If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-081-20421 | | Well ID: 37-081-20421 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.257828, -76.516008 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 24: | Line 24: | ||
|- | |- | ||
| Permit Date: 2010-12-01 | | Permit Date: 2010-12-01 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
|- | |- | ||
| Configuration: Horizontal Well | | Configuration: Horizontal Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 41.257828 | | Latitude: 41.257828 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2010-12-01 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 71: | Line 89: | ||
!scope="col" | Job Percentage by Mass | !scope="col" | Job Percentage by Mass | ||
!scope="col" | Mass Used (lb) | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
|- | |- | ||
|}--> | |}--> |
Well ID: 37-081-20421 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.257828,"lon":-76.516008,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Jordan Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: SHANER 8507H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-12-01 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.257828 | |
Longitude: -76.516008 |
Date | Event |
---|---|
2010-12-01 | New Permit Application |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1957465 | Primary Facility | 2011-03-08 | Routine/Partial Inspection | No Violations Noted | |
1968086 | Primary Facility | 2011-04-19 | Routine/Partial Inspection | Violation(s) Noted | |
1978155 | Primary Facility | 2011-05-31 | Routine/Partial Inspection | No Violations Noted | |
2015239 | Primary Facility | 2011-10-26 | Routine/Complete Inspection | Violation(s) Noted | |
2021877 | Primary Facility | 2011-11-16 | Routine/Partial Inspection | Violation(s) & Outstanding Violations | |
2028173 | Primary Facility | 2011-12-06 | Routine/Partial Inspection | Violation(s) & Outstanding Violations | |
2035597 | Primary Facility | 2012-01-18 | Routine/Complete Inspection | Violation(s) Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1968086 | 609456 | 04/19/2011 | 2011-04-19 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
1968086 | 609457 | 04/19/2011 | 2011-04-19 | CSL401CAUSPL - Polluting substance(s) allowed to discharge into Waters of the Commonwealth | Environmental Health & Safety | Sediment pollution to waters of the Commonwealth |
2015239 | 623529 | 10/26/2011 | 2011-10-26 | 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. | Administrative | Erosion gully, W side road runs approx 1000'. No rock lining, no E&S apparent. E&S BMPs are not in place to minimize the potential for accelerated erosion. |
2015239 | 623530 | 10/26/2011 | 2011-10-26 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | Access road, E side, rock-lined ditch. Toward base of road, ditch broken and extends into another erosion feature, perhaps a pre-existing ditch or intermittent stream. Erosion feature is choked with gravel and sediment from the road. E&S BMPs not maint. |
2015239 | 623531 | 10/26/2011 | 2011-10-26 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | Gravel is piled up on the site boundary. Appears to have been scraped of the road. |
2015239 | 623532 | 10/26/2011 | 2011-10-26 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | Gravel and sediment are choking ditch that moves of f to the west toward a stream that flows south. Stream located off western boundary of the site. |
2021877 | 625429 | 11/16/2011 | 2011-11-16 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | Follow-up from inspection on 10-26-11. Erosion and sedimentation controls not in place on gully to west side of access road, approx 1000' long. |
2021877 | 625430 | 11/16/2011 | 2011-11-16 | 401CSL - Discharge of pollultional material to waters of Commonwealth. | Environmental Health & Safety | muddy water coursing down the west side gully to the access road was entering UNT |
2028173 | 627329 | 12/06/2011 | 2011-12-06 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | Erosion is not being minimized on east side of access road near top of hill. |
2028173 | 627330 | 12/06/2011 | 2011-12-06 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | Failure to maintain -- this citation is consistent with the inspection form. Culverts are blocked with sediment. There is a growing erosion feature coming from the edge of the rock apron. |
2028173 | 627331 | 12/06/2011 | 2011-12-06 | 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. | Administrative | Drawing needed for location on east side of access road where water jumped to natural trench. |
2035597 | 629792 | 01/18/2012 | 2012-01-18 | 102.4INADPLN - E&S Plan not adequate | Administrative | 102.4(b)5(i). Failure to depict topographic features -- natural trench to the east of access road. |
2035597 | 629793 | 01/18/2012 | 2012-01-18 | 102.4INADPLN - E&S Plan not adequate | Administrative | 102.4(b)5(v) Failure to describe and depict waters of the Commonwealth -- natural ditch not shown on E&S plan. |
2035597 | 629794 | 01/18/2012 | 2012-01-18 | 102.4INADPLN - E&S Plan not adequate | Administrative | 102.4(b)5(i). Failure to depict topographical features. UNT to West of location not depicted. |
2035597 | 629795 | 01/18/2012 | 2012-01-18 | 102.4INADPLN - E&S Plan not adequate | Administrative | 102.4(b)5(v) Failure to describe and depict waters that may receive run-off. UNT to the west of the access road not depicted on E&S plan. |
2035597 | 629796 | 01/18/2012 | 2012-01-18 | 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. | Administrative | Previous inspection report 11/16/11, 2021872 requested angineered plan modification to address natural trench. Modified plan or notice of modification not received by DEP |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
627329 | 278472 | NOV - Notice of Violation | Administrative Close Out | 2014-11-12 | |||
627330 | 278472 | NOV - Notice of Violation | Administrative Close Out | 2014-11-12 | |||
627331 | 278472 | NOV - Notice of Violation | Administrative Close Out | 2014-11-12 | |||
629792 | 279649 | NOV - Notice of Violation | Administrative Close Out | 2012-01-30 | |||
629792 | 294639 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2013-02-27 | 2013-02-27 | $30,136.00 | $30,136.00 |
629793 | 279649 | NOV - Notice of Violation | Administrative Close Out | 2012-01-30 | |||
629793 | 294639 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2013-02-27 | 2013-02-27 | $30,136.00 | $30,136.00 |
629794 | 279649 | NOV - Notice of Violation | Administrative Close Out | 2012-01-30 | |||
629794 | 294639 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2013-02-27 | 2013-02-27 | $30,136.00 | $30,136.00 |
629795 | 279649 | NOV - Notice of Violation | Administrative Close Out | 2012-01-30 | |||
629795 | 294639 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2013-02-27 | 2013-02-27 | $30,136.00 | $30,136.00 |
629796 | 279649 | NOV - Notice of Violation | Administrative Close Out | 2012-01-30 | |||
629796 | 294639 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2013-02-27 | 2013-02-27 | $30,136.00 | $30,136.00 |
For data sources see[6]