If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(10 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | __TOC__ | ||
== Well Details == | == Well Details == | ||
− | {| class="wikitable" width="95%" | + | {| class="wikitable welldetails" width="95%" |
| Well ID: 37-081-20175 | | Well ID: 37-081-20175 | ||
− | | style=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.247307, -76.649366 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Pennsylvania |
|- | |- | ||
− | | Operator Name: [[ | + | | County: [[Lycoming_County,_Pennsylvania|Lycoming]] |
+ | |- | ||
+ | | Municipality: [[Penn Township,_Lycoming_County,_Pennsylvania|Penn Township]] | ||
+ | |- | ||
+ | | Operator Name: [[XTO ENERGY INC]] | ||
|- | |- | ||
| Well Pad ID: [[148831]] | | Well Pad ID: [[148831]] | ||
Line 14: | Line 19: | ||
| Farm/Lease Name: MARQUARDT 8494H | | Farm/Lease Name: MARQUARDT 8494H | ||
|- | |- | ||
− | | | + | | License Status: |
|- | |- | ||
− | | | + | | Spud Date: |
|- | |- | ||
− | | | + | | Permit Date: 2009-07-01 |
|- | |- | ||
− | | | + | | Well Type: GAS |
|- | |- | ||
− | | | + | | Unconventional Well: Y |
|- | |- | ||
− | | | + | | Configuration: Horizontal Well |
|- | |- | ||
− | | | + | | Conservation: No |
|- | |- | ||
− | | Latitude: 41. | + | | Latitude: 41.247307 |
|- | |- | ||
| Longitude: -76.649366 | | Longitude: -76.649366 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2009-07-01 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2009-09-24 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2009-10-19 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2009-11-21 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2010-03-23 | ||
+ | | DEVIATED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator Name | ||
+ | !scope="col" | Gas Quantity (mcf) | ||
+ | !scope="col" | Gas Production Days | ||
+ | !scope="col" | Oil Quantity (bbl) | ||
+ | !scope="col" | Oil Production Days | ||
+ | !scope="col" | Water Quantity (bbl) | ||
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | | 2009 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 779,199.00 | ||
+ | | style="text-align: right;" | 234 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 797,432.00 | ||
+ | | style="text-align: right;" | 363 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 612,389.00 | ||
+ | | style="text-align: right;" | 361 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 448,714.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 423,681.00 | ||
+ | | style="text-align: right;" | 364 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 338,026.00 | ||
+ | | style="text-align: right;" | 342 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 316,488.00 | ||
+ | | style="text-align: right;" | 354 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 256,388.00 | ||
+ | | style="text-align: right;" | 354 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 234,689.94 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 189,242.09 | ||
+ | | style="text-align: right;" | 364 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
+ | !scope="col" | Waste Type | ||
+ | !scope="col" | Quantity | ||
+ | !scope="col" | Disposal Method | ||
+ | !scope="col" | Waste Facility ID | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,036.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR119 | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 393.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0101508 | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,016.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0101508 | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 3,012.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0101508 | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 619.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0095273 | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 1,084.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0095273 | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 178.50 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0027057 | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 357.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR119 | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 125.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0027057 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 360.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR119 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 676.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-133-24096 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,483.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123NC001 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 131.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0095273 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 230.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-133-21076 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 305.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-133-24189 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 921.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 417.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-133-21076 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 108.