X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0374172608002"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0374172608002
 
| Well ID: 0374172608002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.208096, -112.320037 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.208096, -112.320037 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/08-26-037-17W4/2
 
| Location: 00/08-26-037-17W4/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/08-26-037-17 W4/02
 
| Location Alias 2: 00/08-26-037-17 W4/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 037
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 17
 +
|-
 +
| Section: 26
 
|-
 
|-
 
| County/Municipality: [[County of Stettler No. 6,_Alberta|County of Stettler No. 6]]
 
| County/Municipality: [[County of Stettler No. 6,_Alberta|County of Stettler No. 6]]
Line 17: Line 27:
 
| Well Name: MCLAND HALKIRK 8-26-37-17
 
| Well Name: MCLAND HALKIRK 8-26-37-17
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[McLand Resources Ltd.]]
 
|-
 
|-
 
| License Number: 0111623
 
| License Number: 0111623
Line 29: Line 39:
 
| Final Drill Date: 1985-01-05
 
| Final Drill Date: 1985-01-05
 
|-
 
|-
| Well Total Depth: 1298 m
+
| Well Total Depth: 1298.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 52.208096
 
| Surface Hole Latitude: 52.208096
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1984-12-12
 +
| Obtained License
 +
|-
 +
| 1984-12-19
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1985-01-05
 +
| Finished Drilling
 +
|-
 +
| 1985-01-05
 +
| Well Log Performed
 +
|-
 +
| 1985-01-05
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1985-01-06
 +
| Drill Stem Test Performed
 +
|-
 +
| 1985-01-08
 +
| Production Casing Operation Performed
 +
|-
 +
| 1985-01-08
 +
| Rig Released
 +
|-
 +
| 1985-01-25
 +
| Well Log Performed
 +
|-
 +
| 1985-01-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1985-01-27
 +
| Well Log Performed
 +
|-
 +
| 1985-01-30
 +
| Well Log Performed
 +
|-
 +
| 1985-01-31
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1985-01-31
 +
| Well Log Performed
 +
|-
 +
| 1985-02-05
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1985-02-05
 +
| Well Log Performed
 +
|-
 +
| 1998-06-24
 +
| Well Log Performed
 +
|-
 +
| 1998-06-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-09-15
 +
| Well Began Production
 +
|-
 +
| 2000-09-15
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2000-09-15
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2009-07-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2009-07-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2011-03-18
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2011-03-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-03-18
 +
| Plug Back Performed
 +
|-
 +
| 2011-03-18
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2011-03-18
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2011-03-19
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2011-03-19
 +
| Plug Back Performed
 +
|-
 +
| 2011-03-20
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2011-03-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-03-20
 +
| Plug Back Performed
 +
|-
 +
| 2011-03-21
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2011-03-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-03-21
 +
| Plug Back Performed
 +
|-
 +
| 2011-03-22
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-03-23
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2011-03-23
 +
| Plug Back Performed
 +
|-
 +
| 2011-03-26
 +
| Well Abandoned
 +
|-
 +
| 2011-03-26
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2011-03-26
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 222:
 
| 1985-01-27
 
| 1985-01-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1256
+
| style="text-align: right;" | 1256.00
| style="text-align: right;" | 1257.5
+
| style="text-align: right;" | 1257.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1985-01-31
 
| 1985-01-31
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1246
+
| style="text-align: right;" | 1246.00
| style="text-align: right;" | 1248
+
| style="text-align: right;" | 1248.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1985-02-05
 
| 1985-02-05
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1233
+
| style="text-align: right;" | 1233.00
| style="text-align: right;" | 1241
+
| style="text-align: right;" | 1241.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998-06-25
 
| 1998-06-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1089.6
+
| style="text-align: right;" | 1089.60
| style="text-align: right;" | 1092
+
| style="text-align: right;" | 1092.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2011-03-18
 
| 2011-03-18
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1073
+
| style="text-align: right;" | 1073.00
| style="text-align: right;" | 1081
+
| style="text-align: right;" | 1081.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-03-18
 
| 2011-03-18
 
| Perforation
 
| Perforation
| style="text-align: right;" | 944
+
| style="text-align: right;" | 944.00
| style="text-align: right;" | 945
+
| style="text-align: right;" | 945.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2011-03-19
 
| 2011-03-19
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 944
+
| style="text-align: right;" | 944.00
| style="text-align: right;" | 945
+
| style="text-align: right;" | 945.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-03-20
 
| 2011-03-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 719
+
| style="text-align: right;" | 719.00
| style="text-align: right;" | 720
+
| style="text-align: right;" | 720.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2011-03-20
 
| 2011-03-20
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 719
+
| style="text-align: right;" | 719.00
| style="text-align: right;" | 720
+
| style="text-align: right;" | 720.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-03-21
 
| 2011-03-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 576
+
| style="text-align: right;" | 576.00
| style="text-align: right;" | 577
+
| style="text-align: right;" | 577.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2011-03-21
 
| 2011-03-21
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 576
+
| style="text-align: right;" | 576.00
| style="text-align: right;" | 577
+
| style="text-align: right;" | 577.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-03-22
 
