potential release of produced water or flowback to the |
2761140 | Primary Facility | 2018-08-06 | Incident- Response to Accident or Event | No Violations Noted | I arrived on site in response to a spill notification from Rockdale called in at 09:45 on 8/4/18. Regina Logue of Rockdale reported that approximately 2 barrels of potentially contaminated rainwater was released to the pad due to a failed containment, and stated that the release was near the aboveground storage tank. The only person present at the pad when I arrived was Brady Bryington of Principal Enterprise. He pointed out the area of the release, and when I inquired informed me that the AST contained fresh water. I screened the release area, which was at the corner of an upright tank containment, with my soil conductance meter; most readings were in the range of .10-2.2 mS/cm, and the readings dropped dramatically when I pushed the meter 1/4" into the soil. I did locate a spot that seemed to be somewhat removed from the spill area near the center of the upright tank containment that was over limit on my soil meter (greater than 4.0 mS/cm). Towards the rock-lined ditch from the release area, soil con |
2791184 | Primary Facility | 2018-10-17 | Routine/Partial Inspection | No Violations Noted | No activity on site. Due to time constraints, only a partial inspection was performed. Site had a large puddle (50-100 gallons) present in the area of the release documented in the 6/5/18 inspection. Soil conductance readings in this area ranged from .20-.53 mS/cm. Violations remain outstanding. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2118705 | 654842 | 11/19/2012 | 2012-11-19 | 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling | Administrative | the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection |
2118705 | 654843 | 11/19/2012 | 2012-11-19 | 201E - Failure to comply with terms and conditions of permit | Environmental Health & Safety | the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection |
For data sources see[8]