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-133-21076 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 116.00 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR119 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 215.00 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 88.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 356.43 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR119 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 87.14 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123NC010 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 106.02 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 109.19 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123NC010 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 251.35 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NC010 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 19.86 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 120.38 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123NC010 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 103.33 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 236.33 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 150.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NC010 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 88.00 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
+ | | title =Oil and Gas Waste Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
+ | !scope="col" | Inspection Comments | ||
|- | |- | ||
| 1824236 | | 1824236 | ||
+ | | Primary Facility | ||
| 2009-08-27 | | 2009-08-27 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Site construction nearly complete. | | Site construction nearly complete. | ||
− | |||
− | |||
|- | |- | ||
| 1825770 | | 1825770 | ||
+ | | Primary Facility | ||
| 2009-09-02 | | 2009-09-02 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Site construction complete, rig components starting to arrive. | | Site construction complete, rig components starting to arrive. | ||
− | |||
− | |||
|- | |- | ||
| 1832320 | | 1832320 | ||
+ | | Primary Facility | ||
| 2009-09-14 | | 2009-09-14 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
− | |||
| | | | ||
− | |||
|- | |- | ||
| 1832326 | | 1832326 | ||
+ | | Primary Facility | ||
| 2009-10-01 | | 2009-10-01 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| rig@2758 ft deep making bit trip out of hole | | rig@2758 ft deep making bit trip out of hole | ||
− | |||
− | |||
|- | |- | ||
| 1835386 | | 1835386 | ||
+ | | Primary Facility | ||
| 2009-10-07 | | 2009-10-07 | ||
+ | | Routine/Complete Inspection | ||
| Violation(s) Noted | | Violation(s) Noted | ||
| Plan not reflective of site condtions. BMP maintainence and implentation. thrird page NOV. MAB | | Plan not reflective of site condtions. BMP maintainence and implentation. thrird page NOV. MAB | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1838327 | | 1838327 | ||
+ | | Primary Facility | ||
| 2009-10-27 | | 2009-10-27 | ||
+ | | Routine/Complete Inspection | ||
| Violation(s) Noted | | Violation(s) Noted | ||
| drill pit is with in 2ft free board violation. called company man and a water truck was going to location to haul water to xto frac pit. | | drill pit is with in 2ft free board violation. called company man and a water truck was going to location to haul water to xto frac pit. | ||
− | |||
− | |||
|- | |- | ||
| 1840712 | | 1840712 | ||
+ | | Primary Facility | ||
| 2009-10-29 | | 2009-10-29 | ||
+ | | Compliance Evaluation | ||
| Outstanding Violations - No Viols Req'd | | Outstanding Violations - No Viols Req'd | ||
| Scheduled inspection with XTO reps. to discuss violations cited on 10/7/2009 (Inspection record # 1835386). | | Scheduled inspection with XTO reps. to discuss violations cited on 10/7/2009 (Inspection record # 1835386). | ||
− | |||
− | |||
|- | |- | ||
| 1852539 | | 1852539 | ||
+ | | Primary Facility | ||
| 2009-12-21 | | 2009-12-21 | ||
+ | | Compliance Evaluation | ||
| Violation(s) Noted | | Violation(s) Noted | ||
| | | | ||
− | |||
|- | |- | ||
− | | | + | | 1857578 |
− | | | + | | Primary Facility |
− | | | + | | 2010-01-19 |
+ | | Follow-up Inspection | ||
| Violation(s) Noted | | Violation(s) Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 1859247 | | 1859247 | ||
+ | | Primary Facility | ||
| 2009-12-03 | | 2009-12-03 | ||
+ | | Compliance Evaluation | ||
| Outstanding Violations - No Viols Req'd | | Outstanding Violations - No Viols Req'd | ||
| | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1866425 | | 1866425 | ||
+ | | Primary Facility | ||
| 2010-03-01 | | 2010-03-01 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| called mike hann with xto in indaiana pa office he told me they have no one in the area with production or completions at this time. he called their company man at the king location at the nabors rig m-43 and is sending him to the location. we checked the pressure on the annulis and it was shut and had 100 lbs psi on it.it was opened and let bleed off. will check it late 3-2-10 to make sure it is dead and not blowing gas . | | called mike hann with xto in indaiana pa office he told me they have no one in the area with production or completions at this time. he called their company man at the king location at the nabors rig m-43 and is sending him to the location. we checked the pressure on the annulis and it was shut and had 100 lbs psi on it.it was opened and let bleed off. will check it late 3-2-10 to make sure it is dead and not blowing gas . | ||