| 2011-03-22
 
| Perforation
 
| Perforation
| style="text-align: right;" | 385.3
+
| style="text-align: right;" | 385.30
| style="text-align: right;" | 386.3
+
| style="text-align: right;" | 386.30
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2011-03-23
 
| 2011-03-23
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 385.3
+
| style="text-align: right;" | 385.30
| style="text-align: right;" | 386.3
+
| style="text-align: right;" | 386.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 154: Line 302:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 187: Line 349:
 
| 2000
 
| 2000
 
| style="text-align: right;" | 2278
 
| style="text-align: right;" | 2278
| style="text-align: right;" | 3643.4
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 193: Line 355:
 
| 2001
 
| 2001
 
| style="text-align: right;" | 5573
 
| style="text-align: right;" | 5573
| style="text-align: right;" | 1513.1
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 199: Line 361:
 
| 2002
 
| 2002
 
| style="text-align: right;" | 4728
 
| style="text-align: right;" | 4728
| style="text-align: right;" | 403.3
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 205: Line 367:
 
| 2003
 
| 2003
 
| style="text-align: right;" | 195
 
| style="text-align: right;" | 195
| style="text-align: right;" | 21.6
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 211: Line 373:
 
| 2004
 
| 2004
 
| style="text-align: right;" | 844
 
| style="text-align: right;" | 844
| style="text-align: right;" | 33.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 11.7
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 219: Line 381:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 16:15, 8 July 2020

Well Details

Well ID: 0374172608002
Loading map...
Location: 00/08-26-037-17W4/2
Location Alias: 00/08-26-37-17 W4M
Location Alias 2: 00/08-26-037-17 W4/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 17
Section: 26
County/Municipality: County of Stettler No. 6
Well Name: MCLAND HALKIRK 8-26-37-17
Operator Name: McLand Resources Ltd.
License Number: 0111623
License Date: 1984-12-12
License Status: Abandoned
Spud Date: 1984-12-18
Final Drill Date: 1985-01-05
Well Total Depth: 1298.00 m
Surface Hole Latitude: 52.208096
Surface Hole Longitude: -112.320037

For data sources see[1][2]

Well History

Date Event
1984-12-12 Obtained License
1984-12-19 Surface Casing Operation Performed
1985-01-05 Finished Drilling
1985-01-05 Well Log Performed
1985-01-05 Well Mode changed to Drilled and Cased
1985-01-06 Drill Stem Test Performed
1985-01-08 Production Casing Operation Performed
1985-01-08 Rig Released
1985-01-25 Well Log Performed
1985-01-27 Perforation Treatment Performed - Jet Perforation
1985-01-27 Well Log Performed
1985-01-30 Well Log Performed
1985-01-31 Perforation Treatment Performed - Jet Perforation
1985-01-31 Well Log Performed
1985-02-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-02-05 Well Log Performed
1998-06-24 Well Log Performed
1998-06-25 Perforation Treatment Performed - Jet Perforation
2000-09-15 Well Began Production
2000-09-15 Well Fluid changed to Gas
2000-09-15 Well Mode changed to Flowing
2009-07-01 Well Fluid changed to Gas
2009-07-01 Well Mode changed to Suspended
2011-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-18 Perforation Treatment Performed - Jet Perforation
2011-03-18 Plug Back Performed
2011-03-18 Well Fluid changed to Gas
2011-03-18 Well Mode changed to Abandoned Zone
2011-03-19 Perforation Treatment Performed - Cement Squeeze
2011-03-19 Plug Back Performed
2011-03-20 Perforation Treatment Performed - Cement Squeeze
2011-03-20 Perforation Treatment Performed - Jet Perforation
2011-03-20 Plug Back Performed
2011-03-21 Perforation Treatment Performed - Cement Squeeze
2011-03-21 Perforation Treatment Performed - Jet Perforation
2011-03-21 Plug Back Performed
2011-03-22 Perforation Treatment Performed - Jet Perforation
2011-03-23 Perforation Treatment Performed - Cement Squeeze
2011-03-23 Plug Back Performed
2011-03-26 Well Abandoned
2011-03-26 Well Fluid changed to Gas
2011-03-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-01-27 Perforation 1256.00 1257.50 13
1985-01-31 Perforation 1246.00 1248.00 13
1985-02-05 Packing Device Capped w/Cement 1233.00 1241.00 0
1998-06-25 Perforation 1089.60 1092.00 17
2011-03-18 Packing Device Capped w/Cement 1073.00 1081.00 0
2011-03-18 Perforation 944.00 945.00 17
2011-03-19 Cement Squeeze 944.00 945.00 0
2011-03-20 Perforation 719.00 720.00 17
2011-03-20 Cement Squeeze 719.00 720.00 0
2011-03-21 Perforation 576.00 577.00 17
2011-03-21 Cement Squeeze 576.00 577.00 0
2011-03-22 Perforation 385.30 386.30 17
2011-03-23 Cement Squeeze 385.30 386.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 2278 0.0 0.0 0.0
2001 5573 0.0 0.0 0.0
2002 4728 0.0 0.0 0.0
2003 195 0.0 0.0 0.0
2004 844 0.0 0.0 0.0

For data sources see[5]

References