X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0365031804020"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0365031804020
 
| Well ID: 0365031804020
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.089385, -114.426297 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.089385, -114.426297 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 02/04-18-036-03W5/0
 
| Location: 02/04-18-036-03W5/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 02/04-18-036-03 W5/00
 
| Location Alias 2: 02/04-18-036-03 W5/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 036
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 03
 +
|-
 +
| Section: 18
 
|-
 
|-
 
| County/Municipality: [[Red Deer County,_Alberta|Red Deer County]]
 
| County/Municipality: [[Red Deer County,_Alberta|Red Deer County]]
Line 17: Line 27:
 
| Well Name: KEYERA LANAWAY 4-18-36-3
 
| Well Name: KEYERA LANAWAY 4-18-36-3
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Keyera Energy Ltd.]]
 
|-
 
|-
 
| License Number: 0105623
 
| License Number: 0105623
Line 29: Line 39:
 
| Final Drill Date: 1984-03-18
 
| Final Drill Date: 1984-03-18
 
|-
 
|-
| Well Total Depth: 3154 m
+
| Well Total Depth: 3154.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 52.089385
 
| Surface Hole Latitude: 52.089385
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1984-02-01
 +
| Obtained License
 +
|-
 +
| 1984-02-07
 +
| Direction Drilling Operation Performed - 98
 +
|-
 +
| 1984-03-13
 +
| Well Log Performed
 +
|-
 +
| 1984-03-18
 +
| Finished Drilling
 +
|-
 +
| 1984-03-19
 +
| Well Log Performed
 +
|-
 +
| 1984-04-03
 +
| Lost Circulation Occurred
 +
|-
 +
| 1984-04-03
 +
| Production Casing Operation Performed
 +
|-
 +
| 1984-07-17
 +
| Well Log Performed
 +
|-
 +
| 1984-07-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1984-07-18
 +
| Well Log Performed
 +
|-
 +
| 1984-07-20
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1984-07-22
 +
| Well Log Performed
 +
|-
 +
| 1984-07-24
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1984-07-24
 +
| Well Log Performed
 +
|-
 +
| 1984-07-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1984-07-26
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1984-07-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1984-07-28
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1984-07-30
 +
| Well Log Performed
 +
|-
 +
| 1984-07-31
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1984-08-06
 +
| Well Log Performed
 +
|-
 +
| 1984-08-14
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1984-08-17
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1984-08-17
 +
| Well Log Performed
 +
|-
 +
| 1984-08-18
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1984-08-28
 +
| Well Log Performed
 +
|-
 +
| 1984-08-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1984-08-30
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1984-08-31
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1984-09-01
 +
| Well Log Performed
 +
|-
 +
| 1984-09-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1984-09-03
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1984-09-19
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1984-09-20
 +
| Well Log Performed
 +
|-
 +
| 1984-09-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1984-09-23
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1984-09-29
 +
| Well Log Performed
 +
|-
 +
| 1984-09-30
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1984-09-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1984-09-30
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1984-10-01
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1984-10-01
 +
| Well Log Performed
 +
|-
 +
| 1984-10-02
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1984-10-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1984-10-04
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1984-10-04
 +
| Well Log Performed
 +
|-
 +
| 1994-11-26
 +
| Well Log Performed
 +
|-
 +
| 1995-02-08
 +
| Well Log Performed
 +
|-
 +
| 1995-02-08
 +
| Well Mode changed to Abandoned and Whipstocked
 +
|-
 +
| 1998-12-04
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 235:
 
|-
 
|-
 
| 1984-02-07
 
| 1984-02-07
| style="text-align: right;" | 2640
+
| style="text-align: right;" | 2640.00
 
| Conversion
 
| Conversion
 
|-
 
|-
Line 70: Line 242:
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 83: Line 255:
 
| 1984-07-18
 
| 1984-07-18
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2974
+
| style="text-align: right;" | 2974.00
| style="text-align: right;" | 2977
+
| style="text-align: right;" | 2977.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-07-20
 
| 1984-07-20
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2974
+
| style="text-align: right;" | 2974.00
| style="text-align: right;" | 2977
+
| style="text-align: right;" | 2977.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-07-24
 
| 1984-07-24
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2974
+
| style="text-align: right;" | 2974.00
| style="text-align: right;" | 2977
+
| style="text-align: right;" | 2977.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-07-25
 
| 1984-07-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2914.5
+
| style="text-align: right;" | 2914.50
| style="text-align: right;" | 2915
+
| style="text-align: right;" | 2915.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-07-25
 
| 1984-07-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2965.5
+
| style="text-align: right;" | 2965.50
| style="text-align: right;" | 2966
+
| style="text-align: right;" | 2966.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-07-26
 
| 1984-07-26
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2914.5
+
| style="text-align: right;" | 2914.50
| style="text-align: right;" | 2966
+
| style="text-align: right;" | 2966.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-07-27
 
| 1984-07-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2932.5
+
| style="text-align: right;" | 2932.50
| style="text-align: right;" | 2933
+
| style="text-align: right;" | 2933.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-07-28
 