− | |||
− | |||
|- | |- | ||
| 1866797 | | 1866797 | ||
+ | | Primary Facility | ||
| 2010-03-01 | | 2010-03-01 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 1867913 | | 1867913 | ||
+ | | Primary Facility | ||
| 2010-03-05 | | 2010-03-05 | ||
+ | | Follow-up Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 1871321 | | 1871321 | ||
+ | | Primary Facility | ||
| 2010-03-03 | | 2010-03-03 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| checked annulus very little gas coming out needle valve not opened all the way, opened it and will check mar 4th to check gas flow. | | checked annulus very little gas coming out needle valve not opened all the way, opened it and will check mar 4th to check gas flow. | ||
− | |||
− | |||
|- | |- | ||
| 1918000 | | 1918000 | ||
+ | | Primary Facility | ||
| 2010-10-06 | | 2010-10-06 | ||
+ | | Follow-up Inspection | ||
| Violation(s) Noted | | Violation(s) Noted | ||
| No well tag | | No well tag | ||
− | |||
− | |||
|- | |- | ||
| 1928969 | | 1928969 | ||
+ | | Primary Facility | ||
| 2010-11-16 | | 2010-11-16 | ||
+ | | Follow-up Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 2015231 | | 2015231 | ||
+ | | Primary Facility | ||
| 2011-10-28 | | 2011-10-28 | ||
+ | | Follow-up Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Inspected impoundment and pad. Found apparent seep near W corner fill slope. Cond. appr. 1mS/cm Impoundment water v. low conduct. Some holes/rips at top of impound. liner. | | Inspected impoundment and pad. Found apparent seep near W corner fill slope. Cond. appr. 1mS/cm Impoundment water v. low conduct. Some holes/rips at top of impound. liner. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2135506 | | 2135506 | ||
+ | | Primary Facility | ||
| 2013-01-24 | | 2013-01-24 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
+ | |- | ||
+ | | 2523348 | ||
+ | | Primary Facility | ||
+ | | 2016-08-09 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
| | | | ||
|- | |- | ||
− | | | + | | 2531206 |
− | + | | Primary Facility | |
− | + | | 2016-10-20 | |
− | + | | Routine/Complete Inspection | |
− | + | | No Violations Noted | |
− | + | | Routine Inspection; 10/20/2016. | |
− | + | XTO notified the Department that the liner of the FWI (Fresh Water Impoundment) was power-washed and remaining water and solids were removed for disposal. At 11:30 I entered the site and discovered rain water was accumulated in the bottom of the FWI and a ring was visible where the solids had accumulated. According to the XTO, the accumulated rain water will be removed Monday and sampling (according to XTO’s response) is scheduled to begin Tuesday 10/25/2016. At the time of the inspections, the liner in the FWI appeared to be in good condition and minimal rain water had accumulated. Violations remain outstanding. | |
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 2541396 |
− | | | + | | Primary Facility |
− | | | + | | 2016-12-01 |
− | | | + | | Routine/Complete Inspection |
− | | | + | | No Violations Noted |
− | + | | Routine Inspection; 12/1/2016. | |
− | + | Prior to the site inspection, XTO removed the plastic impoundment liner and restored the site to approximate original contours but has not yet implemented the PCSM Plans. I recommend stabilizing the recently disturbed soils within 4 days. | |
+ | |||
+ | The Department acknowledged the results from the soil sampling under the Fresh Water Impoundment were below the PA DEP Medium–Specific Concentration’s (MSC’s) on 11/15/2016 and recommended the removal of soils where Barium was detected above background concentrations. On 11/30/2016, XTO notified the Department that 1 roll-off box of soil was removed from underneath the tear in the plastic impoundment liner (see the email attached). Since the soils were characterized and the results were below the PA DEP Medium–Specific Concentration’s, violations are considered closed. No Violations Noted. | ||
|- | |- | ||
+ | | 2639369 | ||
+ | | Primary Facility | ||
+ | | 2017-09-19 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | The wells are in production and production tanks were recently replaced. The area formerly containing an impoundment was reclaimed and the landowner planted corn. Overall, the site looks good but the site is not permanently stabilized with vegetation. No violations noted. | ||
|- | |- | ||
− | | | + | | 2764510 |
− | | | + | | Primary Facility |
− | | | + | | 2018-08-16 |
− | | | + | | Site Restoration |
− | + | | No Violations Noted | |
− | + | | Notice of Termination/Well Site Restoration Inspection. At the time of the inspection, two wells were in production and no one else was onsite. The site is permanently stabilized and the site conforms with the Post Construction Stormwater Management (PCSM)/Site Restoration Plans depicted in the ESCGP. No additional equipment or materials are being stored onsite by the operator but the landowner is storing a single-axle trailer onsite. I recommend approving the Notice of Termination for the ESCGP and the Well Site Restoration Report. No violations noted. | |
− | |||
|- | |- | ||
+ | | 2791557 | ||
+ | | Primary Facility | ||
+ | | 2018-10-19 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Two wells staged for production phase. Two water separators within containment. No leaks detected from production equipment. No violations noted. | ||
|- | |- | ||
− | | | + | | 2791559 |
− | | | + | | Primary Facility |
− | | | + | | 2018-10-19 |
− | | | + | | Routine/Complete Inspection |
− | + | | No Violations Noted | |
− | + | | Two wells staged for production phase. Two water separators within containment. No leaks detected from production equipment. No violations noted. | |
− | |||
|- | |- | ||
+ | |} | ||
+ | ==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Violation Date | ||
+ | !scope="col" | Date Resolved | ||
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
|- | |- | ||
− | | | + | | 1835386 |
− | | | + | | 573381 |
− | | | + | | 10/07/2009 |
− | | | + | | 2009-10-07 |
− | + | | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | |
− | | | + | | Environmental Health & Safety |
− | | | + | | BMP maintainence and implementation |
|- | |- | ||
+ | | 1835386 | ||
+ | | 573382 | ||
+ | | 10/07/2009 | ||
+ | | 2009-10-07 | ||
+ | | 102.4INADPLN - E&S Plan not adequate | ||
+ | | Administrative | ||
+ | | plan does not reflect site conditions | ||
|- | |- | ||
− | | | + | | 1838327 |
− | | | + | | 574225 |
− | | | + | | 10/27/2009 |
− | | | + | | 2009-10-27 |
− | + | | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | |
− | | | + | | Administrative |
− | | | + | | |
|- | |- | ||
+ | | 1852539 | ||
+ | | 578611 | ||
+ | | 12/21/2009 | ||
+ | | 2009-12-21 | ||
+ | | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | ||
+ | | Environmental Health & Safety | ||
+ | | 102.4(b)(4) | ||
|- | |- | ||
− | | | + | | 1852539 |
− | | | + | | 578612 |
− | | | + | | 12/21/2009 |
− | | | + | | 2009-12-21 |
− | + | | 78.62 - Improper encapsulation of waste | |
− | | | + | | Administrative |
− | | | + | | Punctured or perforated liner |
|- | |- | ||
+ | | 1857578 | ||
+ | | 579826 | ||
+ | | 01/19/2010 | ||
+ | | 2010-01-19 | ||
+ | | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | ||
+ | | Administrative | ||
+ | | See Insp ID 1866797 done 3/1/10, past freeboard viol corrected/closed. Freeboard violation is the drill cutting pit. | ||
|- | |- | ||
− | | | + | | 1918000 |
− | | | + | | 596624 |
− | | | + | | 10/06/2010 |
− | + | | 2010-10-06 | |
− | | | + | | 201TAG - Failure to install, in a permanent manner, the permit number on a completed well |
− | | | + | | Administrative |
− | | | + | | |
|- | |- | ||
|} | |} | ||
− | == | + | ==== Penalties Applied ==== |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Violation ID |
− | !scope="col" | | + | !scope="col" | Penalty ID |
− | + | !scope="col" | Penalty Code | |
− | !scope="col" | | + | !scope="col" | Penalty Status |
− | !scope="col" | | + | !scope="col" | Penalty Date |
− | !scope="col" | | + | !scope="col" | Enforcement Date |
− | !scope="col" | | + | !scope="col" | Penalty Amount |
− | !scope="col" | | + | !scope="col" | Amount Collected |
− | !scope="col" | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 579826 |
− | + | | 254376 | |
− | + | | NOV - Notice of Violation | |
− | + | | Comply/Closed | |
− | + | | | |
− | + | | 2010-03-01 | |
− | + | | style="text-align: right;" | | |
− | + | | style="text-align: right;" | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | |||
− | |||
− | | 2010- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | style="text-align:right;" | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | style="text-align:right;" | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Compliance Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Pennsylvania Wells]] |
Well ID: 37-081-20175 | |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Penn Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148831 | |
Farm/Lease Name: MARQUARDT 8494H | |
License Status: | |
Spud Date: | |
Permit Date: 2009-07-01 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.247307 | |
Longitude: -76.649366 |
Date | Event |
---|---|
2009-07-01 | New Permit Application |
2009-09-24 | Performed Spud Operation |
2009-10-19 | Drilling Completion |
2009-11-21 | Perforation |
2010-03-23 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | XTO ENERGY INC | 779,199.00 | 234 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 797,432.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 612,389.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 448,714.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 423,681.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 338,026.00 | 342 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 316,488.00 | 354 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 256,388.00 | 354 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 234,689.94 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 189,242.09 | 364 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | XTO ENERGY INC | Produced Fluid | 1,036.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | XTO ENERGY INC | Fracing Fluid Waste | 393.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | XTO ENERGY INC | Produced Fluid | 1,016.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | XTO ENERGY INC | Drilling Fluid Waste | 3,012.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | XTO ENERGY INC | Produced Fluid | 619.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | XTO ENERGY INC | Fracing Fluid Waste | 1,084.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | XTO ENERGY INC | Fracing Fluid Waste | 178.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0027057 |