| 1984-07-28
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2914.5
+
| style="text-align: right;" | 2914.50
| style="text-align: right;" | 2933
+
| style="text-align: right;" | 2933.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-07-31
 
| 1984-07-31
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2952
+
| style="text-align: right;" | 2952.00
| style="text-align: right;" | 2961
+
| style="text-align: right;" | 2961.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-08-14
 
| 1984-08-14
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2952
+
| style="text-align: right;" | 2952.00
| style="text-align: right;" | 2961
+
| style="text-align: right;" | 2961.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-08-17
 
| 1984-08-17
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 2847
+
| style="text-align: right;" | 2847.00
| style="text-align: right;" | 2937
+
| style="text-align: right;" | 2937.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-08-18
 
| 1984-08-18
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2952
+
| style="text-align: right;" | 2952.00
| style="text-align: right;" | 2966
+
| style="text-align: right;" | 2966.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-08-29
 
| 1984-08-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2835
+
| style="text-align: right;" | 2835.00
| style="text-align: right;" | 2835.5
+
| style="text-align: right;" | 2835.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-08-29
 
| 1984-08-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2874
+
| style="text-align: right;" | 2874.00
| style="text-align: right;" | 2874.5
+
| style="text-align: right;" | 2874.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-08-30
 
| 1984-08-30
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2835
+
| style="text-align: right;" | 2835.00
| style="text-align: right;" | 2874.5
+
| style="text-align: right;" | 2874.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-08-31
 
| 1984-08-31
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2835
+
| style="text-align: right;" | 2835.00
| style="text-align: right;" | 2874.5
+
| style="text-align: right;" | 2874.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-09-02
 
| 1984-09-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2847
+
| style="text-align: right;" | 2847.00
| style="text-align: right;" | 2849
+
| style="text-align: right;" | 2849.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-09-02
 
| 1984-09-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2852
+
| style="text-align: right;" | 2852.00
| style="text-align: right;" | 2854
+
| style="text-align: right;" | 2854.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-09-02
 
| 1984-09-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2859.5
+
| style="text-align: right;" | 2859.50
| style="text-align: right;" | 2861.5
+
| style="text-align: right;" | 2861.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-09-02
 
| 1984-09-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2863.5
+
| style="text-align: right;" | 2863.50
| style="text-align: right;" | 2867.5
+
| style="text-align: right;" | 2867.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-09-03
 
| 1984-09-03
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2847
+
| style="text-align: right;" | 2847.00
| style="text-align: right;" | 2867.5
+
| style="text-align: right;" | 2867.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-09-19
 
| 1984-09-19
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2847
+
| style="text-align: right;" | 2847.00
| style="text-align: right;" | 2867.5
+
| style="text-align: right;" | 2867.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-09-21
 
| 1984-09-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2847
+
| style="text-align: right;" | 2847.00
| style="text-align: right;" | 2849
+
| style="text-align: right;" | 2849.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-09-21
 
| 1984-09-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2852
+
| style="text-align: right;" | 2852.00
| style="text-align: right;" | 2854
+
| style="text-align: right;" | 2854.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-09-23
 
| 1984-09-23
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2847
+
| style="text-align: right;" | 2847.00
| style="text-align: right;" | 2854
+
| style="text-align: right;" | 2854.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-09-30
 
| 1984-09-30
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2823
+
| style="text-align: right;" | 2823.00
| style="text-align: right;" | 2831
+
| style="text-align: right;" | 2831.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-09-30
 
| 1984-09-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2620
+
| style="text-align: right;" | 2620.00
| style="text-align: right;" | 2621
+
| style="text-align: right;" | 2621.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-09-30
 
| 1984-09-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2629
+
| style="text-align: right;" | 2629.00
| style="text-align: right;" | 2630
+
| style="text-align: right;" | 2630.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-10-01
 
| 1984-10-01
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2620
+
| style="text-align: right;" | 2620.00
| style="text-align: right;" | 2630
+
| style="text-align: right;" | 2630.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-10-02
 
| 1984-10-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2090
+
| style="text-align: right;" | 2090.00
| style="text-align: right;" | 2091
+
| style="text-align: right;" | 2091.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-10-02
 
| 1984-10-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2350
+
| style="text-align: right;" | 2350.00
| style="text-align: right;" | 2351
+
| style="text-align: right;" | 2351.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-10-02
 
| 1984-10-02
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2090
+
| style="text-align: right;" | 2090.00
| style="text-align: right;" | 2351
+
| style="text-align: right;" | 2351.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-10-04
 
| 1984-10-04
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2090
+
| style="text-align: right;" | 2090.00
| style="text-align: right;" | 2091
+
| style="text-align: right;" | 2091.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 283: Line 455:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 332: Line 518:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Alberta]][[Category:Wells]]
 
[[Category:Alberta]][[Category:Wells]]