2010 | XTO ENERGY INC | Fracing Fluid Waste | 357.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | XTO ENERGY INC | Produced Fluid | 125.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0027057 |
2011 | XTO ENERGY INC | Produced Fluid | 360.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011 | XTO ENERGY INC | Produced Fluid | 676.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2011 | XTO ENERGY INC | Produced Fluid | 1,483.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC001 |
2011 | XTO ENERGY INC | Produced Fluid | 131.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | XTO ENERGY INC | Produced Fluid | 230.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2012 | XTO ENERGY INC | Produced Fluid | 305.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid | 921.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | XTO ENERGY INC | Produced Fluid | 417.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 108.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 116.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | XTO ENERGY INC | Produced Fluid | 215.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | XTO ENERGY INC | Produced Fluid | 88.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2014 | XTO ENERGY INC | Produced Fluid | 356.43 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | XTO ENERGY INC | Produced Fluid | 87.14 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2015 | XTO ENERGY INC | Produced Fluid | 106.02 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 109.19 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 251.35 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 19.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 120.38 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 103.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2017 | XTO ENERGY INC | Produced Fluid | 236.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | XTO ENERGY INC | Produced Fluid | 150.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | XTO ENERGY INC | Produced Fluid | 88.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1824236 | Primary Facility | 2009-08-27 | Routine/Complete Inspection | No Violations Noted | Site construction nearly complete. |
1825770 | Primary Facility | 2009-09-02 | Routine/Complete Inspection | No Violations Noted | Site construction complete, rig components starting to arrive. |
1832320 | Primary Facility | 2009-09-14 | Drilling/Alteration | No Violations Noted | |
1832326 | Primary Facility | 2009-10-01 | Drilling/Alteration | No Violations Noted | rig@2758 ft deep making bit trip out of hole |
1835386 | Primary Facility | 2009-10-07 | Routine/Complete Inspection | Violation(s) Noted | Plan not reflective of site condtions. BMP maintainence and implentation. thrird page NOV. MAB |
1838327 | Primary Facility | 2009-10-27 | Routine/Complete Inspection | Violation(s) Noted | drill pit is with in 2ft free board violation. called company man and a water truck was going to location to haul water to xto frac pit. |
1840712 | Primary Facility | 2009-10-29 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | Scheduled inspection with XTO reps. to discuss violations cited on 10/7/2009 (Inspection record # 1835386). |
1852539 | Primary Facility | 2009-12-21 | Compliance Evaluation | Violation(s) Noted | |
1857578 | Primary Facility | 2010-01-19 | Follow-up Inspection | Violation(s) Noted | |
1859247 | Primary Facility | 2009-12-03 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | |
1866425 | Primary Facility | 2010-03-01 | Routine/Complete Inspection | No Violations Noted | called mike hann with xto in indaiana pa office he told me they have no one in the area with production or completions at this time. he called their company man at the king location at the nabors rig m-43 and is sending him to the location. we checked the pressure on the annulis and it was shut and had 100 lbs psi on it.it was opened and let bleed off. will check it late 3-2-10 to make sure it is dead and not blowing gas . |
1866797 | Primary Facility | 2010-03-01 | Routine/Complete Inspection | No Violations Noted | |
1867913 | Primary Facility | 2010-03-05 | Follow-up Inspection | No Violations Noted | |
1871321 | Primary Facility | 2010-03-03 | Routine/Complete Inspection | No Violations Noted | checked annulus very little gas coming out needle valve not opened all the way, opened it and will check mar 4th to check gas flow. |
1918000 | Primary Facility | 2010-10-06 | Follow-up Inspection | Violation(s) Noted | No well tag |
1928969 | Primary Facility | 2010-11-16 | Follow-up Inspection | No Violations Noted | |
2015231 | Primary Facility | 2011-10-28 | Follow-up Inspection | No Violations Noted | Inspected impoundment and pad. Found apparent seep near W corner fill slope. Cond. appr. 1mS/cm Impoundment water v. low conduct. Some holes/rips at top of impound. liner. |
2135506 | Primary Facility | 2013-01-24 | Routine/Complete Inspection | No Violations Noted | |
2523348 | Primary Facility | 2016-08-09 | Routine/Complete Inspection | No Violations Noted | |
2531206 | Primary Facility | 2016-10-20 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 10/20/2016.
XTO notified the Department that the liner of the FWI (Fresh Water Impoundment) was power-washed and remaining water and solids were removed for disposal. At 11:30 I entered the site and discovered rain water was accumulated in the bottom of the FWI and a ring was visible where the solids had accumulated. According to the XTO, the accumulated rain water will be removed Monday and sampling (according to XTO’s response) is scheduled to begin Tuesday 10/25/2016. At the time of the inspections, the liner in the FWI appeared to be in good condition and minimal rain water had accumulated. Violations remain outstanding. |
2541396 | Primary Facility | 2016-12-01 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 12/1/2016.
Prior to the site inspection, XTO removed the plastic impoundment liner and restored the site to approximate original contours but has not yet implemented the PCSM Plans. I recommend stabilizing the recently disturbed soils within 4 days. The Department acknowledged the results from the soil sampling under the Fresh Water Impoundment were below the PA DEP Medium–Specific Concentration’s (MSC’s) on 11/15/2016 and recommended the removal of soils where Barium was detected above background concentrations. On 11/30/2016, XTO notified the Department that 1 roll-off box of soil was removed from underneath the tear in the plastic impoundment liner (see the email attached). Since the soils were characterized and the results were below the PA DEP Medium–Specific Concentration’s, violations are considered closed. No Violations Noted. |
2639369 | Primary Facility | 2017-09-19 | Routine/Complete Inspection | No Violations Noted | The wells are in production and production tanks were recently replaced. The area formerly containing an impoundment was reclaimed and the landowner planted corn. Overall, the site looks good but the site is not permanently stabilized with vegetation. No violations noted. |
2764510 | Primary Facility | 2018-08-16 | Site Restoration | No Violations Noted | Notice of Termination/Well Site Restoration Inspection. At the time of the inspection, two wells were in production and no one else was onsite. The site is permanently stabilized and the site conforms with the Post Construction Stormwater Management (PCSM)/Site Restoration Plans depicted in the ESCGP. No additional equipment or materials are being stored onsite by the operator but the landowner is storing a single-axle trailer onsite. I recommend approving the Notice of Termination for the ESCGP and the Well Site Restoration Report. No violations noted. |
2791557 | Primary Facility | 2018-10-19 | Routine/Complete Inspection | No Violations Noted | Two wells staged for production phase. Two water separators within containment. No leaks detected from production equipment. No violations noted. |
2791559 | Primary Facility | 2018-10-19 | Routine/Complete Inspection | No Violations Noted | Two wells staged for production phase. Two water separators within containment. No leaks detected from production equipment. No violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1835386 | 573381 | 10/07/2009 | 2009-10-07 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | BMP maintainence and implementation |
1835386 | 573382 | 10/07/2009 | 2009-10-07 | 102.4INADPLN - E&S Plan not adequate | Administrative | plan does not reflect site conditions |
1838327 | 574225 | 10/27/2009 | 2009-10-27 | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | Administrative | |
1852539 | 578611 | 12/21/2009 | 2009-12-21 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | 102.4(b)(4) |
1852539 | 578612 | 12/21/2009 | 2009-12-21 | 78.62 - Improper encapsulation of waste | Administrative | Punctured or perforated liner |
1857578 | 579826 | 01/19/2010 | 2010-01-19 | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | Administrative | See Insp ID 1866797 done 3/1/10, past freeboard viol corrected/closed. Freeboard violation is the drill cutting pit. |
1918000 | 596624 | 10/06/2010 | 2010-10-06 | 201TAG - Failure to install, in a permanent manner, the permit number on a completed well | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
579826 | 254376 | NOV - Notice of Violation | Comply/Closed | 2010-03-01 |
For data sources see[7]