Revision as of 08:01, 8 July 2020

Well Details

Well ID: 0365031804020
Loading map...
Location: 02/04-18-036-03W5/0
Location Alias: 02/04-18-36-03 W5M
Location Alias 2: 02/04-18-036-03 W5/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 03
Section: 18
County/Municipality: Red Deer County
Well Name: KEYERA LANAWAY 4-18-36-3
Operator Name: Keyera Energy Ltd.
License Number: 0105623
License Date: 1984-02-01
License Status: Abandoned
Spud Date: 1984-02-07
Final Drill Date: 1984-03-18
Well Total Depth: 3154.00 m
Surface Hole Latitude: 52.089385
Surface Hole Longitude: -114.426297

For data sources see[1][2]

Well History

Date Event
1984-02-01 Obtained License
1984-02-07 Direction Drilling Operation Performed - 98
1984-03-13 Well Log Performed
1984-03-18 Finished Drilling
1984-03-19 Well Log Performed
1984-04-03 Lost Circulation Occurred
1984-04-03 Production Casing Operation Performed
1984-07-17 Well Log Performed
1984-07-18 Perforation Treatment Performed - Jet Perforation
1984-07-18 Well Log Performed
1984-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-22 Well Log Performed
1984-07-24 Perforation Treatment Performed - Cement Squeeze
1984-07-24 Well Log Performed
1984-07-25 Perforation Treatment Performed - Jet Perforation
1984-07-26 Perforation Treatment Performed - Cement Squeeze
1984-07-27 Perforation Treatment Performed - Jet Perforation
1984-07-28 Perforation Treatment Performed - Cement Squeeze
1984-07-30 Well Log Performed
1984-07-31 Perforation Treatment Performed - Jet Perforation
1984-08-06 Well Log Performed
1984-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-17 Perforation Treatment Performed - Cement Plug
1984-08-17 Well Log Performed
1984-08-18 Perforation Treatment Performed - Cement Squeeze
1984-08-28 Well Log Performed
1984-08-29 Perforation Treatment Performed - Jet Perforation
1984-08-30 Perforation Treatment Performed - Cement Squeeze
1984-08-31 Perforation Treatment Performed - Cement Squeeze
1984-09-01 Well Log Performed
1984-09-02 Perforation Treatment Performed - Jet Perforation
1984-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-19 Perforation Treatment Performed - Cement Squeeze
1984-09-20 Well Log Performed
1984-09-21 Perforation Treatment Performed - Jet Perforation
1984-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-29 Well Log Performed
1984-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-09-30 Perforation Treatment Performed - Jet Perforation
1984-09-30 Well Mode changed to Drilled and Cased
1984-10-01 Perforation Treatment Performed - Cement Squeeze
1984-10-01 Well Log Performed
1984-10-02 Perforation Treatment Performed - Cement Squeeze
1984-10-02 Perforation Treatment Performed - Jet Perforation
1984-10-04 Perforation Treatment Performed - Cement Squeeze
1984-10-04 Well Log Performed
1994-11-26 Well Log Performed
1995-02-08 Well Log Performed
1995-02-08 Well Mode changed to Abandoned and Whipstocked
1998-12-04 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-02-07 2640.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-07-18 Perforation 2974.00 2977.00 13
1984-07-20 Acid Treatment 2974.00 2977.00 0
1984-07-24 Cement Squeeze 2974.00 2977.00 0
1984-07-25 Perforation 2914.50 2915.00 13
1984-07-25 Perforation 2965.50 2966.00 13
1984-07-26 Cement Squeeze 2914.50 2966.00 0
1984-07-27 Perforation 2932.50 2933.00 13
1984-07-28 Cement Squeeze 2914.50 2933.00 0
1984-07-31 Perforation 2952.00 2961.00 13
1984-08-14 Acid Treatment 2952.00 2961.00 0
1984-08-17 Cement Plug 2847.00 2937.00 0
1984-08-18 Cement Squeeze 2952.00 2966.00 0
1984-08-29 Perforation 2835.00 2835.50 13
1984-08-29 Perforation 2874.00 2874.50 13
1984-08-30 Cement Squeeze 2835.00 2874.50 0
1984-08-31 Cement Squeeze 2835.00 2874.50 0
1984-09-02 Perforation 2847.00 2849.00 13
1984-09-02 Perforation 2852.00 2854.00 13
1984-09-02 Perforation 2859.50 2861.50 13
1984-09-02 Perforation 2863.50 2867.50 13
1984-09-03 Acid Treatment 2847.00 2867.50 0
1984-09-19 Cement Squeeze 2847.00 2867.50 0
1984-09-21 Perforation 2847.00 2849.00 13
1984-09-21 Perforation 2852.00 2854.00 13
1984-09-23 Acid Treatment 2847.00 2854.00 0
1984-09-30 Packing Device Capped w/Cement 2823.00 2831.00 0
1984-09-30 Perforation 2620.00 2621.00 13
1984-09-30 Perforation 2629.00 2630.00 13
1984-10-01 Cement Squeeze 2620.00 2630.00 0
1984-10-02 Perforation 2090.00 2091.00 13
1984-10-02 Perforation 2350.00 2351.00 13
1984-10-02 Cement Squeeze 2090.00 2351.00 0
1984-10-04 Cement Squeeze 2090.00 2091.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-04-03 Lost Circulation 3154.00 3154.00

For data sources see[6]

References